Loading...
Duke Lesley 1A-LR080022 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Project: Point West VI Coppell, Texas Services: Reinforcing Steel Inspection ~ Report of Reinforcing Steel Inspection Report No.: 311207 Project No.: 0713408 Date of Service: 01/18/2008 Report Date: 01/22/2008 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Inspection Locations ald Items Inspected: Paving on side of building, pour 4, inner pour, south and north side of building. Nem s Inspected: Conforming Non Items Inspected: Conforming Non Item sins pected: Conforming Non Co nfo rming Conforming Conforming Placing Drawings Bar Length Co lumn Ties Pro periy Approved x and Shape x Tied and Spaced NA Bar Size x Proper B ar Placement x Stirrup Spacing NA Bar Grade x Pro perly Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Proper B ar Suppa rts x Corner Bars NA NumberofBars x ProperCover x Mechanical Splices NA Discrepancies I Comments: 1. Remove excess dry concrete from placement area. 2. Tie down steel. 3. Missing dowels. 4. Add chairs. The discrepancies noted above were corrected at the time of inspection. fi(~ ~/~ I': 8 Technician: Jose Villanueva Started: 02:00pm Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Emmit Coots (1-ec copy) 1-cc Duke Construction, LP Alln: Mr. Emmit Coots 1-cc City of Coppell Alln: Mr. Lee Stone 1-cc City of Coppell Alln: Mr. Larry Davis 1-cc Pacheco Koch Consulting Engineers Alln: Mr. Jack Evans Finished: 04:45pm Rone Engineering P-~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 1