Loading...
Duke Lesley 3C-LR080201 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Report of Concrete Compressive Strength Test Duke Construction, LP Report No.: 309547 14241 Dallas Pkwy, Ste 1000 Project No.: 0711530 Dallas, TX 75254-2936 Date of Service: 01/03/2008 ./ Report Date: 02/01/2008 Project: Point West OffiC~c.. Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. r IV ftrL Contractor: Duke Construction, LP Concrete Supplier: Potter Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7752PW Placement Date: 01/0312008 Weather Conditions: Cloudy Time Sampled: 10:05am Temperature - Air: 330F Truck No: 137 Air Content: 5.0% Overall Placement Location: Paving, building 1, south side o/~/~~~ Batch time: 09:39am Concrete: 460F Ticket No: 9999 Unit Weight (pcf): NA Measured Slump (inches) 3.0 Sample Location: 40' east from south corner REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in2) (Ibs) (psi) 1 1 01/10/2008 7 6.00 28.27 160,020 5,660 2 01/3112008 28 6.00 28.27 188,480 6,670 3 01/31/2008 28 6.00 28.27 193,350 6,840 Average 6,750 4 02/28/2008 56 ~6 ~Q] fillj [] DO D . , )..1 .1. Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Fracture Type Type2 Type2 Type3 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW) Page 1 of 6 . Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 309547 Project No.: 0711530 Date of Service: 01/03/2008 Report Date: 02/01/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 2 1 01/10/2008 7 6.00 28.27 110,880 3,920 2 2 01/31/2008 28 6.00 28.27 137,370 4,860 2 3 01/31/2008 28 6.00 28.27 142,950 5,060 Average 4,960 2 4 02/28/2008 56 Contractor: Juke Construction, LP Concrete Supplier: Potter Plant: 10 Specification Requireme.lts Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 f21~ [[SJ~ [G] [;J DO D Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA Mix Design 1.0.: 7752PW Placement Date: 01/03/2008 Weather Cor :litions: Cloudy Time Sampled: 11 :30am Temperature - Air: 370F Truck No: 128 Air Content: 4.8% Overall Placement Location: Paving, building 1, south side Batch time: 11:15am Concrete: 470F Ticket No: 10012 Unit Weight (pct): NA Measured Slump (inches) 5.0 Sample Location: 32' south from south corner Fracture Type Type2 Type5 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMIKW) Page 3 of 6 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 309547 Project No.: 0711530 Date of Service: 01/03/2008 Report Date: 02/01/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in2) (Ibs) (psi) 3 1 01/10/2008 7 6.00 28.27 145,900 5,160 3 2 01/31/2008 28 6.00 28.27 174,800 6,180 3 3 01/31/2008 28 6.00 28.27 176,820 6,250 Average 6,220 3 4 02/28/2008 56 Contractor: Duke Construction, LP Concrete Supplier: Potter Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 MIXl rmllll RTIl F:l O' D D-" ~LJ ~~ llid ~ Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA Mi.< Design 1.0.: 7752PW Placement Date: 01/03/2008 Weather Conditions: Cloudy Time Sumpled: 01 :OOpm Temperature - Air: 410F Truck No: 120 Air Content: 5.1 % Overall Placement Location: Paving, building 1, south side Batch time: 1L:25pm Concrete: 480F Ticket No: 10020 Unit Weight (pcf): NA Measured Slump (inches) 5.0 Sample Location: 45' west from south corner Fracture Type Type2 Type5 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 5 of 6 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 307471 Project No.: 0711530 Date of Service: 12/06/2007 Report Date: 02/01/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Redi-Mix Plant: NA Specification Requirements Strength: 4,0"0 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: NA Placement Date: 12/06/2007 Weather Conditions: Clear Time Sampled: 08:30am Temperature - Air: 450F ".ruck No: NA Air Content: 5.2% Overall Placement Location: Paving, north and south approach and east approach on Dividend Drive Measured Slump (inches) 5.75 Batch time: Concrete: 660F Ticket No: NA Unit Weight (pcf): NA Sample Location: South approach on Beltline REPORT OF TESTS Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in2) (Ibs) (psi) 1 1 12/13/2007 7 6.00 28.27 107,380 3,800 2 01/03/2008 28 6.00 28.27 137,590 4,870 3 01/03/2008 28 6.00 28.27 138,260 4,890 Average 4,880 4 01/31/2008 56 6.00 28.27 160,430 5,670 0[j ~[g ~ 5J DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Remarks: Water added at site: 5 gallons Concrete Compressive Cylinder 6" x 12" Fracture Type Type2 Type3 Type2 Type2 Started: 07:15am Finished: 1 0:00am Technician: Jose Villanueva Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr Ryan Skelly 1-ec Duke Construction, LP Attn: Mr. Jason Sulzener 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering P-~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 1