AGENDA REQUEST FORM
CITY COUNCIL MEETING ...
May 8. 1990
.- ." 'ITEM laO ~. J.L.J1
i~
ITEM CAPTION:
A. Remove from me table me consideration of Drainage Improvemen't Options proposed .by
the Connell Development Co.. along the west side. of Connell Skaggs Addition (Woodside
Village) from Sandy Lake Road .to the southeast comer of Coppell High School where existing
culvert ends.
B. Consideration of Drainage Improvement Options propsed by the Connell Development Co..
along the we side of C ell Skaggs Addition (Woodside Village) from Sandy Lake Road
to the sou come .of ppell High School ,where existing cul~ert ends. ,.
SUBMITTED BY: cJ1atw'-. STAFI!' REP.: Shohre Daneshmand. Acting City Eng.
e Signature) ._.
OTHER REP.: Mark Connell/Connell Develop. Corp.
EVALUATION OF ITEM: DATE: April 27. 1990
Please see attached letter from Mr. Jim Kock with Pacheco Koch Consulting Engineers.
0im CG,~e) ~~
Ann Soo~h€tY\
(9l~ tfu~K\~
fH,QVl ~\tr
4-'50-4l4- \
Ob~-ll?4
qq\-4foOO
. ~~
otk~~ v~ z,srOO'
p~ ~vs'",ess
. / ~#
8~ ~~J
L1 'S i..b~
~ bQj V
~~.~ <t/
/~~'-/~~'
-AMT. . +- 1-:. . BUDGET ~
--_._..--.--...~. ...
FINANCIAL REVIEW BY: .'.
-...-- ---'_.' -..-..-...--.-
()ti,~
\.~ 8:o0~/.
--
~~
BUDGET AM.T.:
COMMENTS:
AMT. ESTIMATED:
." ..' . -' ~.
~~Q.
(6.jlttJ.. ~. 6:>>~'S" ~...
5-l(~.z...:~~sf~,O-.,r~~~
LEGAL REVIEW BY:
AGENDA, REQ. J'ORM
0588DS
...-
':';,;iJ~~t(~~~fj
"
f}
n
Manager's Comments
Drainage Improvement options Proposed by
Connell Development Co. for Woodside Village
We obtained new cost estimates for constructing the draina.ge
structure from the Skaggs property to the southeast corner of the
Coppell High School property. We asked for estimates based on the
"Blow Form" method suggested by Councilman Robertson. The
estimates exceed'the $345,000 allocated for this project because
we do not have the necessary construction easements to eliminate
all of the trench safety requirements. We are attempting too seeun'!
those easements at this time, and if we are successful, we will be
able to further reduce the cost estimates which we have received.
In regard to the escrow of the $345,000 by COlc1ell, if W~ are not:
able to approve this drainage project on Tuesday, we recommend that
Connell be asked to immediately comply with this requirement,
II
i!
---
~
I
I
I
I
"I ~~::;7~~:; \;~~~.
CO=-;:'=-I! :, '/ ... ~--
~!I(';~- - '; l'
,0,'-.:-1 _
<:::C:":.'"'Ji... ,. I
_..~ :: I
'-;T -
, 'r
. i ,~
.f)
, ,
. r A
--.1 i:-- ~;Cg, 'f,;i,;;,,_
,I.,
('t 1
t:
'. ,
.4 .: J .;.;
. .,
L ::j 1
t :1
li:1 I
i :1
1\
: :r' =:;:;:.:;::::) !:'.>.S'
j ; /-~;'-( r'J' "==:T
j ~.... -......... -.-.
; ;1
'! J
;:}' --
\ '\
'. .-,
\'\
! '" -- -----
_ ._.i p~i ~ ~ _._ _._ ~ ~ ~.~ =::~...
. . ::.: ~'.'~'. '7"
."J
".
t1
:::
u
<:
~
..J
<
C
>-
o
<(
tl
3
1.
