Report of Concrete Compressive Strength Test
Report No.: 295677
Project No.: 0612510
Date of Service: 08/15/2007
Report Date: 09/1412007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: 5194
Placement Date: 08/15/2007
Weather Conditions: Clear
Time Sampled: 08:00am
Temperature - Air: 840F
Truck No: NA
Air Content: 4.7%
Overall Placement Location:
Paving, Dividend St., westbound lane, Station 18+00 to 49+00
Measured
Slump
(inches)
1.5
Batch time: 07:55am
CC'1crete: 810F
Ticket No: NA
Unit Weight (pct): NA
Sample Location:
Dividend St., station 23+50
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (In2) (Ibs) (psi) Type
1 1 08/18/2007 3 6.00 28.27 74,550 2,640 Unbonded Cap
1 2 08/22/2007 7 6.00 28.27 79,490 2,810 Unbonded Cap
1 3 09/12/2007 28 6.00 28.27 96,660 3,420 Cone/Split
1 4 09/1212007 28 6.00 28.27 107,740 3,810 Cone/Split
Average 3,610
UMIT ATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except In full without the written approval of Rone Engineering Services, Ltd.
(KW/JB) Page 1 of 10
Rone Engineering
,.
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295677
Project No.: 0612510
Date of Service: 08/15/2007
Report Date: 09/14/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
. Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 5194
Placement Date: 08/15/2007
Weather Conditions: Clear
Time Sampled: 08:50am
Temperature - Air: 890F
Truck No: NA
Air Content: 4.3%
Overall Placement Location:
Paving, Dividend St., westbound lane, Station 18+00 to 49+00
Measured
Slump
(inches)
1.0
Batch time: 08:45am
Concrete: 900F
Ticket No: NA
Unit Weight (pet): NA
Sample Location:
Dividend Street, station 25+00
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (In2) (Ibs) (psi) Type
2 1 08/18/2007 3 6.00 28.27 73,040 2,580 Un bonded Cap
2 2 08/22/2007 7 6.00 28.27 88,920 3,140 Unbonded Cap
2 3 09/12/2007 28 6.00 28.27 99,090 3,500 Cone/Split
2 4 09/12/2007 28 6.00 28.27 104,880 3,710 Shear
Average 3,610
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation In quality
{composition, appearance, etc.} or any other feature of similar subject matter provided by persons or conclitlons over which we have no control. Our letters and reports are
for the exclusive use of the dlents to whom they are addressed and shall not be reproduced except In full without the wrltten approval of Rone Engineering Services, Ltd.
{KW/JB} Page 2 of 10
Rone Engineering
"
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 AmbassadorRow,Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630.9745
Report of Concrete Compressive Strength Test
Report No.: 295677
Project No.: 0612510
Date of Service: 08/15/2007
Report Date: 09/14/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 5194
Placement Date: 08/15/2007
Weather Conditions: Clear
Time Sampled: 09: 15am
Temperature - Air: 910F
Truck No: NA
Air Content: 5.1 %
Overall Placement Location:
Paving, Dividend St, westbound lane, Station 18+00 to 49+00
Measured
Slump
(inches)
1.5
Batch time: 09: 10am
Concrete: 930F
Ticket No: NA
Unit Weight (pcf): NA
Sample Location:
Dividend St., Station 26+25
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (In) (In') (Ibs) (psi) Type
3 1 08/18/2007 3 6.00 28.27 70,250 2,480 Unbonded Cap
3 2 08/22/2007 7 6.00 28.27 77,110 2,730 Unbonded Cap
3 3 09/12/2007 28 6.00 28.27 106,810 3,780 Cone/Split
3 4 09/12/2007 28 6.00 28.27 94,720 3,350 Cone/Shear
Average 3,560 ·
* Does not comply with specified strength
LIMITATIONS: The test results presented herein were prepared based upon the specifiC samples provided for testing. We essume no responsibility for variation in quality
(composlllon, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our lelters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except In full without the written approval of Rone Engineering Services, Ltd.
