Loading...
DukeLeslie CE080111 THE.CiTY.OF COPPELL .~~*AI'. e x ~ q ~ s . \ ~ MEMORANDUM TO: Larry Davis, Engineering FROM: Danny Hightower, Public Works DATE: January 11,2008 REF: Point West VII, Lot 2, Block A (Duke-Leslie Addition) 1. Paint vault lids blue 2. Vaults need to be 3" higher than ground grade 3. Paperwork on two DC's in vaults. Meter number, meter reading, and serial number off DC's to Service Center. 4. Check for two DC's paperwork 5. lbird FH from southwest vault needs blue street marker button 6. Need to work three FH valves in north parking lot - covered by cars at the time of inspection. 7. Need extension on FH valve to Building 6, northeast of Building 7 8. Mark FHV in red on curb and paint lid red 9. First MH west of building needs chimney seal 10. Second MH needs chimney seal 11. Third manhole needs chimney seal, rainpan, and grate. Pipe inside MH Call 972-462-5150 to schedule Danny Hightower to check punch list after work is done. TO: FROM: DATE: REF: THE.CITY.OF corrELL 1f~~. e x ~ q t\ Ii . \ I!. MEMORANDUM Larry Davis, Engineering Danny Hightower, Public Works January 11, 2008 Point West VII, Lot 2, Block A (Duke-Leslie Addition) Punch list all ok.