Loading...
Duke Lesley 1A-LR080114 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 310212 Project No.: 0713408 Date of Service: 01/09/2008 Report Date: 01/14/2008 Project: Point West VI Coppell, Texas Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Paving, fire lane, south side of building, 280' from southwest building corner to 1120' from southwest building comer Item s Inspected: Co nfo rm ing Non Items inspected: Conforming Non Items Inspected: Conforming Non Conforming Conforming Conforming P lacing Drawings Bar Length Column Ties Propeny Approved x and Shape x Tied and Spaced NA Bar Size x P ra per Bar P laeem ent x Stirrup Spacing NA Bar Grade x Pro peny Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Pro per Bar Suppo rts Notel Corner Bars NA Numberof Bars x P roper Cover Note 1 Mechanical Splices NA Discrepancies / Comments: 1. Chairs to be installed during co ncrete p lacem e nt. Technician: Chris Harbour Started: 01 :45pm Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Emmit Coots (1-ec copy) 1-cc Duke Construction, LP Attn: Mr. Emmit Coots 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis 1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans ~ K. Scott Watson, AET Project Manager L1MrrA TIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMIKW) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 n01 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 309761 Project No.: 0713408 Date of Service: 01/05/2008 Report Date: 01/14/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: NA Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 03:38am Concrete: 600F Ticket No: 18039 Unit Weight (pet): NA Measured Slump ( ,nches) 8.0 Mix Design I.D.: 7753PW6 Placement Date: 01/05/2008 Weather Conditions: NA Time Sampled: 04:02am Temperature - Air: 580F Truck No: 101 Air Content: 4.0% Overall Placement Location: Paving, South side of building, southeast comer to west building 600, grid lines 1-13/F-L Cylinder Marked Set No. - - 1 1 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 97,180 Sample Location: Grid lines F-1 REPORT OF TESTS Area (in') 28.27 Type 6 .~ Compressive Strength (psi) 3,440 Fracture Type Type5 Date Tested 01/12/2008 Age (days) 7 Diameter (in) 6.00 1 1 2 3 02/02/2008 02/02/2008 28 28 1 03/01/2008 56 4 ~~ ~Q;] [)IE Q DO D Type 1 Type 2 Type 3 Type 4 Type 5 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar sUbject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 1 of 10 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 309761 Project No.: 0713408 Date of Service: 01/05/2008 Report Date: 01/14/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: NA Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 04:21am Concrete: 580F Ticket No: 18049 Unit Weight (pct): NA Measured Slu'Tlp (incl1es) 6.0 Mix Design I.D.: 7753PW6 Placement Date: 01/05/2008 Weather Conditions: NA Time Sampled: 04:30am Temperature - Air: 600F Truck No: 126 Air Content: 2.2% Overall Placement Location: Paving, South side of building, southeast corner to west building 600, grid lines 1-13/F-L Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 96,780 Area (in') 28.27 Type 6 Sample Location: Grid lines G-3 REPORT OF TESTS Compressive Strength (psi) 3,420 Fracture Type Type6 Cylinder Marked Date Set No. Tested 2 1 01/12/2008 2 2 02/02/2008 2 3 02/02/2008 2 4 03/01/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 ~Ej ~~ ITrn ~ DO D Type 1 Type 2 Type 3 Type 4 Type 5 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd. (KWfK'N) Page 2 of 10