(KW/JB) Page 3 of 10
Rone Engineering
Ii
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 76247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295677
Project No.: 0612510
Date of Service: 08/15/2007
Report Date: 09/14/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 5194
Placement Date: 08/15/2007
Weather Conditions: Clear
Time Sampled: 10:25am
Temperature - Air: 940F
Truck No: NA
Air Content: 5.2%
Overall Placement Location:
Paving, Dividend St., westbound lane, Station 18+00 to 49+00
Measured
Slump
(inches)
1.25
Batch time: 10:20am
Concrete: 950F
Ticket No: NA
Unit Weight (pcf): NA
Sample Location:
Dividend St., Station 29+25
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
4 1 08/18/2007 3 6.00 28.27 75,490 2,670 Unbonded Cap
4 2 08/22/2007 7 6.00 28.27 75,820 2,680 Unbonded Cap
4 3 09/12/2007 28 6.00 28.27 103,970 3,680 Cone/Split
4 4 09/12/2007 28 6.00 28.27 104,360 3,690 Shear
Average 3,680
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fuil without the written approval of Rone Engineering Services, Ltd.
(KW/JB) Page 4 of 10
Rone Engineering
.
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630.9745
Report of Concrete Compressive Strength Test
Report No.: 295677
Project No.: 0612510
Date of Service: 08/15/2007
Report Date: 09/14/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 5194
Placement Date: 08/15/2007
Weather Conditions: Clear
Time Sampled: 11:15am
Temperature - Air: 960F
Truck No: NA
Air Content: 5.4%
Overall Placement Location:
Paving, Dividend St., westbound lane, Station 18+00 to 49+00
Measured
Slump
(inches)
2.0
Batch time: 11:1 Oam
Concrete: 980F
Ticket No: NA
Unit Weight (pet): NA
Sample Location:
Dividend St., Station 32+00
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (inZ) (Ibs) (psi) Type
5 1 08/18/2007 3 6.00 28.27 71,180 2,520 Unbonded Cap
5 2 08/22/2007 7 6.00 28.27 82,990 2,940 Unbonded Cap
5 3 09/12/2007 28 6.00 28.27 93,420 3,300 Cone/Split
5 4 09/12/2007 28 6.00 28.27 100,010 3,540 Shear
Average 3,420 *
* Does not comply with specified strength
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation In quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except In full without the written approval of Rone Engineering Services, LId.
(KW/JB) Page 5 of 10
Rone Engineering
1II
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, AusUn, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295677
Project No.: 0612510
Date of Service: 08/15/2007
Report Date: 09/14/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 5194
Placement Date: 08/15/2007
Weather Conditions: Clear
Time Sampled: 12:15pm
Temperature - Air: 970F
Truck No: NA
Air Content: 4.8%
Overall Placement Location:
Paving, Dividend St., westbound lane, Station 18+00 to 49+00
Measured
Slump
(inches)
1.75
Batch time: 12:10pm
Concrete: 930F
Ticket No: NA
Unit Weight (pcf): NA
Sample Location:
Dividend St., Station 35+00
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
6 1 08/18/2007 3 6.00 28.27 76,400 2,700 Unbonded Cap
6 2 08/22/2007 7 6.00 28.27 87,870 3,110 Unbonded Cap
6 3 09/12/2007 28 6.00 28.27 103,320 3,650 Cone/Split
6 4 09/12/2007 28 6.00 28.27 101,140 3,580 Cone/Split
Average 3,620
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We essume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except In full without the wrillen approval of Rone Engineering Services, LId.
(KW/JB) Page 6 of 10
Rone Engineering
.
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295677
Project No.: 0612510
Date of Service: 08/15/2007
Report Date: 09/14/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 5194
Placement Date: 08/15/2007
Weather Conditions: Clear
Time Sampled: 01 :30pm
Temperature - Air: 1000F
Truck No: NA
Air Content: 4.8%
Overall Placement Location:
Paving, Dividend St., westbound lane, Station 18+00 to 49+00
Measured
Slump
(inches)
1.25
Batch time: 01 :25pm
Concrete: 970F
Ticket No: NA
Unit Weight (pet): NA
Sample Location:
Dividend St., Station 37+00
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (In2) (Ibs) (psi) Type
7 1 08/18/2007 3 6.00 28.27 71,030 2,510 Unbonded Cap
7 2 08/22/2007 7 6.00 28.27 79,690 2,820 U nbonded Cap
7 3 09/12/2007 28 6.00 28.27 85,120 3,010 Cone/Split
7 4 09/12/2007 28 6.00 28.27 102,560 3,630 Cone/Shear
Average 3,320 *
* Does not comply with specified strength
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(oomposition, appearance, etc.) or any other feature of similar subject mailer provided by persons or oonditions over which we have no oontrol. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shali not be reproduced except In full without the written approval of Rone Engineering Services, Ltd.
