Loading...
Kimbel 7&8-CS080117 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT Case No.: PD-223R-C, Chase Bank (Kimbel Addition} ~ R P&Z HEARING DATE: C.C. HEARING DATE: January 17,2008 February 12, 2008 STAFF REP: Marcie Diamond, Assistant Director of Planning LOCATION: SEC of MacArthur Boulevard and Village Parkway SIZE OF AREA: .70 acres of property CURRENT ZONING: PD-223-C (Planned Development-223-Commercial) REQUEST: A zoning change request to PD-223R-C (Planned Development- 223 Revised-Commercial) to attach a Detail Site Plan to allow the development of a 3,848-square-foot bank with four drive-thru lanes. APPLICANT: Mathew Cragun O'Donnell Engineering 1601 E. Lamar Blvd, Suite 210 Arlington, Texas 76011 817.794.0202 FAX 817.548.8430 HISTORY: In November 1994, Council approved $-1085 allowing the expansion of Gloria's Pizza, whose initial restaurant pre-dated the requirement for an SUP. This restaurant has since relocated to another retail center in Coppell, thus allowing for the partial demolition of this retail building. $-1114 for Papa John's, which abuts this proposed bank site to the south, was approved in December 1996. ITEM # 9 PAGElof5 On May 22,2007, City Council overruled the recommendations of the staff and Planning and Zoning Commission and approved Planned Development 223-Commercial to allow the construction of two retail/medical buildings, a bank, the retention of an existing take-out restaurant (S-1114-C, Papa John's) and a portion of an existing retail structure, totaling 25,263 square feet, further permitting a reduction in landscaped areas, required setbacks, alternative signage colors, sizes and locations and other deviations from the requirements of the Zoning Ordinance, on 2.9 acres of property located at the northeast corner of Sandy Lake Road and MacArthur Boulevard. The subject tract is Lot 8R of this PO, which established a site plan for a 4,200-square-foot bank with five drive-thru lanes. This approval allowed a reduction in both front and rear yard setbacks; parking spaces depth reduced to 16.5 feet, where 17 feet is the minimum, severe deficiencies in landscaping, and two monument signs. The drive-thru facilities were sited adjacent and parallel to MacArthur Boulevard. As recommended when this PO was being considered, drive-thru facilities should be sited so that visibility is obscured from Primary Image Zones (MacArthur Boulevard). However, the approval of this PO specifically included that the approval of the Detail Site Plan for this bank only needed to include the elevations and signage. TRANSPORTATION: MacArthur Boulevard is a six-lane divided thoroughfare, which is built to standard. SURROUNDING LAND USE & ZONING: North - Lakeside Elementary School; MF-2 (Multifamily-2) South- Papa John's; PD-223-C (PO-Commercial) East - Vacant land; C (Commercial) West - Kroger; C (Commercial) COMPREHENSIVE PLAN: The Coppell Comprehensive Master Plan shows the property as suitable for Neighborhood Retail uses. DISCUSSION: As detailed above, this property was zoned a Planned Development district in the spring of last year which allowed significant variances to zoning regulations including setbacks, landscaping and signage. Per a condition of this PO, this Detail Plan approval is to be essentially limited to elevations and signage. However, this detail plan differs from what was previously approved and therefore the details of the site plan ITEM # 9 PAGE2of5 warrant additional consideration. The building size has been reduced from 4,200 to 3,849 square feet, the drive-through lanes have been reduced from five to four, and parking spaces have been increased from 25 to 28. With these revisions, the site plan is still non-compliant with the "C" District-Based zoning regulations, and the requirements of the Landscape Ordinance. It is however, compliant with the setback provisions of PD-233, but it appears to be more deficient in the amount of landscaping than permitted by the PD. The analysis of this suspected shortage is severely hampered due to the inconstancies in the Landscape Plan submitted, including: · The Landscape Plan contains totally different quantities and type of plant materials than indicated the Plant Table o Plant Table indicates 57 trees (Mexican Plum and Lacebark Elms) being provided. o None of these types of trees are shown on the plan, and the quantity of trees is significantly less. · Landscape Calculations table does not reflect either the amount of landscaped areas or plant materials indicated on the Plan or in the Plant Table. · The Landscape Plan does not include any site information. It appears that what is being requested is actually a decrease in the amount of landscaping to be provided (increasing the deficiencies) as permitted in PD-223; however this analysis can not be performed with the document as presented. THEREFORE STAFF IS RECOMMENDING