I
'. .
. ..
r: j
!<
~-
1~
"
;:)
i
I
- -
c: ", 'DY L/;:.(c
"'.\ I
_.__J' :---. I '\ '....-
wooes: ::
~: :.'....::_L :::
30C=;-:E:
-
WILLO
- -
!:..!....:.2::
=':::::_7 ::
rn:~C~i..EY
J'
\ "
ROAD
I I,. !\':-
_ r-.., 'C"
J
_ _ J
I
z
o
,
.-
Z
W
o
0...
<!
l.-
I
o
<!
o
0::
PACHECO KOC:1:
Cc~~:a.c ~~
It'".: F-d. c;......:L! m \.ti}{ ~>:'t x'.
:.~ ~1:X 1U:l c::al ~~~l
~
'-:'.-'= .~":c - -;.--
:8 .'-8' .~ .~, . -
I I'~-"'- .----.-.-
: -- -
-,,'
____)~3i~~'i;T~ .EI~ _--'-~ ,..:76\' i'i;..., T I
I ----
,..". I
. 1. '"'7""_______~
-----
. .--.;,~
T
\/
T
PiCAL
. - -.
,','OODSIDE ViLLt.GE
D:::t,.!~\AGE 1f1.?~OVEI;'Elns
SECTiON
SECTION
~~,:?~::::j
10',5'
=.:x .:u:.-\~::.~
2: ::-::T
=:;'::=':.::.\:
- -...----
EY
...':"'<
~'~.
NO
A-A
I~
-It
I;
-\2
-
J
-.
,
i
I
I
o
o
PACHECO KOCH
Consulting Engineers
May 4, 1990
~K No. 1004-90.005
Ms. Shohre Daneshmnnd
City of Coppell
732 DeForest
Cappell, Texas 75019
R8: Woodside Village, Orainage Jrnproverrent Options
Dea r Ms. Daneshrrand:
Enclosed for your 'lse are proposals received from contractors to cond,. lGt ths
referenced drr.l.inage 11lprovements. These improvements l.\Ould be in th(~~orm of a
concrete culvert, either a conventional Texas State Depart.'TleI1t of. flighway!:" ~1Jld
Public Transportation box: culvert or a gunit~ "Airform" arch culvert. Tn?
limits of the improvements ~uld be from Sardy Lake Road to the ex:.stlng box
culvert at t'7illow Lane near the soutJler1.st corner of the High School tract
Bids Wf>xe received from Buckelew Construction Co., Tnc. to c..'Or:,,~n'c:t. t'1f
conventional box: culvert, and from Dallas Concrete, tnc. to CV" '.~;':r'1~:t ; '.f:
J\irform culvert. Please note that Dallas Concrete also bid the oonst :'lc:i: i: ~:
t."e conve.'1tional culvert at the same cost as the 1;irform C'..llvert.
The bids received are enclosed for inclusion in the City Council paC~~!C5.
1?lease note t:'-lat the total iieveloorrent costs for the culvi~rt~ ha<7: ~;t~,1
calculated, by adcting to t.~e construction costs, the costs for p::evk\'s ,).;:J
anticipate<..'l. eng ineering and geotechnical services r.l.sosociated with t.he jE3~'J[' c::
the culvert, either paid or to be mid, bv Connell Developm3I1t Co.
"Please review the enclosed infot"lmtion arrl contact Ire if JOU :-, .'.: j any
additional information.
Sincerely,
p--..--.........
~ ~. t;h'~~)
cc: Mr. Mark Connell, Connell Devclo~ment Co,
1004-06
1012 Park Central VII i 12750 Merit Drive I Dallas. Texas 75251 / (214) 450.4141
:'11
! I
()
o
ITEMIZED UNIT PRICE BID FORM
Buckelew Construction Co., Inc.
[]I
~
o
Connell Skaggs Addition ,
Connell Development Company
April 29, 1988
Itemized Bid Prop<'snl
Page -L of.1..
