DR9001-CS 890612JLJNE 12~ 1~8~)
GiNN~
17105 PRESTON ~OAD
SUITE 100, LB-Il8
DALLAS, TX 752~8
A1
· JOHN C. KARLSRUHER, P.E.
DENTON TAP ROAD IMPROVEMP~N~S FROM SANDY LAKE TO DENTON CREEK
EX lHA WORK -' DHAINAL~E (IN HINCI<LEY PROPEHIY
DEAR MR. KAI'41.SRUI'~ER~
PER YOUR |:'HONE CONVERSAT10N WI ['H MR. SNYDER TODAY~ L. H. LACY CO. UNDERSTANDS
~l-lE FOLLOWIN[J TO BE '[RUE IN REFERRENCE TO (HE DRAINAGE ASSOCIATED WiTH THE
HINCKLEY PROPERTY:
1}
L. H. LACY WILL LAY APPROX]MArEI. Y 20 LF OF ADDITIONAL 30" RCP ON
D--15A ti'HiS WILL GO BEYOND ]'FIE R.O.W. AND THE CONSTRUCTION EASEMENT).
'tHIS PIPE IS TO BE LAVED PARALLEL TO DIRT ROAD @ STA] 1DR 178+00.
'iHE SLOPE OF: TFIE EXISTING PIPE IS TO BE CARRIED UPSTREAM (THE
APPROXIMATE FLOW-LINE A1 THE END OF TI~E 50" RCP IS TO BE 467.08. ]'HIS
WORK IS TO BE DONE AT A PRICE 13F SIXTY-FIVE DOLLARS ($.55.00) PER LFo
(SEE SPE(:IAL NOI'E)
WE WILL CONSTRUCT AN X.-TYPE DROP INLET AT THE END OF THE 50" RCP (SEE
ITEM 1}. ')-HIS INLET WILL. HAVE A L1P ELEVATION OF 472.00. THIS WORK
IS TO BE PER TF(E DE]AILS ON SHEET 4c/ OF 5~J OF ]'HE PLANS, Al A Cos'r'~
OF: ONE THOUSAND NINE HUNDRED EIGHT DOLLARS ($1c~08.00) PER EA. (FOR
AN APPROXIMATE 4.5' TO 5~ DEEP INL.ET>
3)
]FIE EARTHWORK TO FORCE THE DRAINAGE TO THE INLET iN ITEM 2 IS 70 BE
DONE BY TURNING APPROXIMATELY 50 DEGF~EES SO.UTH OF WES] FROM THE INLET,
GOING OUT ON THAT BEARING APPROXiMA]'ELY 1~0 LF AND SET]ING A NUB ~
ELEVA'IION 475.00 ]U LS~ADE FROM. THIS WORK IS TO BE DONE BY THE HOUI.;[~
OR ON A cosr PLUS BASIS (SEE CONIRACI' SEI£'IION 6, EX'IRA WORK & CLAIhlS~.
PAGE G.-I2). ANY EAI{'FFIWL]RK REQUIRED 'ri.] SFIAPE A BOWL AROUN].) THE DHC)I-~
INLE1 WILL ALSO BE HANDLED IN THiS MANNER. ALL cur MATERIAL IS 'I'D
BE USED~ OR WASYED ON
4)
ANY R1PRAP REQUIRED AF~OUND THE DROP iNLE'r, OR AT THE BACK OF INLET.
D--15 WILL BE DONE-_ A] THE PI.lICE ESTABLISHED IN THE BID FOR TIllS
PROJECT, TWO HUNDRED TWELVE DOLI..~I~S ($212.00) PER CY. THE LIMi'IS TO
BE ES]ABLISHED 1N '(HE FIEL_D IN CO-OPERATION WI[H GINN INC~S FIELD
REPRESENTA'r l VE,
L H, Lacy Company
General Contractors
214/357-0146
"Quality Conslruction for over 65 Yeara"
10888 Shady Trail
P.O. Box 541297
Dallas, Texas 75354-1297
5)
~)
7)
ANY REMEDIAL WORK REQUIRED 'TO PREPARE ]'HE BACK OF INLET D-15 FOR THE
ADDITION OF A CONCREIE R1PRAP F~LUfflE WILL BE DONE ON A COST PLUS SAS1S
(SEE CONTRACT SECTION ~ EXTRA WORK & CLAIMS~ PAGE G-12).
PER PREVIOUS VERBAL. A(31?EEMENT WORK REQUIRED TO BREAK HOLES IN THE BACK
L)l: INLEI D'-15, AND 'lO BUILD AND MAIN]A1N D)KES IN DiE AREA OF 'IHIS
INL. E] 'IL) REI..IEVE IHE I]VERF:LOW PROBLEM ARE TO INCORPORATED IN rills
FIELD CI~ANI3E. IHE WORK IS 'lO BE DONE ON A COST PLUS BASIS
CONIF~ACf SEL;IIf_)N ~ EXII~A WOt~I< & CLAIMS, PAGE
ANY .:;EEl)lNG REQLJlRED TO I]F DONE IN CONJUNCTION WITH THIS FIELD CHANGE
WILL. BE DUNE Al IHE IJlD PR[CE OF FORTY-'IWO CENTS ($0.42) PER SY. THIS
P¢~]CE JS GOOD PROVIDED 1T CAN SE DONE WHEN [HE OTHE~ SEEDING ON THIS
PROJEC'; IS SCHEDULED - IF AN EXlt~A MOVE-IN IS REQU1RED TO DO THE WORK
THE MOVE'-JN WILL BE ADDED A] A COST OF ONE HUNDRED FIFTY DOLLARS
($150.00).
SPECIAL N0';E tO i]EM 1: L. Ft. LACY'S PR]DE OF $65.OO/LF TO INSTALL THE
50" REP IS REFLECTIVE OF HAVING S.¥.B. CO. DO THE WORK AS SOON AS POSSISLE.
IF I~INN, INC. ~I.EC'IS lO WA]'I' UN[IL A ]'IPI~-: SUCH THAT THE NORMAL PIPE
SUB-CONTRACTOR (AMERICAN DEVELOPERS)IS SACK ON ]'HE JOB TO LAY P1PE AT
t';tAIL_ROAD IRACYS, Oi~ BETHEL SCHOOL EAST L...,H. LACY CO. WILL HONOR
ESTABLISHED BiD PlaICE OF I'H]R'I'¥-ONE DOLLARS I$31.00) PER LF,
PLEASE CALL ME IF YOU HAVLi ANY QOESTiONS.
SINCERELY,
'JCOTT BALCH, P.E.
CC: FILE 310 COt'~RESPONDENCE