Duke Lesley-CS080114 (2)
01/14/2008 15:52
8177591888
EWI EWL
PAGE 02/05
Ellerbee-Walczak, Inc.
GEOTECHNICAL ENGINEERING &
CONSTRUCTION MATERIALS TESTING SERVICES
.:January 14, 2008
Mr. KevIn Briles
LH. Lacy Co.
PO ISOx 541297
Dallas, TX 75354-1297
Re: Dividend Read
Dear Kevin,
The swiss hammer test results and08fJCl wen performed on o.eernb.. 14, 2007. EWl Vias
instruGted to perform swl_hammer testing M tM locations prevIousty cored on
November 11,2007. After obtaining aha.....,.........' at eaell cored location, EWI was
instructed to perform a swisl ham.... every 200 I.f. at Mc:h ..... of the Boulevard. After
performing a swill ham.... at each Iocatian !WI d..rmiMd that the readings at the non-
cored locations were equal tD or exceeded the hammer nNldIng at coring locations.
please feel free to catlwith any questions at 817-759-9999.
Z)~
Curtis W. Hawk, C.2.T.
,t4l ~
T. Neill Lawrence, Jr., P.!.
Ikr
4501 8roadwoy Ave. . P.O. Box 14809 · Haltom City. Texos 76117
Office 817-159-9999. Fox 817-759-1888