Loading...
Duke Lesley 1A-LR071218 Rone En~~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 307701 Project No.: 0713408 Date of Service: 12/08/2007 Report Date: 12/18/2007 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 7753 Placement Date: 12/08/2007 Weather Conditions: Mostly cloudy Time Sampled: 03:45am Batch time: Temperature - Air: 670F Concrete: 730F Truck No: 126 Ticket No: Air Content: 4.0% Unit Weight (pet): NA Overall Placement Location: Paving - 3rd section at north side of building VI- 60' north start, 120' end, grid line A/8.2-A/17.3 Measured Slump (inches) 5.0 Sample Location: Gridline A/17.1 - 90' north REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 109,950 Cylinder Marked Date Set No. Tested 1 1 12/15/2007 1 2 01/05/2008 1 3 01/05/2008 1 4 02/02/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 ~tJ .'. QJ [)IE lSJ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Compressive Strength (psi) 3,890 Fracture Type Type2 Area (in2) 28.27 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DM/JB) Page 1 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 307701 Project No.: 0713408 Date of Service: 12/08/2007 Report Date: 12/18/2007 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 7753 Placement Date: 12/08/2007 Weather Conditions: Mostly cloudy Time Sampled: 04:45am Batch time: Temperature - Air: 690F Concrete: 700F Truck No: 101 Ticket No: Air Content: 5.0% Unit Weight (pet): NA Overall Placement Location: Paving - 3rd section at north side of building VI - 60' north start, 120' end, grid line A/8.2-A/17.3 Measured Slump (inches) 6.0 Sample Location: Gridline A/16.3 - 77' north REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 87,930 Cylinder Marked Date Set No. Tested 2 1 12/15/2007 2 2 01/05/2008 2 3 01/05/2008 2 4 02/02/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 ~E:j [9]QJ [)IE bJ DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 Compressive Strength (psi) 3,110 Fracture Type Type2 Area (in2) 28.27 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DM/JB) Page 3 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 307701 Project No.: 0713408 Date of Service: 12/08/2007 Report Date: 12/18/2007 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 7753 Placement Date: 12/08/2007 Weather Conditions: Mostly cloudy Time Sampled: 05:45am Batch time: Temperature - Air: 660F Concrete: 710F Truck No: 130 Ticket No: Air Content: 4.7% Unit Weight (pet): NA Overall Placement Location: Paving - 3rd section at north side of building VI - 60' north start, 120' end, grid line A/8.2-A/17.3 Measured Slump (inches) 5.75 Sample Location: Gridline A/14. 7 - 115' north REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 90,250 Cylinder Marked Date Set No. Tested 3 1 12/15/2007 3 2 01/05/2008 3 3 01/05/2008 3 4 02/02/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 ~EJ ~[] fIE tsJ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Compressive Strength (psi) 3,190 Fracture Type Type3 Area (in') 28.27 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DM/JB) Page 5 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, 8te 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 307701 Project No.: 0713408 Date of Service: 12/08/2007 Report Date: 12/18/2007 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 7753 Placement Date: 12/08/2007 Weather Conditions: Mostly cloudy Time Sampled: 08:00am Batch time: Temperature - Air: 700F Concrete: 740F Truck No: 136 Ticket No: Air Content: 5.0% Unit Weight (pet): NA Overall Placement Location: Paving - 3rd section at north side of building VI - 60' north start, 120' end, grid line A/8.2-A/17.3 Measured Slump (inches) 5.75 Sample Location: Gridline A/12.8 - 70' south REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 89,290 Cylinder Marked Date Set No. Tested 4 1 12/15/2007 4 2 01/05/2008 4 3 01/05/2008 4 4 02/02/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 ~E3 ~[g [[E lSJ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Compressive Strength (psi) 3,160 Fracture Type Type2 Area (in') 28.27 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DM/JB) Page 6 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 307701 Project No.: 0713408 Date of Service: 12/08/2007 Report Date: 12/18/2007 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air ('Yo): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 7753 Placement Date: 12/08/2007 Weather Conditions: Clear Time Sampled: 09:15am Temperature - Air: 690F Truck No: 131 Air Content: 4.5% Overall Placement Location: Paving - 3rd section at north side of building VI - 60' north start, 120' end, grid line A/8.2-A/17.3 Batch time: Concrete: 740F Ticket No: Unit Weight (pcf): NA Measured Slump (inches) 4.75 Sample Location: Gridline A/11.5 - 120' north REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 119,610 Cylinder Marked Date Set No. Tested 5 1 12/15/2007 5 2 01/05/2008 5 3 01/05/2008 5 4 02/02/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 ~EJ ~Q] ~ E;J DO D Type 1 Type 2 Type 3 Type 4 Type 5 Compressive Strength (psi) 4,230 Fracture Type Type2 Area (in') 28.27 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd. (DM/JB) Page 7 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 307701 Project No.: 0713408 Date of Service: 12/08/2007 Report Date: 12/18/2007 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 7753 Placement Date: 12/08/2007 Weather Conditions: Windy, mostly cloudy Time Sampled: 10:01am Batch time: Temperature - Air: 690F Concrete: 740F Truck No: 126 Ticket No: Air Content: 4.9% Unit Weight (pet): NA Overall Placement Location: Paving - 3rd section at north side of building VI - 60' north start, 120' end, grid line A/8.2-A/17.3 Measured Slump (inches) 6.0 Sample Location: Gridline A/1 0.7 - 85' north REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 93,000 Cylinder Marked Date Set No. Tested 6 1 12/15/2007 6 2 01/05/2008 6 3 01/05/2008 6 4 02/02/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 ~E3 ~~ &Ij ~ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Compressive Strength (psi) 3,290 Fracture Type Type5 Area (in2) 28.27 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exciusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DM/JB) Page 8 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 307701 Project No.: 0713408 Date of Service: 12/08/2007 Report Date: 12/18/2007 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design J.D.: 7753 Placement Date: 12/08/2007 Weather Conditions: Windy, mostly cloudy Time Sampled: 11:17am Batch time: Temperature - Air: 790F Concrete: 710F Truck No: 110 Ticket No: Air Content: 5.1 % Unit Weight (pet): NA Overall Placement Location: Paving - 3rd section at north side of building VI- 60' north start, 120' end, grid line A/8.2-A/17.3 Measured Slump (inches) 5.0 Sample Location: Gridline Al9.8 - 95' north REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 110,160 Cylinder Marked Date Set No. Tested 7 1 12/15/2007 7 2 01/05/2008 7 3 01/05/2008 7 4 02/02/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 ~EJ ~Q] ffiE [] DO D Type 1 Type 2 Type 3 Type 4 Type 5 Compressive Strength (psi) 3,900 Fracture Type Type5 Area (in2) 28.27 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DM/JB) Page 9 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, 8te 600, Houston, TX 77040 4421 Freidrich, 8te 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 307701 Project No.: 0713408 Date of Service: 12/08/2007 Report Date: 12/18/2007 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 7753 Placement Date: 12/08/2007 Weather Conditions: Windy, mostly cloudy Time Sampled: 12:00pm Batch time: Temperature - Air: 800F Concrete: 720F Truck No: 144 Ticket No: Air Content: 4.5% Unit Weight (pet): NA Overall Placement Location: Paving - 3rd section at north side of building VI - 60' north start, 120' end, grid line AlB.2-Al17.3 Measured Slump (inches) 5.5 Sample Location: Gridline AlB.4 - 105' south REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 8 1 12/15/2007 7 6.00 28.27 112,100 3,960 Type2 8 2 01/05/2008 28 8 3 01/05/2008 28 8 4 02/02/2008 56 ljL] ~~ 5ru ~ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Technician: Javier Martinez Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Emmit Coots (1-ec copy) 1-ec Poller Concrete Alln: Mr Ryan Skelly 1-cc Pacheco Koch Consulting Engineers Alln: Mr. Jack Evans 1-cc City of Coppell Alln: Mr. Larry Davis 1-cc City of Coppell Alln: Mr. Lee Stone Type 6 Started: 02:15am Finished: 02:15pm Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DM/JB) Page 11 of 11