Loading...
Gateway BP(3.1)-LR080102 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303891 Project No.: 0712786 Date of Service: 11/01/2007 Report Date: 01/02/2008 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Measured Slump (inches) 4.75 Mix Design 1.0.: 23601524 Placement Date: 11/01/2007 Weather Conditions: Calm, clear Time Sampled: 04:00am Batch time: 02:33am Temperature - Air: 500F Concrete: 740F Truck No: 1067 Ticket No: 88055996 Air Content: 2.8% Unit Weight (pet): NA Overall Placement Location: Paving - south side of building 2 from 5'-160' south, 0'-220' east from southwest corner, east side of (continue) Sample Location: 20' south, 20' east from southwest corner of building 2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 11/08/2007 7 6.00 28.27 67,640 2,390 Shear 1 2 11/29/2007 28 6.00 28.27 109,150 3,860 Cone/Split 1 3 11/29/2007 28 6.00 28.27 111 ,080 3,930 Cone/Split Average 3,890 4 12/27/2007 56 6.00 28.27 127,170 4,500 Cone/Split Remarks: building 2 from 0'-150' north, 5'-50' east from southeast corner Batch plant notified about air test results L1MITA nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 1 of 6 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303891 Project No.: 0712786 Date of Service: 11/01/2007 Report Date: 01/02/2008 Project: Gateway Business Center Cappell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Measured Slump (inches) 5.0 Mix Design I.D.: 23601524 Placement Date: 11/01/2007 Weather Conditions: Calm, clear Time Sampled: 06:08am Batch time: 05:21am Temperature - Air: 520F Concrete: 740F Truck No: 1245 Ticket No: 88056010 Air Content: 5.5% Unit Weight (pct): NA Overall Placement Location: Paving - south side of building 2 from 5'-160' south, 0'-220' east from southwest corner, east side of (continue) Sample Location: 110' south, 100' esat from southwest corner of building 2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 2 1 11/08/2007 7 6.00 28.27 69,660 2,460 Shear 2 2 11/29/2007 28 6.00 28.27 124,150 4,390 Cone/Split 2 3 11/29/2007 28 6.00 28.27 120,010 4,240 Cone/Split Average 4,320 2 4 12/27/2007 56 6.00 28.27 132,810 4,700 Cone/Split Remarks: building 2 from 0'-150' north, 5'-50' east from southeast corner LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, LId. (CH/KW) Page 2 of 6 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303891 Project No.: 0712786 Date of Service: 11/01/2007 Report Date: 01/02/2008 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Measured Slump (inches) 4.5 Mix Design 1.0.: 23601524 Placement Date: 11/01/2007 Weather Conditions: Calm, clear Time Sampled: 07:09am Batch time: 06:29am Temperature - Air: 470F Concrete: 720F Truck No: 1090 Ticket No: 88056021 Air Content: 3.8% Unit Weight (pct): NA Overall Placement Location: Paving - south side of building 2 from 5'-160' south, 0'-220' east from southwest corner, east side of (continue) Sample Location: 90' south, 30' east from southeast corner of building 2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 3 1 11/08/2007 7 6.00 28.27 81,330 2,880 Cone/Split 3 2 11/29/2007 28 6.00 28.27 116,170 4,110 Cone/Split 3 3 11/29/2007 28 6.00 28.27 114,310 4,040 Cone/Split Average 4,080 3 4 12/27/2007 56 6.00 28.27 134,040 4,740 Cone/Split Remarks: building 2 from 0'-150' north, 5'-50' east from southeast corner LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 3 of 6 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303891 Project No.: 0712786 Date of Service: 11/01/2007 Report Date: 01/02/2008 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Measured Slump (inches) 4.0 Mix Design I.D.: 23601524 Placement Date: 11/01/2007 Weather Conditions: Calm, clear Time Sampled: 08:48am Batch time: 07:54am Temperature - Air: 510F Concrete: 740F Truck No: 1337 Ticket No: 88056034 Air Content: 3.1 % Unit Weight (pcf): NA Overall Placement Location: Paving - south side of building 2 from 5'-160' south, 0'-220' east from southwest corner, east side of (continue) Sample Location: 30' south, 40' east from southeast corner of building 2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 4 1 11/08/2007 7 6.00 28.27 103,010 3,640 Cone/Split 4 2 11/29/2007 28 6.00 28.27 130,390 4,610 Cone/Split 4 3 11/29/2007 28 6.00 28.27 137,240 4,850 Cone/Split Average 4,730 4 4 12/27/2007 56 6.00 28.27 151,890 5,370 Cone/Split Remarks: building 2 from 0'-150' north, 5'-50' east from southeast corner LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 4 of 6 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303891 Project No.: 0712786 Date ot Service: 11/01/2007 Report Date: 01/02/2008 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Measured Slump (inches) 4.5 Mix Design 1.0.: 23601524 Placement Date: 11/01/2007 Weather Conditions: Calm, clear Time Sampled: 10:36am Batch time: 09:15am Temperature - Air: 580F Concrete: 740F Truck No: 1245 Ticket No: 88056051 Air Content: 4.6% Unit Weight (pet): NA Overall Placement Location: Paving - south side of building 2 from 5'-160' south, 0'-220' east from southwest corner, east side of (continue) Sample Location: 70' north, 30' east from southeast corner of building 2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 5 1 11/08/2007 7 6.00 28.27 71 ,740 2,540 Shear 5 2 11/29/2007 28 6.00 28.27 124,210 4,390 Cone/Split 5 3 11/29/2007 28 6.00 28.27 122,420 4,330 Cone/Split Average 4,360 5 4 12/27/2007 56 6.00 28.27 133,210 4,710 Cone/Split