BOX CULVERT AND STORM DRAINAGE IMPROVEMENTS
Item No.
~ Unit Description &. Unit Price in Words
Unit Price
In Fig'ure~ Amount.
3
1232
LF Trench Safety Progra.m, ~ijR~
~~R~~~~~~K~~~~~~"~x
~x~:ox>OdX1erxci~:eKing<~~X
kR'kJtJa~~~R~~~~*R<<}(X)OOtXIlRDcn
nineteen dollars
and ,. no cents
per linear foot, complete in place.
$
1~ 00 $ 23,40B.00
TOTAL DOXCULVERT AND STORM DRAINAGE
IMPROVEMENTS $346,4Q8:00
3354b/O 127
1.11
i I
n
Qid From:
Buckelew Construction Co., Inc.
Connell Skaggs Addition
Connell Development Company
April 29, 1988
Item izcd Die IJroposal
Pnge _L or.1.-
DOX CULVERT AND STORM DRAINAGE IMPROVEMlmTS
1
il!Y.
1232
Unit
Description &: Unit Price in Words
Unit Price
In Figures
Am oun t
____....4
Item No.
LF
10'xB' Single Box Culvert
(Cnst-in-Place or Precnst),
including, removal and replaccmnt
of fences, clearingT removal of
required trees, excavation, backfill,
grading as indicated, compacted
stone base, connection to existing
box culvert (including removal and
off-site disposal of headwall and
slope protection if required), construc-
tion of 4-14' modified curb inlets
and final clean-up.
The following items me to bc included
in the linear foot price for the box
culvert; construction of a drop inlet,
installation of 35 L.F. of 3D-inch
reinforced concrete pipe - Class III,
including horizontal bends, connections
to existing R.C.P .'s and the box culvert,
excavation, embedment, backfill and
final clean-up.
thin l-lImclrpcl fi fty dollars
and no cents
per linear foot, complete in place.
$ 25090 $_3_~..:~~:. co
2
1
15 Transition Ilt upstream end of box culvert
including gnbion baskets nnd rock, Type "A"
headwall, metal benm guard fence, terminal
sections and posts, removal of required trees,
removal and replacement of fences, excavation,
backfill, and final clean-up.
fi ft~~n thousand dollars
and no cents
lump sum, complete in place.
$ ~)OO. C$1-1.?......Q:Q9. 00
3354b/O 127
II
,JI
~
\.~[ I
CONNELL SKAGGS ADDITION
BOX CULVERT BID ANALYSIS
MAY 4,1990
WORK ITEM
o
STANDARD BOX
AIR FORM
BOX
BUCKELEW
CONSTRUCTION
DALLAS
CONCRETE
DALLAS
CONCRE:TE
----------------------------------------------------------------------
BOX CULVERT, INLETS, &
FENCE RELOCATION
UPSTREAM TRANSITION
TRENCH SAFETY
SUBTOTAL
ENGINEERING & GEOTECHNICAL
TESTING 1.5%
STAKING
INSPECTION 1.5%
TOT A L
C 0 S T
DEDUCT BONDS
COST WITHOUT BONDS
TIME TO COMPLETE
~I
$308,000
$15,000
$308,000
$308,000
$17,000
$17,0)0
$23,408
$45,000
$45,001)
----------------------------------------.--
$346,408 $370,000 $370,00('
$28,000 $28,000 $29,on
$5,196 $5,550 $5,5:>0
$1,500 $1,500 $1. : CO
$5,196 $5,550 $5. r.Se
------------------------------------------
$386,300
$410,600
$411,00')
==============;==============:=========:~=
($20,000)
($20,000)
($20,OUr))
-----------------------------------...----- -
$366,300
$390,600
$391,6')L'
===================================~~~=~~-
4 MONTHS
2 MONTHS
2 MON'~' E-l;?
r I
. '
r)
Hay 3, 1990
Mr. James A. Koch, Jr., P.F.
