Loading...
Duke Lesley 3C-LR080123 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich,Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 01/23/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Con~truction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7752 Placement Date: 01/15/2008 Weather Conditions: C'~ar Time Sampled: 04:30am Temperature - Air: 340F Truck No: 117 Air Content: 4.8% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 04:13am Concrete: 500F Ticket No: 10097 Unit Weight (pct): NA Measured Slump (inches) 4.0 Sample Location: 30' west from northeast corner of building 1 - sample taken from truck REPORT OF TESTS Cylinder Marked Date Age Set No. Tested (days) 1 1 01/22/2008 7 1 2 02/12/2008 28 1 3 02/12/2008 28 4 03/11/2008 56 Diameter (in) 6.00 0EJ ~~ mJ E;J DO D Type 1 Type 2 Type 3 Type 4 Type 5 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 122,240 Compressive Strength (psi) 4,320 Fracture Type Type2 Area (in') 28.27 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, LId. (CH/KW) Page 1 of 20 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, 8te 600, Houston, TX 77040 4421 Freidrich, 8te 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 01/23/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.L.: 7752 Placement Date: 01/15/2008 Weather Conditions: Clear Time Sampled: 05:40am Temperature - Air: 350F Truck No: 109 Air Content: 5.1 % Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 05:30am Concrete: 520F Ticket No: 10108 Unit Weight (pet): NA Measured Slump (inches) 4.0 Sample Location: 20' north from northeast comer of building 1 - sample taken from truck REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 2 1 01/22/2008 7 6.00 28.27 123,430 4,370 Type2 2 2 02/12/2008 28 2 3 02/12/2008 28 2 4 03/11/2008 56 ~~ ~[g [ill] tJ DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 3 of 20 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 01/23/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7752 Placement Date: 01/15/2008 Weather Conditions: Clear Time Sampled: 06:38am Temperature - Air: 390F Truck No: 140 ~rCo~ent 4.4% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 06: 10am Concrete: 540F Ticket No: 10115 Unit Weight (pet): NA Measured Slump (inches) 4.0 Sample Location: 90' east from northeast corner of building 1 - sample taken from pump REPORT OF TESTS Cylinder Marked Date Set No. Tested 3 1 01/22/2008 3 2 02/12/2008 3 3 02/12/2008 3 4 03/11/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 ~E3 ~l9 fillj [;] DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 112,450 Compressive Strength (psi) 3,980 Fracture Type Type6 Area (in') 28.27 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 5 of 20 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 01/23/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7752 Placement Date: 01/15/2008 Weather Conditions: Sunny Time Sampled: 08:21am Temperature - Air: 350F Truck No: 130 Air Content: 4.3% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 07:52am Concrete: 530F Ticket No: 10126 Unit Weight (pct): NA Measured Slump (inches) 4.5 Sample Location: 24' east from southeast corner of building 1 - sample taken from pump REPORT OF TESTS Cylinder Marked Date Set No. Tested 4 1 01/22/2008 4 2 02/12/2008 4 3 02/12/2008 4 4 03/11/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 [8Ej ~[g ffi] t] DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 111,410 Compressive Strength (psi) 3,940 Fracture Type Type5 Area (in') 28.27 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 7 of 20 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 01/23/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Conshuction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7752 Placement Date: 01/15/2008 Weather Conditions: Su: ny Time Sampled: 10:15am Temperature - Air: 500F Truck No: 117 Air Content: 4.5% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 09:53am Concrete: 580F Ticket No: 10144 Unit Weight (pcf): NA Measured Slump (inches) 4.5 Sample Location: 90' south from southeast corner of building 1 (center) - sample taken from pump REPORT OF TESTS Cylinder Marked Date Set No. Tested 5 1 01/22/2008 5 2 02/12/2008 5 3 02/12/2008 5 4 03/11/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 latj ~[g fm t] DO D Type 1 Type 2 Type 3 Type 4 Type 5 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 120,700 Compressive Strength (psi) 4,270 Fracture Type Type3 Area (in') 28.27 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 9 of 20 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 01/23/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.u.: 7752 Placement Date: 01/15/2008 \l'feather Conditions: Sunny 1 ime Sampled: 10:41am Temperature - Air: 610F Truck No: 101 Air Content: 4.2% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 10:16am Concrete: 570F Ticket No: 10149 Unit Weight (pct): NA Measured Slump (i.,ches) 4.5 Sample Location: 180' south from southeast corner of building 1 - sample taken from pump REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 6 1 01/22/2008 7 6.00 28.27 99,740 3,530 Type2 6 2 02/12/2008 28 6 3 02/12/2008 28 6 4 03/11/2008 56 ~r~H~~~ ~ t] DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 11 of 20 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, 8te 600, Houston, TX 77040 4421 Freidrich, 8te 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 01/23/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perfonn required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Req uirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7752 Placement Date: 01/15/2008 Weather Conditions: Sunny Time Sampled: 12:30pm Temperature - Air: 600F Truck No: 117 Air Content: 4.7% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 12:00pm Concrete: 640F Ticket No: 10162 Unit Weight (pet): NA Measured Slump (inches) 4.0 Sample Location: 270' south from southeast corner of building 1 - sample taken from pump REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 7 1 01/22/2008 7 6.00 28.27 150,260 5,310 Type2 7 2 02/12/2008 28 7 3 02/12/2008 28 7 4 03/11/2008 56 ~E3 ~~ fiG] E] DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 13 of 20 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 01/23/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7n2 Placement Date: 01/15/2008 Weather Conditions: Sunny Time Sampled: 01 :30pm Temperature - Air: 620F Truck No: 109 Air Content: 4.3% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 01 :08pm Concrete: 580F Ticket No: 10173 Unit Weight (pet): NA Measured Slump (inches) 4.5 Sample Location: 360' south from southeast corner of building 1 - sample taken from pump REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 8 1 01/22/2008 7 6.00 28.27 127,460 4,510 Type6 8 2 02/12/2008 28 8 3 02/12/2008 28 8 4 03/11/2008 56 ~E3 ~[Q fill] ~ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 15 of 20 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 01/23/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7752 Placement Date: 01/15/2008 Weather Conditions: Sunny Time Sampled: 02:10pm Temperature - Air: 650F Truck No: 109 Air Content: 4.6% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 01 :41 pm Concrete: 610F Ticket No: 10179 Unit Weight (pet): NA M .!asured Slump (inches) 4.5 Sample Location: 392' south from southeast corner of building 1 (center) - sample taken from truck REPORT OF TESTS Cylinder Marked Date Set No. Tested 9 1 01/22/2008 9 2 02/12/2008 9 3 02/12/2008 9 4 03/11/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 ~l3 [!][g ~ ~ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 88,410 Compressive Strength (psi) 3,130 Fracture Type Type6 Area (in') 28.27 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 17 of 20 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 01/23/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7752 Placement Date: 01/15/2008 '[feather Conditions: Sunny lime Sampled: 03:10pm Temperature - Air: 650F Truck No: 117 Air Content: 4.7% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 01:59pm Concrete: 630F Ticket No: 18569 Unit Weight (pet): NA Measured Slump (inches) 4.0 Sample Location: 482' south from southeast corner of building 1 - sample taken from truck REPORT OF TESTS Cylinder Marked Date Age Diameter Area Set No. Tested (days) (in) (in") 10 1 01/22/2008 7 6.00 28.27 10 2 02/12/2008 28 10 3 02/12/2008 28 10 4 03/11/2008 56 ~E3 [@]~ fill] EJ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 84,790 Compressive Strength (psi) 3,000 Fracture Type Type6 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 19 of 20