Duke Lesley 1A-LR080107
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214)630-9745
Report of Concrete Compressive Strength Test
Report No.: 307701
Project No.: 0713408
Date of Service: 12/08/2007
Report Date: 01/07/2008
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength
Set No. Tested (days) (in) (in') (Ibs) (psi)
3 1 12/15/2007 7 6.00 28.27 90,250 3,190
3 2 01/05/2008 28 6.00 28.27 131,080 4,640
3 3 01/05/2008 28 6.00 28.27 136,910 4,840
Average 4,740
3 4 02/02/2008 56
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Req u irements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
~E3 ~Q] 5I] [Sj DO D
Type 1
Type 2 Type 3 Type 4
Type 5
Measured
Slump
(inches)
5.75
Mix Design 1.0.: 7753
Placement Date: 12/08/2007
Weather Conditions: Mostly cloudy
Time Sampled: 05:45am Batch time:
Temperature - Air: 660F Concrete: 710F
Truck No: 130 Ticket No:
Air Content: 4.7% Unit Weight (pet): NA
Overall Placement Location:
Paving - 3rd section at north side of building VI - 60' north start, 120' end, grid line
N8.2-N17.3
Sample Location:
Gridline N14. 7 - 115' north
Fracture
Type
Type3
Type2
Type2
Type 6
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(DMlKW) Page 5 of 11
Rone Eni==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 307701
Project No.: 0713408
Date of Service: 12/08/2007
Report Date: 01/07/2008
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength
Set No. Tested (days) (in) (in2) (Ibs) (psi)
4 1 12/15/2007 7 6.00 28.27 89,290 3,160
4 2 01/05/2008 28 6.00 28.27 124,970 4,420
4 3 01/05/2008 28 6.00 28.27 124,950 4,420
Average 4,420
4 4 02/02/2008 56
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
~E:j ~[g [)IE [SJ DO D
Type 1
Type 2 Type 3 Type 4
Type 5
Measured
Slump
(inches)
5.75
Mix Design I.D.: 7753
Placement Date: 12/08/2007
Weather Conditions: Mostly cloudy
Time Sampled: 08:00am Batch time:
Temperature - Air: 700F Concrete: 740F
Truck No: 136 Ticket No:
Air Content: 5.0% Unit Weight (pct): NA
Overall Placement Location:
Paving - 3rd section at north side of building VI- 60' north start, 120' end, grid line
N8.2-N17.3
Sample Location:
Gridline N12.8 - 70' south
Fracture
Type
Type2
Type2
Type2
Type 6
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(DM/KW) Page 6 of 11
Rone En~~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 307701
Project No.: 0713408
Date of Service: 12/08/2007
Report Date: 01/07/2008
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Batch time:
Concrete: 740F
Ticket No:
Unit Weight (pet): NA
Measured
Slump
(inches)
4.75
Mix Design 1.0.: 7753
Placement Date: 12/08/2007
Weather Conditions: Clear
Time Sampled: 09:15am
Temperature - Air: 690F
Truck No: 131
Air Content: 4.5%
Overall Placement Location:
Paving - 3rd section at north side of building VI- 60' north start, 120' end, grid line
N8.2-N17.3
Sample Location:
Gridline N11.5 - 120' north
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
5 1 12/15/2007 7 6.00 28.27 119,610 4,230 Type2
5 2 01/05/2008 28 6.00 28.27 135,880 4,810 Type2
5 3 01/05/2008 28 6.00 28.27 139,700 4,940 Type2
Average 4,870
5 4 02/02/2008 56
~13 ~[g 5m lSJ DO D
Type 1
Type 2 Type 3 Type 4
Type 5
Type 6
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(DMlKW) Page 7 of 11
Rone Eni~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 307701
Project No.: 0713408
Date of Service: 12/08/2007
Report Date: 01/07/2008
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Measured
Slump
(inches)
6.0
Mix Design I.D.: 7753
Placement Date: 12/08/2007
Weather Conditions: Windy, mostly cloudy
Time Sampled: 10:01am Batch time:
Temperature - Air: 690F Concrete: 740F
Truck No: 126 Ticket No:
Air Content: 4.9% Unit Weight (pet): NA
Overall Placement Location:
Paving - 3rd section at north side of building VI - 60' north start, 120' end, grid line
A/8.2-A/17.3
Sample Location:
Gridline A/10.7 - 85' north
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
6 1 12/15/2007 7 6.00 28.27 93,000 3,290 Type5
6 2 01/05/2008 28 6.00 28.27 119,190 4,220 Type2
6 3 01/05/2008 28 6.00 28.27 126,940 4,490 Type2
Average 4,350
6 4 02/02/2008 56
~t:j [!][g 5IE ~ DO D
Type 1
Type 2 Type 3 Type 4
Type 5
Type 6
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(DMlKW) Page 8 of 11
Rone Eni==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 307701
Project No.: 0713408
Date of Service: 12/08/2007
Report Date: 01/07/2008
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength
Set No. Tested (days) (in) (in') (Ibs) (psi)
7 1 12/15/2007 7 6.00 28.27 110,160 3,900
7 2 01/05/2008 28 6.00 28.27 166,660 5,890
7 3 01/05/2008 28 6.00 28.27 157,320 5,560
Average 5,730
7 4 02/02/2008 56
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
~~ [!][g ~ lSJ DO D
Type 1
Type 2 Type 3 Type 4
Type 5
Measured
Slump
(inches)
5.0
Mix Design 1.0.: 7753
Placement Date: 12/08/2007
Weather Conditions: Windy, mostly cloudy
Time Sampled: 11 :17am Batch time:
Temperature - Air: 790F Concrete: 710F
Truck No: 110 Ticket No:
Air Content: 5.1 % Unit Weight (pet): NA
Overall Placement Location:
Paving - 3rd section at north side of building VI - 60' north start, 120' end, grid line
N8.2-N17.3
Sample Location:
Gridline N9.8 - 95' north
