DR9001-CS 880429ITEMIZED I~N1T PRICE BID FORM
Buckelew Construction Co., Inc.
~d From:
~ackelew Construction Co., Inc.
Connell Skagg~ Addition
Connell Development Company
April 9.9, 1988
Itemized Bid Proposal
Page 1 of 3
BOX CULVERT AND STORM DRAINAGE IMPROVEMENTS
Item No.
1
1232
Unit Description & Unit Price in Words
LF
2 1 LS
Unit Price
In Figures Amount
10'xS' Single Box Culvert
(Cast-in-Place or Preeast),
including, removal and replacemnt
of fences, clearing, removal of
required trees, excavation, backfill,
grading as indicated, compacted
stone base, connection to existing
box culvert (including removal and
off-site disposal of headwall and
slope protection if required), construc-
tion of 4-14' modified curb inlets
and final clean-up.
The following items are to be included
in the linear foot price for the box
culvert; construction of a drop inlet,
installation of 35 L.F. of 30-inch
reinforced concrete pipe - Class III,
including horizontal bends, connections
to existing R.C.P.'s and the box culvert,
excavation, embedment, backfill and
final clean-up.
~-wm h,,ndrmd Fi fry dollars
and no cents
per linear foot, complete in place.
25.090, 3o8, .opo.oo
Transition at upstream end of box culvert
including gabion baskets and reck, Type "A"
headwall, metal beam guard fence, terminal
sections and posts, removal of required trees,
removal and replacement of fences, excavation,
backfill, and final clean-up.
fl ftmmn thousand dollars
and no cents
lump sum, complete in plaae.
$15~OOD.(~
15~ODO.O0
3354b/0127
Connell Skaggs Addition
Cormell Development Company
April 9.9, 1988
Itemized Bid Proposal
Page 9. of 3
BOX CULVERT AND STORM DRAINAGE IMPROVEMENTS
Item No.
3
Qty
123~
Unit Description & Unit Price in Words
LF
Unit Price
In Figures Amount
Trench Safety Program,~l~Ag,~
nineteen dollars
and .. no cents
per linear foot, complete in place.
$ 1~00 $ 23,408.00
TOTAL BOX CULVERT AND STORM DRAINAGE
IMPROVEMENTS $ 346 ~4Q8.00
3354b/0127