Remarks: building 2 from 0'-150' north, 5'-50' east from southeast corner Water added at site: 30 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 5 of 6 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 308634 Project No.: 0712786 Date of Service: 12/20/2007 Report Date: 01/02/2008 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 135 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 07:43am Concrete: 580F Ticket No: 13559813 Unit Weight (pet): NA Measured Slump (inches) 4.75 Mix Design 1.0.: 330j1504 Placement Date: 12/20/2007 Weather Conditions: Cloudy Time Sampled: 08:42am Temperature - Air: 550F Truck No: 1247 Air Content: 3.6% Overall Placement Location: Sidewalk, ramps - paving repair at various locations surrounding buildings 1 and 2 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 96,490 Area (in') 28.27 Type 6 Sample Location: Pavement repair behind building #1 at front parking 48' north, 6' east from southeast corner of building #1 REPORT OF TESTS Compressive Strength (psi) 3,410 Fracture Type Type2 Cylinder Marked Date Set No. Tested 1 1 12/27/2007 1 2 01/17/2008 1 3 01/17/2008 1 4 02/14/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 t8][3 ~~ 5J] E;] DO D Type 1 Type 2 Type 3 Type 4 Type 5 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd. (CH/KW) Page 1 of 2 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 304062 Project No.: 0712786 Date of Service: 11/02/2007 Report Date: 01/02/2008 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 1 1 11/09/2007 7 6.00 28.27 71,700 2,540 2 11/30/2007 28 6.00 28.27 100,570 3,560 3 11/30/2007 28 6.00 28.27 94,070 3,330 Average 3,440 * 4 12/28/2007 56 6.00 28.27 122,220 4,320 Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Req uirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 23601524 Placement Date: 11/02/2007 Weather Conditions: Cloudy Time Sampled: 04:30am Temperature - Air: 600F Truck No: 1070 Air Content: 2.5% Overall Placement Location: Fire lane and park paving on north side of building 2 Measured Slump (inches) 8.0 Batch time: 04:09am Concrete: 710F Ticket No: 88056117 Unit Weight (pet): NA Sample Location: 45' west, 40' north from northwest corner of building 2 Fracture Type Cone/Split Cone/Split Cone/Split Cone/Split * Does not comply with specified strength Remarks: Water added at site: 15 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 1 of 5 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 304062 Project No.: 0712786 Date of Service: 11/02/2007 Report Date: 01/02/2008 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 23601524 Placement Date: 11/02/2007 Weather Conditions: Cloudy Time Sampled: 05:30am Temperature - Air: 650F Truck No: 1382 Air Content: 3.0% Overall Placement Location: Fire lane and park paving on north side of building 2 Measured Slump (inches) 8.0 Batch time: 04:37am Concrete: 710F Ticket No: 88056125 Unit Weight (pet): NA Sample Location: 20' north, 55' east from corner of building 2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 2 1 11/09/2007 7 6.00 28.27 62,860 2,220 Shear 2 2 11/30/2007 28 6.00 28.27 91,700 3,240 Cone/Shear 2 3 11/30/2007 28 6.00 28.27 97,270 3,440 Cone/Split Average 3,340 * 2 4 12/28/2007 56 6.00 28.27 120,080 4,250 Cone/Split * Does not comply with specified strength Remarks: Water added at site: 15 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 2 of 5 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 304062 Project No.: 0712786 Date of Service: 11/02/2007 Report Date: 01/02/2008 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 23601524 Placement Date: 11/02/2007 Weather Conditions: Cloudy Time Sampled: 08:00am Temperature - Air: 650F Truck No: 1206 Air Content: 4.2% Overall Placement Location: Fire lane and park paving on north side of building 2 Measured Slump (inches) 8.5 Batch time: 06:27am Concrete: 71~F Ticket No: 88056137 Unit Weight (pet): NA Sample Location: 25' north, 5' west from corner of building 2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 3 1 11/09/2007 7 6.00 28.27 58,830 2,080 Shear 3 2 11/30/2007 28 6.00 28.27 93,610 3,310 Cone/Split 3 3 11/30/2007 28 6.00 28.27 96,250 3,400 Cone/Split Average 3,360 * 3 4 12/28/2007 56 6.00 28.27 115,520 4,090 Cone/Split * Does not comply with specified strength Remarks: Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 3 of 5 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 304062 Project No.: 0712786 Date of Service: 11/02/2007 Report Date: 01/02/2008 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @28 days Slump (in.): 3" - 5" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 23601524 Placement Date: 11/02/2007 Weather Conditions: Cloudy Time Sampled: 09:30am Temperature - Air: 650F Truck No: 1070 Air Content: 3.9% Overall Placement Location: Fire lane and park paving on north side of building 2 Measured Slump (inches) 8.0 Batch time: 07:49am Concrete: 710F Ticket No: 88056146 Unit Weight (pet): NA Sample Location: 35' east, 20' north from southeast building corner REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 4 1 11/09/2007 7 6.00 28.27 71 ,400 2,530 Shear 4 2 11/30/2007 28 6.00 28.27 95,600 3,380 Shear 4 3 11/30/2007 28 6.00 28.27 99,510 3,520 Cone/Shear Average 3,450 * 4 4 12/28/2007 56 6.00 28.27 120,410 4,260 Cone/Split * Does not comply with specified strength LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd. (CH/KW) Page 4 of 5