Loading...
Duke Lesley 3C-LR080107 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 304806 Project No.: 0711530 Date of Service: 11/08/2007 Report Date: 01/07/2008 Project: Servic Point West Office I ./ :~btain samples of fresh con Ie at the placement locations, perform required testing, cast compressive strength samples and bring lsamples back to the labor ry for curing and testing in accordance with applicable standards. II Contrac 0 'e Construction, LP Concret Supplier: TXI Plant: 141 Specification Requirements Strength: 3,500 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 88274 Placement Date: 11/08/2007 Weather Conditions: Sunny Time Sampled: 09:00am Temperature - Air: 510F Truck No: 1066 Air Content: 4.6% Overall Placement Location: Paving, sidewalk, building 1 Batch time: 08:31am Concrete: 730F Ticket No: 569396 Unit Weight (pet): NA Measured Slump (inches) 5.0 Sample Location: 120 yards west from building 1 intersection REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 11/15/2007 7 6.00 28.27 128,720 4,550 Cone/Split 1 2 12/06/2007 28 6.00 138,430 4,900 Cone/Split 1 3 12/06/2007 28 6.00 139,800 4,940 Cone/Split Average 4,920 1 4 01/03/2008 56 6.00 159,710 5,650 Shear Technician: David Best Report Distribution: Started: 08:30am (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc Potter Concrete Alln: Mr Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Alln: Mr. Larry Davis ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 307471 Project No.: 0711530 Date of Service: 12/06/2007 Report Date: 01/07/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT OAT A Contractor: Duke Construction, LP Concrete Supplier: Redi-Mix Plant: NA Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: NA Placement Date: 12/06/2007 Weather Conditions: Clear Time Sampled: 08:30am Temperature - Air: 450F Truck No: NA Air Content: 5.2% Overall Placement Location: Paving, north and south approach and east approach on Dividend Drive Measured Slump (inches) 5.75 Batch time: Concrete: 660F Ticket No: NA Unit Weight (pet): NA Sample Location: South approach on Beltline REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 12/13/2007 7 6.00 28.27 107,380 3,800 Type2 1 2 01/03/2008 28 6.00 28.27 137,590 4,870 Type3 1 3 01/03/2008 28 6.00 28.27 138,260 4,890 Type2 Average 4,880 1 4 01/31/2008 56 Technician: Jose Villanueva Started: 07:15am Report Distribution: Orig: Duke Construction, lP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr Ryan Skelly 1-ec Duke Construction, lP Attn: Mr. Jason Sulzener 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis ~Cj ~Q] fIIj u DO D Type 1 Type 2 Type 3 Type 4 Type 5 Remarks: Water added at site: 5 gallons Type 6 Finished: 10:00am Rone Engineering P-~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW) Page 1 of 1