Loading...
DR9001-CS 880429ITEMIZED I~N1T PRICE BID FORM Buckelew Construction Co., Inc. ~d From: ~ackelew Construction Co., Inc. Connell Skagg~ Addition Connell Development Company April 9.9, 1988 Itemized Bid Proposal Page 1 of 3 BOX CULVERT AND STORM DRAINAGE IMPROVEMENTS Item No. 1 1232 Unit Description & Unit Price in Words LF 2 1 LS Unit Price In Figures Amount 10'xS' Single Box Culvert (Cast-in-Place or Preeast), including, removal and replacemnt of fences, clearing, removal of required trees, excavation, backfill, grading as indicated, compacted stone base, connection to existing box culvert (including removal and off-site disposal of headwall and slope protection if required), construc- tion of 4-14' modified curb inlets and final clean-up. The following items are to be included in the linear foot price for the box culvert; construction of a drop inlet, installation of 35 L.F. of 30-inch reinforced concrete pipe - Class III, including horizontal bends, connections to existing R.C.P.'s and the box culvert, excavation, embedment, backfill and final clean-up. ~-wm h,,ndrmd Fi fry dollars and no cents per linear foot, complete in place. 25.090, 3o8, .opo.oo Transition at upstream end of box culvert including gabion baskets and reck, Type "A" headwall, metal beam guard fence, terminal sections and posts, removal of required trees, removal and replacement of fences, excavation, backfill, and final clean-up. fl ftmmn thousand dollars and no cents lump sum, complete in plaae. $15~OOD.(~ 15~ODO.O0 3354b/0127 Connell Skaggs Addition Cormell Development Company April 9.9, 1988 Itemized Bid Proposal Page 9. of 3 BOX CULVERT AND STORM DRAINAGE IMPROVEMENTS Item No. 3 Qty 123~ Unit Description & Unit Price in Words LF Unit Price In Figures Amount Trench Safety Program,~l~Ag,~ nineteen dollars and .. no cents per linear foot, complete in place. $ 1~00 $ 23,408.00 TOTAL BOX CULVERT AND STORM DRAINAGE IMPROVEMENTS $ 346 ~4Q8.00 3354b/0127