Fracture
Type
Type5
Type2
Type2
Type 6
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(DMlKW) Page 9 of 11
Rone Eni~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 307701
Project No.: 0713408
Date of Service: 12/08/2007
Report Date: 01/07/2008
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Measured
Slump
(inches)
5.5
Mix Design 1.0.: 7753
Placement Date: 12/08/2007
Weather Conditions: Windy, mostly cloudy
Time Sampled: 12:00pm Batch time:
Temperature - Air: 800F Concrete: 720F
Truck No: 144 Ticket No:
Air Content: 4.5% Unit Weight (pcf): NA
Overall Placement Location:
Paving - 3rd section at north side of building VI- 60' north start, 120' end, grid line
Al8.2-Al17.3
Sample Location:
Gridline Al8.4 - 105' south
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
8 1 12/15/2007 7 6.00 28.27 112,100 3,960 Type2
8 2 01/05/2008 28 6.00 28.27 153,310 5,420 Type2
8 3 01/05/2008 28 6.00 28.27 152,280 5,390 Type2
Average 5,400
8 4 02/02/2008 56
0t:J ~0 5IE bJ DO D
Type 1
Type 2 Type 3 Type 4
Type 5
Started: 02:15am Finished: 02:15pm
Technician: Javier Martinez
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Alln: Mr. Emmit Coots (1-ec copy)
1-ec Poller Concrete Alln: Mr Ryan Skelly
1-cc Pacheco Koch Consulting Engineers Alln: Mr. Jack Evans
1-cc City of Coppell Alln: Mr. Larry Davis
1-cc City of Coppell Alln: Mr. Lee Stone
Type 6
Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(DM/KW) Page 11 of 11
Rone En~==
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freldrlch, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 307701
Project No.: 0713408
Date of Service: 12/08/2007
Report Date: 01/07/2008
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength
Set No. Tested (days) (in) (in') (Ibs) (psi)
2 1 12/15/2007 7 6.00 28.27 87,930 3,110
2 2 01/05/2008 28 6.00 28.27 123,040 4,350
2 3 01/05/2008 28 6.00 28.27 126,820 4,490
Average 4,420
2 4 02/02/2008 56
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
~a~: Ons~
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
~~ [9J[g 5J] [SJ DO D
Type 1
Type 2 Type 3 Type 4
Type 5
Measured
Slump
(inches)
6.0
Mix Design I.D.: 7753
Placement Date: 12/08/2007
Weather Conditions: Mostly cloudy
Time Sampled: 04:45am Batch time:
Temperature - Air: 690F Concrete: 700F
Truck No: 101 Ticket No:
Air Content: 5.0% Unit Weight (pcf): NA
Overall Placement Location:
Paving - 3rd section at north side of building VI - 60' north start, 120' end, grid line
N8.2-N17.3
Sample Location:
Gridline N16.3 - 77' north
Fracture
Type
Type2
Type2
Type2
Type 6
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(DMlKW) Page 3 of 11
Rone Eni~
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 307701
Project No.: 0713408
Date of Service: 12/08/2007
Report Date: 01/07/2008
Project: Point West VI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
~a~: Ons~
Specification Requirements
Strength: 4,000 psi @ 28 days
Slump (in.): 4" - 6"
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Measured
Slump
(inches)
5.0
Mix Design I.D.: 7753
Placement Date: 12/08/2007
Weather Conditions: Mostly cloudy
Time Sampled: 03:45am Batch time:
Temperature - Air: 670F Concrete: 730F
Truck No: 126 Ticket No:
Air Content: 4.0% Unit Weight (pet): NA
Overall Placement Location:
Paving - 3rd section at north side of building VI - SO' north start, 120' end, grid line
AJ8.2-AJ17.3
Sample Location:
Gridline A/17.1 - 90' north
REPORT OF TESTS
Concrete Compressive Cylinder S" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 12/15/2007 7 6.00 28.27 109,950 3,890 Type2
1 2 01/05/2008 28 6.00 28.27 143,710 5,080 Type2
1 3 01/05/2008 28 6.00 28.27 148,670 5,260 Type2
Average 5,170
1 4 02/02/2008 56
~E3 ~[g ~ [SJ DO D
Type 1
Type 2 Type 3 Type 4
Type 5
Type 6
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(DM/KW) Page 1 of 11
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, 8te 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 309725
Project No.: 0713408
Date of Service: 01/04/2008
Report Date: 01/07/2008
Project: Point West VI
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locatio ns and Ite m s Inspected:
Paving, south side of building from southeast corner to west, 600' west
Items Inspected: Co nfo rming Non ~ems Inspected: Conforming Non Items Inspected: Conforming Non
Conforming Conforming Conforming
Placing Drawings Bar Length Column Ties Properly
Approved x and Shape x Tied and Spaced NA
BarSize x Pro per Bar Placement x Stirrup Spacing NA
Bar Grade x Properly Tied x Stirrup Type NA
Bars Clean x Dowel Bars in Place x Lapped Splices x
Form Clean x Pro per Bar Supports x Co mer Bars NA
Number of Bars x ProperCover x Mechanical Splices NA
Discrepancies I Comments:
1. Tie down steel at various locations.
2. Missing dowel bars.
3. Add chairs.
The discrepancies noted above were corrected at the time of inspection.
Technician: Jose Villanueva Started: 03:00pm
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Emmit Coots (1-ec copy)
1-cc Duke Construction, LP Attn: Mr. Emmit Coots
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans
Finished: 06:15pm Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMIKW) Page 1 of 1