Alexander Ct-CS071108 ! (~/~32~~1~~n Griffi~~lex~~der~<:;ourt...~.~.~~~.._._."._.~....__~_~~~~~~~._~~~~~~~~~....~_~~""~_.~...""~ Page 1 From: To: Date: Subject: Keith Marvin Griffin, Ken 11/8/200711:17 AM Alexander Court Status as of this morning: Rough grading has been completed. Material was stockpiled on the south side of the road until the Floodplain permit was issued. Material was then moved to the north side of the road and used as fill. Densities were taken as fill was placed and compacted. Sewer: Materials were delivered on 10/17/07 and subsequently rejected for nonconformance. New material was delivered on 10/23/07 and work began on installation. Main, manholes, and 80% of services have been installed. Density testing has been performed on trenches, however final testing and video of mains have not been done yet. Storm Drain: Materials were delivered on 11/06/07. Installation began this morning. Water: No materials have been delivered yet. No schedule has been provided. Street: Street grade has been rough cut and verified. No paving contractor information or submittals have been provided. Items left for completion and final acceptance: Complete sewer services and test sewer Complete storm drain and inlets Begin water installation (main, services, meters, boxes and testing) Cut street to final grade, stabilize, place concrete (machine place, hand pours, and stamped concrete) Top out inlets backfill parkway adjust services construct retaining walls (need submittals) Construct screening walls Sidewalk & ADA ramps Final grading and post construction erosion control Final walk through and punch list In speaking with Larry we arrived at an approximate estimated completion date of February or March 2008. Keith Marvin, P.E. Project Engineer (972) 304-3681