Loading...
Duke Lesley-LR080103 Rone En2== Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freldrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Com pressive Strength Test Report No.: 304108 Project No.: 0612510 Date of Service: 11/02/2007 Report Date: 01/03/2008 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: TXI Plant: 141 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 88274 Placement Date: 11/02/2007 Weather Conditions: Cloudy Time Sampled: 11 :30am Temperature - Air: 750F Truck No: 1574 Air Content: 1.5% Overall Placement Location: Point West Boulevard south, approach Beltline Measured Slump (inches) 5.0 Batch time: 10:57am Concrete: 800F Ticket No: 565426 Unit Weight (pet): NA Sample Location: Westbound approach, concrete crosswalk, west boulevard off Beltline REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (inZ) (Ibs) (psi) Type 1 1 11/09/2007 7 6.00 28.27 100,080 3,540 Cone/Split 1 2 11/30/2007 28 6.00 28.27 147,510 t;20 Shear 1 3 11/30/2007 28 6.00 28.27 155,240 5 90 Cone/Shear Average 5,350 1 4 12/28/2007 56 28.27 164,450 5,820 Cone/Split Technician: Raymond Moore Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Alex Bennell PE (1-ec copy) 1-ec Lacy Construction Alln: Mr. Kevin Briles 1-cc City of Coppell Alln: Mr. Lee Stone 1-cc City of Coppell Alln: Mr. Larry Davis ('II J-/ J K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 1 of 1