Loading...
Gateway BP(3.1)-LR080102 (2) Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Transwestern Com mer . 5001 Spring Valley Dallas, TX 752 Report of Concrete Compressive Strength Test Report No.: 303891 Project No.: 0712786 Date of Service: 11/01/2007 Report Date: 01/02/2008 PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 RT OF TESTS Conc)ete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 11/08/2007 7 6.00 28.27 67,640 2,390 Shear 1 2 11/29/2007 28 6.00 28.27 1 09, 150 3,860 Cone/Split 1 3 11/29/2007 28 6.00 28.27 111,080 3,930 Cone/Split Average 3,890 1 4 12/27/2007 56 6.00 28.27 127,170 4,500 Cone/Split Mix Design I.D.: 23601524 Placement Date: 11/01/2007 Weather Conditions: Calm, clear Time Sampl 04:00am Batch time: 02:33am Temper 500F Concrete: 740F Tru 0: 1067 Ticket No: 88055996 A' ontent 2.8% Unit Weight (pet): NA II PI ent Location: - sou Ide of building 2 from 5'-160' south, 0'-220' east from southwest ,east ! e of (continue) Measured Slump (inches) 4.75 Location: , 20' east from southwest corner of building 2 Remarks: building 2 from 0'-150' north, 5'-50' east from southeast corner Batch plant notified about air test results J t I ~~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 1 of 6 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303891 Project No.: 0712786 Date of Service: 11/01/2007 Report Date: 01/02/2008 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 23601524 Placement Date: 11/01/2007 Weather Conditions: Calm, clear Time Sampled: 06:08am Batch time: 05:21am Temperature - Air: 520F Concrete: 740F Truck No: 1245 Ticket No: 88056010 Air Content: 5.5% Unit Weight (pet): NA Overall Placement Location: Paving - south side of building 2 from 5'-160' south, 0'-220' east from southwest corner, east side of (continue) Measured Slump (inches) 5.0 Sample Location: 110' south, 100' esat from southwest corner of building 2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 2 1 11/08/2007 7 6.00 28.27 69,660 2,460 Shear 2 2 11/29/2007 28 6.00 28.27 124,150 4,390 Cone/Split 2 3 11/29/2007 28 6.00 28.27 120,010 4,240 Cone/Split Average 4,320 2 4 12/27/2007 56 6.00 28.27 132,810 4,700 Cone/Split Remarks: building 2 from 0'-150' north, 5'-50' east from southeast corner LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 2 of 6 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303891 Project No.: 0712786 Date of Service: 11/01/2007 Report Date: 01/02/2008 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 23601524 Placement Date: 11/01/2007 Weather Conditions: Calm, clear Time Sampled: 07:09am Batch time: 06:29am Temperature - Air: 470F Concrete: 720F Truck No: 1090 Ticket No: 88056021 Air Content: 3.8% Unit Weight (pet): NA Overall Placement Location: Paving - south side of building 2 from 5'-160' south, 0'-220' east from southwest corner, east side of (continue) Measured Slump (inches) 4.5 Sample Location: 90' south, 30' east from southeast corner of building 2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked : Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 3 1 11/08/2007 7 6.00 28.27 81,330 2,880 Cone/Split 3 2 11/29/2007 28 6.00 28.27 116,170 4,110 Cone/Split 3 3 11/29/2007 28 6.00 28.27 114,310 4,040 Cone/Split Average 4,080 3 4 12/27/2007 56 6.00 28.27 134,040 4,740 Cone/Split Remarks: building 2 from 0'-150' north, 5'-50' east from southeast corner LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CHfKW) Page 3 of 6 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303891 Project No.: 0712786 Date of Service: 11/01/2007 Report Date: 01/02/2008 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 23601524 Placement Date: 11/01/2007 Weather Conditions: Calm, clear Time Sampled: 08:48am Batch time: 07:54am Temperature - Air: 510F Concrete: 740F Truck No: 1337 Ticket No: 88056034 Air Content: 3.1 % Unit Weight (pet): NA Overall Placement Location: Paving - south side of building 2 from 5'-160' south, 0'-220' east from southwest corner, east side of (continue) Measured Slump (inches) 4.0 Sample Location: 30' south, 40' east from southeast corner of building 2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 4 1 11/08/2007 7 6.00 28.27 103,010 3,640 Cone/Split 4 2 11/29/2007 28 6.00 28.27 130,390 4,610 Cone/Split 4 3 11/29/2007 28 6.00 28.27 137,240 4,850 Cone/Split Average 4,730 4 4 12/27/2007 56 6.00 28.27 151,890 5,370 Cone/Split Remarks: building 2 from 0'-150' north, 5'-50' east from southeast corner LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 4 of 6 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303891 Project No.: 0712786 Date of Service: 11/01/2007 Report Date: 01/02/2008 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 23601524 Placement Date: 11/01/2007 Weather Conditions: Calm, clear Time Sampled: 10:36am Batch time: 09:15am Temperature - Air: 580F Concrete: 740F Truck No: 1245 Ticket No: 88056051 Air Content: 4.6% Unit Weight (pet): NA Overall Placement Location: Paving - south side of building 2 from 5'-160' south, 0'-220' east from southwest corner, east side of (continue) Measured Slump (inches) 4.5 Sample Location: 70' north, 30' east from southeast corner of building 2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 5 1 11/08/2007 7 6.00 28.27 71,740 2,540 Shear 5 2 11/29/2007 28 6.00 28.27 124,210 4,390 Cone/Split 5 3 11/29/2007 28 6.00 28.27 122,420 4,330 Cone/Split Average 4,360 5 4 12/27/2007 56 6.00 28.27 133,210 4,710 Cone/Split Remarks: building 2 from 0'-150' north, 5'-50' east from southeast corner Water added at site: 30 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CHfKW) Page 5 of 6