Park West CC(15.1)-LR080111
REED EnGinEERinG
GEOTECHNICAL AND G R CI U F'
ENVIRONMENTAL CONSULTANTS
REPORT OF FIELD GRADATION TESTS
BMC West Addition
425 Airline Drive
C Coppell, Texas
REPORTED TO: MC West Corporation ~
425 Airline Drive, Suite 200 ~
Coppell, Texas 75019
ATTN: Mr. Danny McQuary
CONTRACTOR: D/B Constructors, Inc.
Sieve Size
1-3/4"
S
Percent Passin
100
REPORT NO. 15
REPORT DATE: 01-11-08
REG PROJECT NO. 14935
TECHNICIAN: G. Tsougarakis
PAGE: 1 of 1
Percent Passin
60
I 1 Passing I Passing
Date Location 1-3/4" Sieve #4 Sieve
12-08-07 Bldg Pad: G-1.5 100 62
Bldg Pad: F.8-2 100 64
Bldg Pad: D.5-3 100 70
Bldg Pad: B.3-2.5 100 63
Bldg Pad: AA.5-3 100 65
12-10-07 Bldg Pad: F.9-4 100 62
Bldg Pad: C.8-5 100 60
Bldg Pad: B.8-5.5 100 65
Bldg Pad: A.3-5 100 63
Bldg Pad: AA.5-4.5 100 63
Submitted by:
E-Mail
Distribution: (1) BMC West Corporation/
Mr. Danny McQuary
(1) Pross Design Group/
Mr. Charles Miller
(1) D/B Constructors, Inc./
Mr. Michael Smith
(1) BMC West Corporation/
Mr. Mike Maring
(1) Hunt & Joiner/Mr. Steve Dial
REED ENGINEERING GROUP, LTD.
Original Signed By
Bill Woolwine
Sr. Manager, CMT
BW/cn
Mail
Distribution: (1) Icon Consulting Engineers/
Mr. David Gregory
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
HICk
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . FAX [214] 3500019