(KW/JB) Page 7 of 10
Rone Engineering
JiJ
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 76247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295677
Project No.: 0612510
Date of Service: 08/15/2007
Report Date: 09/14/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
StrengU': 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 5194
Placement Date: 08/15/2007
Weather Conditions: Clear
Time Sampled: 03:00pm
Temperature - Air: 101 OF
Truck No: NA
Air Content: 5.3%
Overall Placement Location:
Paving, Dividend St., westbound lane, Station 18+00 to 49+00
Measured
Slump
(inches)
1.5
Batch time: 02:55pm
Concrete: 920F
Ticket No: NA
Unit Weight (pcf): NA
Sample Location:
Dividend St., Station 40+00
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
8 1 08/18/2007 3 6.00 28.27 71,870 2,540 Unbonded Cap
8 2 08/22/2007 7 6.00 28.27 83,310 2,950 Unbonded Cap
8 3 09/1212007 28 6.00 28.27 98,150 3,470 Shear
8 4 09/1212007 28 6.00 28.27 98,010 3,470 Shear
Average 3,470 *
* Does not comply with specified strength
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our lellers and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except In full without the written approval of Rone Engineering Services, Ltd.
(KW/JB) Page 8 of 10
Rone Engineering
.
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W lltUe York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austln, TX 78744
Corporate Phone: (214)630-9745
Report of Concrete Compressive Strength Test
Report No.: 295677
Project No.: 0612510
Date of Service: 08/15/2007
Report Date: 09/14/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
, Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 ps' @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 5194
Placement Date: 08/15/2007
Weather Conditions: Clear
Time Sampled: 03:50pm
Temperature - Air: 990F
Truck No: NA
Air Content: 5.5%
Overall Placement Location:
Paving, Dividend St., westbound lane, Station 18+00 to 49+00
Measured
Slump
(inches)
1.5
Batch time: 03:45pm
Concrete: 920F
Ticket No: NA
Unit Weight (pet): NA
Sample Location:
Dividend St., Station 43+00
REPORT OF TESTS
Concrete Compressive Cylinder S" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in") (Ibs) (psi) Type
9 1 08/18/2007 3 6.00 28.27 56,350 1,990 Unbonded Cap
9 2 08/22/2007 7 6.00 28.27 69,690 2,460 Unbonded Cap
9 3 09/12/2007 48 6.00 28.27 84,930 3,000 Cone/Split
9 4 09/12/2007 28 6.00 28.27 75,260 2,660 Cone/Split
Average 2,830 *
* Does not comply with specified strength
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW(JB) Page 9 of 10
Rone Engineering
III
Client: Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
B90B Ambassador Row, Dallas, TX 75247
7701 W LiWe York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295677
Project No.: 0612510
Date of Service: 08/15/2007
Report Date: 09/14/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I. D.: 5194
Placement Date: 08/1512007
Weather Conditions: Clear
Time Sampled: 04:50pm
Temperature - Air: 980F
Truck No: NA
Air Content: 5.1 %
Overall Placement Location:
Paving, Dividend St., westbound lane, Station 18+00 to 49+00
Measured
Slump
(inches)
1.75
Batch time: 04:45pm
Concrete: 900F
Ticket No: NA
Unit Weight (pet): NA
Sample Location:
Dividend St., Station 47+50
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (inZ) (Ibs) (psi) Type
10 1 08/18/2007 3 6.00 28.27 73,520 2,600 Unbonded Cap
10 2 08/22/2007 7 6.00 28.27 76,740 2,710 Unbonded Cap
10 3 09/12/2007 28 6.00 28.27 102,150 3,610 Shear
10 4 09/12/2007 28 6.00 28.27 98,150 3,470 Shear
Average 3,540 *
* Does not comply with specified strength
Technician: Ryan Rawlinson
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Alex Bennett PE (1-ec copy)
1-ec Lacy Construction Attn: Mr. Kevin Briles
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Started: 07:00am Finished: 06:30pm Rone Engineering
P-~-~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation In quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients \0 whom they are addressed and shall not be reproduced except In full without the written approval of Rone Engineering Services, Ltd.
(KWIJB) Page 10 of 10