PACHECO KOCH
Consulting Engineers
1012 Park Central VII
12750 Merit Drive
Dallas, Texas 75251
RE: BOX CULVERT & STORM DRAINAGE IHPROVEHENTS
CONNELL SKAGGS ADDITION
COPPELL, TEXAS
Dear Hr. Koch:
Attached is our 3 page proposal to complete the drainage project. We
made several changes to the original plan, as follows:
1. From Station 23+28.06 to approximately Station 3~~lC we plan to
move the culvert to the east side of the drainage easement.
2. The box culvert will be either as designed utilizing 4000 psi
shotcrete walls to 8' in lieu of class 4 concrete, or 10' wide
box with 4000 psi shotcrete walls to 4' with a ~' arch using
4000 psi shotcrete.
3. The transition at Sandy Lake is to be an extension of the two
36" RCP into the box culvert with a 8" shotcrete wall to seal
the end of the \,,1a11 and the pipe, thus eliminating gabions,
fencing, guardrails, headwalls, and slope protection. The
existing ditch could be graded to an inlet at the beginning
of the box culvert.
Engineering calculations will be submitted if we are successful in
obtaining a contract.
Should you desire, the total project can be done for $350,000 on an
unbonded basis. If so, I believe that terms agreeable to both partic3
can be worked out to assure payment of materialmen and subcontractors.
Cordially,
.~'-'-'I
,-./ I ,I
." " ,
./ '.'" ..' I~. . .:~, (_ ". '.
I
Guy R. ~Jel1s
President
GRvl: sts
ATTACHNENT
in
1 i
tir'
()
Connell Skaggs Addition
Connell Development Company
April 29, 1988
Itemized Bid Proposal
Page -L of ~
BOX CULVERT AND STORM DRAINAGE IMPROVEMENTS
Item No.
~
Unit Description &. Unit Price in Words
Unit Price
In Figures Amount
1
1232
LF 10':<8' Single Box Culvert
(Cast-in-Place or Precast),
including, removal and replacemnt
of fences, clearing, removal of
required trees, excavation, backfill,
grading as indicated, compacted
stone base, connection to existing
box culvert (including removal and
off-site disposal of headwall and
slope protection if required), construc-
tion of 4-14' modified curb inlets
and final clean-up.
The following items are to be included
in the linear foot price for the box
culvert; construction of a drop inlet,
installation of 35 L.F. of 30-inch
reinforced concrete pipe - Class III,
including horizontal bends, connections
to existing H..C.P.'s and the box culvert,
excavation, embedment, backfill and
final clean-up.
Tt.'o hundred fifty dollars
and no cents
per linear foot, complete in place.
$ _-1.5ll~Q..O $~l 08 g.Q .rL .:1'"
2
LS Transition at upstream end of box culvert
. including gabion baskets and f'ock, Type "An
headwall, metal beam guard fence, terminal
sections and posts, removal of required trees,
removal and replacement of fences, excavation,
backfill, and final clean-up.
Seventeen thousand dollars
and no cents
lump sum, complete in place.
$-17000. 00$_.1] Oq}CO
3354b/0127
in
II
{'
r)
Connell Skaggs Addition
Connell Development Company
April 29, 1988
Itemized Bid Proposal
Page..!.. of l
BOX CULVERT AND STORM DRAINAGE IMPROVEMENTS
Item No.
illY. Unit Description &. Unit Price in Words
Unit Price
In Fi~ures Arr.~nt
3
1232
LF Trench Safety Program, consisting of
cantilvevered sheet pile wall and
well point or other dewatering system
for the eastern side of the construction.
Fortv-five thousand dollars
and " no cents
per linear foot, complete in place.
$ 4500C.0C'
TOTAL BOX CULVERT AND STORM DRAINAGE
. IMPROVEMENTS $1l\J{:0iJ..:QO
AS MODIFIED BY OUR LETTER
DALLAS COKCRETE, INC.
