Loading...
Alexander Ct-LR080108 I~A TESTING,INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 DAILY FIELD REPORT TESTED FOR: Mira Mar Development Corporation Colleyville. Texas Alexander Court . /' Cappell, Texas V DATE: 01/08/08 PROJECT: OUR REPORT NO.: 070021-30 TECHNICIAN: T.L. WEATHER: Sunny and Clear TEMPERATURE RANGE: Low 70's THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED SITE TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. UPON ARRIVAL AT THE SITE, THE TECHNICIAN WAS INFORMED THAT PREVIOUSLY SCHEDULED PROCTOR PICKUP WOULD NOT BE REQUIRED FOR 01/08/08 DUE TO CONFUSION BETWEEN THE DEVELOPER AND THE CONTRACTOR. THE TECHNICIAN RETURNED TO THE DA - (tl~ Respectfully Submitted, ~#l-- Tom Ellis ALPHA TESTING, INC. Our test results and reports are for the exclUSive use of the Client (and their designated recipients on file In our office) and shall not be reproduced and/or distributed except with express approval of Alpha. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed. and are not indicative of the qualities of apparenlly identical or similar specimens Geotechnical Engineering fiJ Construction Materials Testing fb Environmental Engineering fb Consulting