Loading...
Chicken Express-CS080118 THE.CITY.OF corrELL January 18, 2008 Marc O. Bentley, P.E. Bentley Engineering, Inc. 4125 Broadway Blvd. Suite A250 Garland, Texas 75043 RE: Chicken Express Construction Plan Review Comments The City ofCoppell has reviewed the referenced plans and has the following comments to offer: Drainae:e Area Map 1. Discharge in drainage area E should be collected on site. Pavine: Plan 2. If there will be no installation of a lime subgrade beneath the paving an additional}" of concrete must be added, a written request for a waiver and a geotechnical report must be submitted to the City. Utility Plan 3. The general notes appear to be inaccurate, please refer the City of Coppell Subdivision Ordinance and Standard Details. 4. A double check valve should be installed on the irrigation service line and domestic service line. 5. An additional cleanout should be installed at the bend in the sewer line nearest to Denton Tap. 6. Provide detail of storm drain connection in Belt Line Rd. and provide the traffic control plan for this work. Erosion Control 7. Although the surrounding property elevations are shown to be higher, it is recommended that a silt fence be installed around entire project site for preventative measures. There may be additional comments throughout the plans that need attention as well. Please make the necessary changes and submit these marked-up plans and two sets of revised plans to the City for review. If you have any questions, please contact me at your convenience. s~ Mi~I-(Ja;=Za, E.I.T Graduate Engineer Office Phone: (972) 304-3679 Fax: (972) 304-3570 E-mail mgarza@ci.coppell.tx.us 255 PARKWAY * P.O BOX 9478 * COPPELL TX 75019 * TEl_ 972/462 0022 * FAX 972/304 3673