THAT THIS CASE BE HELD UNDER ADVISEMENT FOR 30 DAYS TO ALLOW TIME FOR THE APPLICANT TO CORRECT THE LANDSCAPE PLAN. While correcting the Landscape Plan, staff further recommends that the applicant review and address all technical DRC Comments and the following site related issues. Parking required for this use, per the zoning regulations, is 20 spaces. The previous plan was approved with 25 parking spaces. An additional parking space was added along the southern side of the building and re-oriented to be 90 degree YS. angled parking. The dumpster was deleted at the northeast corner of the property, adjacent to Village Parkway, and replaced by two parking spaces. These two spaces pose a potential dangerous conflicting traffic pattern due to the proximity of the cars backing out into the driveway serving Village Parkway. It is recommended that if a dumpster is not needed for this bank use, then this area should be devoted to landscaping to address some of the landscape deficiencies. ITEM # 9 PAGE 3 of 5 Historically, drive-thru facilities have been oriented to not front on streets designated as Primary Image Zones. Recently, a similar issue arose on a proposed bank to be located at Denton Tap Road and SH 121. To address this adjacency issue, additional landscaping was added on two sides of the drive-through to obscure the view from the public right-of-way. However, the current site was "pre-approved" per PD-223-C, with a 6-foot wide perimeter landscape buffer, where normally 15 feet would be required. There is little opportunity to add a significant amount of landscaping in this area, unless the parking is reduced. The elimination of the six parking spaces at the corner of MacArthur Blvd. and Village Parkway, plus the two spaces in the former location of the dumpster, will provide a more significant buffer between this use and the elementary school and residential uses to the north while still meeting the parking required by the Zoning Ordinance (20 parking spaces). These spaces are also located furthest from the front door, and would be, potentially, the least utilized. In accordance with the approved PD conditions, masonry proposed for the building is the same color and material as the CVS Drug Store being constructed at the northeast corner of MacArthur and Sandy Lake. Red brick with cast stone accents. The attached signage will be individually mounted, white channel letters with the Chase Bank logo. The applicant is requesting that the size of the logo exceed the 20% permitted by 3% on all three attached signs. Staff recommends that the attached signs comply with the provisions of the Sign Ordinance. Variances to this aspect of the Sign Ordinance were not established by this PD. PD-223-C also allowed for two 40 square foot monument signs on this property, where only one would normally be permitted. The sign at the corner of MacArthur and Village Parkway will advertise the bank. The sign at the southern driveway will be a multi-tenant sign for the entire center where all the name plates will be the same color and font. RECCOMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff is recommending PD-223R-C, Chase Bank (Kimbel Addition) be HELD UNDER ADVISEMENT, until the February 21, 2008 Planning and Zoning Commission meeting, to allow the applicant to address the following concerns: 1. Rectify all inconstancies in the Landscape Plan to allow for analysis for compliance with PD-223-C regulations. 2. Eliminate six parking spaces at the corner of MacArthur Blvd. and Village Parkway, plus the two spaces in the former location of the dumpster and replace with landscaping. ITEM # 9 PAGE 4 of 5 3. Revise the attached signage to comply with the maximum 20% logo regulation. 4. Specify the material and color proposed for the face of the monument signs. 5. Relocate the FDC to the west side of the fire lane next to the proposed fire hydrant. Engineering Comments: 1. If lime stabilization is not going to be used for the paving, a waiver request must be submitted by the engineer along with the geotechnical report and the thickness of concrete increased by 1 ". 2. The retaining wall is in conflict with the sanitary sewer on the east side of the project. The engineered retaining wall design will need to be submitted to Engineering Department during the plan review process. 3. It appears that a full set of construction plans was submitted with the DRC information. These plans should not be considered submission for engineering approval. Plans for review should not be submitted until approval from Planning and/or City Council is granted. ALTERNATIVES: l} Recommend approval of the request 2} Recommend disapproval of the request 3} Recommend modification of the request 4} Take under advisement for reconsideration at a later date. ATTACHMENTS: 1} Site Plan 2} Landscape Plan 3} Elevations ITEM # 9 PAGE 5 of 5