Loading...
Park West CC(15.1)-LR080107 REED EnGinEERinG GEOTECHNICAL AND G R 0 U F' ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT BMC West Additi~ 425 Airline Drive Cappell, Texas REPORTED TO: BMC West Corporation 425 Airline Drive, Suite 200 Coppell, Texas 75019 A TTN: Mr. Danny McQuary CONTRACTOR: D/B Constructors, Inc. REPORT NO. 17 REG PROJECT NO. 14935 SAMPLE DATE: 01-07-08 TECHNICIAN: N. Tsougarakis PAGE: 1 of 2 Location of Sample Set Number Location 1 Paving: 110'S, 60'W from SW corner of existing bldg. 2 Paving: 140'S, 160'W from SW corner of existing bldg. 3 Paving: 110'N, 400'W from SW corner of existing bldg. 4 Paving: 200'N, 425'W from SW corner of existing bldg. 5 Paving: 80'S, 415'W from NW corner of existing bldg. 6 Pavin : 25'N, 450'W from NW corner of existin bid . Design Information Source of Concrete TXI 2 1465 1465 1465 1465 3 1466 1466 1466 1466 4 Mix Identification 8272 Date Tested 01-14-08 02-04-08 02-04-08 Hold Age@ Test 7 28 28 H Quantity Represented 60/600 160/600 280/600 370/600 460/600 540/600 Specified Strength p.s.i. 4000 Total Load Ibs. 46470 Compressive Strength p.s.i. 3700 Average Strength p.s.i. 01-14-08 02-04-08 02-04-08 Hold 7 28 28 H 47390 3770 01-14-08 02-04-08 02-04-08 Hold 7 28 28 H 49300 3920 01-14-08 02-04-08 02-04-08 Hold 7 28 28 H 38370 3050 ~ -' 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . fAX [214] 3500019 REPORT NO. 17 REG PROJECT NO. 14935 SAMPLE DATE: 01-07-08 PAGE: 2 of 2 Average Strength p.s.i. Compressive Strength p.s.i. 3360 Total Load Ibs. 42280 Age@ Date Tested Test 01-14-08 7 02-04-08 28 02-04-08 28 Hold H 6 1469 01-14-08 7 1469 02-04-08 28 1469 02-04-08 28 1469 Hold H 46060 3660 Cylinder Data Set Cylinder Time of Concrete Air Ticket No. 10 Slump Sample Air Temp. Temp. Entrainment Number 1 1464 7.0 9:00AM 70 70 4.5 601089 2 1465 5.0 10:20AM 70 70 4.5 601226 3 1466 5.0 11 :30AM 78 80 4.5 601347 4 1467 5.5 12:15PM 75 78 4.5 601407 5 1468 6.0 1:15PM 78 80 5.0 601580 6 1469 5.0 2:40PM 76 80 5.0 601642 Submitted by: E-Mail Distribution: (1) BMC West Corporation/ Mr. Danny McQuary (1) Pross Design Group/ Mr. Charles Miller (1) D/B Constructors, Inc.l Mr. Michael Smith (1) BMC West Corporation/ Mr. Mike Maring (1) Hunt & Joiner/Mr. Steve Dial REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT ML/lnc Mail Distribution: (1) Icon Consulting Engineers! Mr. David Gregory (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone REED EnGinEERinG GEOTECHNICAL AND G R Cl LJ F' ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT BMC West Addition 425 Airline Drive Coppell, Texas REPORTED TO: BMC West Corporation 425 Airline Drive, Suite 200 Coppell, Texas 75019 ATTN: Mr. Danny McQuary REPORT NO. 18 REG PROJECT NO. 14935 SAMPLE DATE: 01-07-08 TECHNICIAN: T. Miller PAGE: 1 of 1 CONTRACTOR: D!B Constructors, Inc. Location of Sam Ie Set Number Location 1 Pier: D.5-5 Desi n Information Source of Concrete TXI Mix Identification 0046 ecified Stren 3000 Date Tested 01-14-08 02-04-08 02-04-08 Hold Age@ Test 7 28 28 H Total Load Ibs. 47820 Cylinder 10 1453 Air Entrainment NA Ticket Number 601694 E-Mail Distribution: (1) BMC West Corporation! Mr. Danny McQuary (1) Pross Design Group! Mr. Charles Miller (1) D!B Constructors, Inc.l Mr. Michael Smith (1) BMC West Corporation! Mr. Mike Maring (1) Hunt & Joiner/Mr. Steve Dial Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT MLllnc Mail Distribution: (1) Icon Consulting Engineers! Mr. David Gregory (1) City of Coppell!Mr. Larry Davis (1) City of Coppell!Mr. Lee Stone 2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . FAX [214] 3500019