3354b/0i27
,Ii
I:
f}
n
~
Connell Skaggs Addition
Connell Development Company
April 29, 1988
Itemized Bid Proposa!
Page. 3 _ of _!_
BOX CULVERT AND STORM DRAINAGE IMPROVEMENTS
Alternate Trench Safety Unit Price
Item No.
Unit Descriotion & Unit Price in Words
~
4
LF Trench Safety Program. Double
sheet pile (braced) wall and well
point dewatering system for the west
side of the construction.
dollars and
cents per
linear foot, complete in place.
Unit Price
In Fig-ures Amount
$
Item 4 is not to be included in the base bid. The itemized unit price fOl' this
item is to be utilized only if the work described in item 4 is reqJir~d as
outlined in the Trench Safety Engineering Report. If item 4 is required, the
quantity to calculate payment for item 3 will be reduced by an amount equal
to the pay quantity for item 4.
NOTE:
3354b/O 127
ill
II
f
..
(t
rl
../
~
SALLI:\GER. :\ICHOLS. JACKSOX,
KIRK & DILLARD
~Oe(Rr '.. :'1;,,\'&,;:;-0 ,.I;::;
,.. :..OUIS NI;:"'C'..S
or COl,;"'S::~
(Formerly Saner. Jack. Sallinger & ~ichols)
Attorneys & Counselors at Law
1800 Lincoln Plaza
500 K. Akard
Dallas. Texas i5201
(214) 954.3333
Facsimile (214) 954-3334
<~ce';;':IT o. I-'C~P""Ll".
~06LRT t, r.U..G;:=
Pf;TCQ G. SMITH
,J?HN PI[i=iC:: C::;OP:~IN
O"VIO to.( Ut:~:H~AI~
.,jO...N;o ROtH"" HI
ar;uCC ~" STOCKA;:;'~
AI-rOe:e S......:.l..;~c:l;
~"'W,;C~Ct W J...Cl'.SO....
'rI,"" ,(1~jI
~'je!:q~ ~ O':.......:;~ II:
May 1, 1990
Mr. Alan Ratliff, City Manager
City of Coppell
P.O. Box 478
Coppell, Texas 75019
RE: OUR FILE NO: 26
Comnnell Drainage Agreement
Dear i\1 r. Ratliff:
At the last City Council meeting a question was raised concerning the notat>)].
"waived" which was next to Section 4 of the copy of the Connell Agreement include(1
in the packett (see page 3 of Exhibit "A". You have ask me to search my file f.)r an
answer to the question.
It appears from material found in the council packet of June 23, 1987 (See
Exhibit B) that Connell sent a letter to Wayne Ginn on May 20, 1987 indicating that
they would be immediately constructing the box culve,rt at the same time the higl,
school constructed the culvert on the school propmty. In this letter they requestec
that they not be required to put up the escrow ot letter of credit because of ~heir
intent to start construction immediately. Ginn's letter of June 12, 1987 is in respollfl~
to Connell's letter and indicat.es that "the box culvert issue has been resolved." [I
appears that their Final Plat on Lots I, 2 end 3 were approved "with stipulatiori; (Plea~ ~
see attached letter listing the stipulations)". (see Staff Report in Exhibit B)
Exhibit C is a letter from Connell which explains why they did not follow through
with construction simultaneously with the school construction,.
Since they did not construct the box culvert at. the same time the s~hool
constructed it's section, Connell's oblige.tion to escrow the funds 01' p.~ovide .1 ] ,)tt~~
of credit was restored and remains a valid obligation.
SALLINGER, NICHOLS, JAC'::\SON
KIRK 0: DILLARD
/7 /.1
By~ffilc'~~f-
- ~awrence w. Jaekson
, I
cc:
Mr. Steve Goram, Director of Public Works
City of Coppell
P.O. Box 478
\
n
,
I: