SC-Pinkerton E1-CS080122
THE.CITY.OF
corrELL
January 22, 2008
Mike Glenn, P.E
Glenn Engineering
105 Decker Ct. Suite 910
Irving, TX 75062
RE: Pinkerton Elementary Parking Expansion
Construction Plan Review Comments
The City of Coppell has reviewed the revised plans for the referenced addition and they have
been approved.
The City of Coppell requires three sets of final construction plans for its use; your office should
submit as many additional sets for stamping as is necessary for construction operations. All
contractors and subcontractors onsite must have a copy of the plans approved by the City of
Coppell along with a copy of the City's standard construction details.
All fees must be paid prior to release of this project for construction. The City charges a 2%
inspection fee for all private construction outside the building's footprint. This includes dirt
work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all
installations in the public right-of-way or easement, the City charges a 4% fee. A check for
inspection fees made to the City of Coppell should be submitted to this office along with the
Construction Development Permit Application and a copy of the Construction Site Notice. For
your convenience a spreadsheet is attached to the permit application for use in calculating the
inspection fees. A copy of the contract(s) should be attached for verification purposes. If you
have any questions, please contact me at your convenience.
Sincerely,
--..~
/ .
"'-. -....-...-----
Michael Garza, E.LT.
Graduate Engineer
Office Phone: (972) 304-7019
Fax: (972) 304-3570
E-mail: mgarza@ci.coppell.tx.us
255 PARKWAY * P,Q BOX 9478 * COPPELL TX 75019 * TEL 972/4f'i2 0022 * FAX 972/3043673