Loading...
Duke Lesley 2A-LR080102 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 308805 Project No.: 0712932 Date of Service: 12/21/2007 Report Date: 01/02/2008 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753 PW Placement Date: 12/21/2007 Weather Conditions: Sunny Time Sampled: 08:45am Temperature - Air: 570F Truck No: 104 Air Content: 6.0% Overall Placement Location: Southwest ramp Batch time: 08:23am Concrete: 560F Ticket No: 17772 Unit Weight (pcf): NA Measured Slump (inches) 5.5 Sample Location: 30' south, 20' east from northwest corner of ramp REPORT OF TESTS Cylinder Marked Date Set No. Tested 1 1 12/28/2007 1 2 01/18/2008 1 3 01/18/2008 4 02/15/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 ~E3 ~Q] [ill] E] DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 107,470 Compressive Strength (psi) 3,800 Fracture Type Type5 Area (in') 28.27 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (KW/KW) Page 1 of 2 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 308805 Project No.: 0712932 Date of Service: 12/21/2007 Report Date: 01/02/2008 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753 PW Placement Date: 12/21/2007 Weather Conditions: Sunny Time Sampled: 10:10am Temperature - Air: 5850F Truck No: 130 Air Content: 6.0% Overall Placement Location: Southwest ramp Batch time: 09:55am Concrete: 560F Ticket No: 9979 Unit Weight (pcf): NA Measured Slump (inches) 4.5 Sample Location: 50' south, 40' west from northeast corner of ramp REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Com pressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 2 1 12/28/2007 7 6.00 28.27 117,580 4,160 Type5 2 2 01/18/2008 28 2 3 01/18/2008 28 2 4 02/15/2008 56 ~ESJ [S]~ ill] ~ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Finished: 11 :45am Technician: Danny Howard Started: 07:30am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr Ryan Skelly 1-cc City of Coppell AUn: Mr. Lee Stone 1-cc City of Coppell AUn: Mr. Larry Davis Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMIT A nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 2 of 2 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303893 Project No.: 0712932 Date of Service: 11/01/2007 Report Date: 01/02/2008 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 7753 PW Placement Date: 11/01/2007 Weather Conditions: Clear Time Sampled: 05:20am Temperature - Air: 460F Truck No: 106 Air Content: 4.3% Overall Placement Location: Paving at Point West V11 (Northwest corner orf trailer parking traveling west into street) Batch time: 04:59am Concrete: 800F Ticket No: 8679 Unit Weight (pet): NA Measured Slump (inches) 5.75 Sample Location: 30' north, 10' west from southeast corner of paving REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 11/08/2007 7 6.00 28.27 81,190 2,870 Cone/Shear 1 2 11/29/2007 28 6.00 28.27 118,330 4,190 Shear 1 3 11/29/2007 28 6.00 28.27 119,810 4,240 Shear Average 4,210 1 4 12/27/2007 56 6.00 28.27 136,030 4,810 Cone/Split LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 1 of 6 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303893 Project No.: 0712932 Date of Service: 11/01/2007 Report Date: 01/02/2008 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 06:41am Concrete: 800F Ticket No: 8689 Unit Weight (pet): NA Measured Slump (inches) 5.0 Mix Design 1.0.: 7753 PW Placement Date: 11/01/2007 Weather Conditions: Clear Time Sampled: 07:00am Temperature - Air: 500F Truck No: 107 Air Content: 4.5% Overall Placement Location: Paving at Point West V11 (Northwest corner orf trailer parking traveling west into street) Sample Location: 75' north, 20' west from southeast corner of paving REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 2 1 11/08/2007 7 6.00 28.27 86,550 3,060 Cone/Split 2 2 11/29/2007 28 6.00 28.27 142,960 5,060 Cone/Split 2 3 11/29/2007 28 6.00 28.27 138,410 4,900 Cone/Shear Average 4,980 2 4 12/27/2007 56 6.00 28.27 156,680 5,540 Cone/Split Remarks: Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 2 of 6 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303893 Project No.: 0712932 Date of Service: 11/01/2007 Report Date: 01/02/2008 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 Measured Slump (inches) 5.5 Mix Design 1.0.: 7753 PW Placement Date: 11/01/2007 Weather Conditions: Sunny, clear Time Sampled: 08:10am Batch time: 07:49am Temperature - Air: 550F Concrete: 820F Truck No: 141 Ticket No: 8698 Air Content: 4.6% Unit Weight (pet): NA Overall Placement Location: Paving at Point West V11 (Northwest corner ort trailer parking traveling west into street) Sample Location: 110' north, 40' west from southeast corner of paving REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 3 1 11/08/2007 7 6.00 28.27 109,620 3,880 Cone/Split 3 2 11/29/2007 28 6.00 28.27 159,980 5,660 Cone/Split 3 3 11/29/2007 28 6.00 28.27 164,290 5,810 Cone/Split Average 5,730 3 4 12/27/2007 56 6.00 28.27 168,690 5,970 Cone/Split Remarks: Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 3 of 6 Rone Engineering. . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303893 Project No.: 0712932 Date of Service: 11/01/2007 Report Date: 01/02/2008 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 Measured Slump (inches) 5.75 Mix Design 1.0.: 7753 PW Placement Date: 11/01/2007 Weather Conditions: Sunny, partly cloudy Time Sampled: 09:30am Batch time: 09:13am Temperature - Air: 600F Concrete: 850F Truck No: 106 Ticket No: 8707 Air Content: 4.4% Unit Weight (pet): NA Overall Placement Location: Paving at Point West V11 (Northwest corner orf trailer parking traveling west into street) Sample Location: 180' north, 15' west from southeast corner of paving REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 4 1 11/08/2007 7 6.00 28.27 113,960 4,030 Cone/Split 4 2 11/29/2007 28 6.00 28.27 159,110 5,630 Cone/Split 4 3 11/29/2007 28 6.00 28.27 163,670 5,790 Cone/Split Average 5,710 4 4 12/27/2007 56 6.00 28.27 177,780 6,290 Cone/Split Remarks: Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 4 of 6 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303893 Project No.: 0712932 Date of Service: 11/01/2007 Report Date: 01/02/2008 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1,2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 Measured Slump (inches) 5.0 Mix Design 1.0.: 7753 PW Placement Date: 11/01/2007 Weather Conditions: Sunny, partly cloudy Time Sampled: 11 AOam Batch time: 11 :28am Temperature - Air: 600F Concrete: 860F Truck No: 127 Ticket No: 15453 Air Content: 4.1 % Unit Weight (pct): NA Overall Placement Location: Paving at Point West V11 (Northwest corner orf trailer parking traveling west into street) Sample Location: 250' north, 5' west from southeast corner of paving REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 5 1 11/08/2007 7 6.00 28.27 91,110 3,220 Cone/Split 5 2 11/29/2007 28 6,00 28,27 135,920 4,810 Cone/Split 5 3 11/29/2007 28 6.00 28.27 136,860 4,840 Cone/Split Average 4,820 5 4 12/27/2007 56 6,00 28.27 155,570 5,500 Cone/Split Remarks: Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 5 of 6 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 303893 Project No.: 0712932 Date of Service: 11/01/2007 Report Date: 01/02/2008 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Measured Slump (inches) 5.25 Mix Design I.D.: 7753 PW Placement Date: 11/01/2007 Weather Conditions: Sunny, partly cloudy Time Sampled: 12:15pm Batch time: 11:59am Temperature - Air: 650F Concrete: 860F Truck No: 106 Ticket No: 8721 Air Content: 4.0% Unit Weight (pet): NA Overall Placement Location: Paving at Point West V11 (Northwest corner orf trailer parking traveling west into street) Sample Location: 300' north, 25' west from southeast corner of paving REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 6 1 11/08/2007 7 6.00 28.27 91,980 3,250 Cone/Split 6 2 11/29/2007 28 6.00 28.27 137,710 4,870 Cone/Split 6 3 11/29/2007 28 6.00 28.27 134,880 4,770 Cone/Split Average 4,820 6 4 12/27/2007 56 6.00 28.27 150,670 5,330 Shear Remarks: Water added at site: 5 gallons Started: 04:45am Finished: 02:30pm Technician: Montreal Bailey Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided fDr testing. We assume nD respDnsibility for variation in quality (composition, appearance, etc.) Dr any other feature of similar subject matter provided by persDns Dr conditiDns Dver which we have no control. Our letters and reports are for the exclusive use of the clients tD whDm they are addressed and shall nDt be reprDduced except in full without the written approval of RDne Engineering Services, Ltd. (CH/KW) Page 6 Df 6