Gateway BP(3.1)-CS080213
J,:,:02p
Debbie Ingram
972-462-5199
p.1
'Zll~ \'" '/~
THE-CITY.OF
COPPELL
>I-~; .
~ \)
e q
x ~ l) . 1 ~
MEMORANDUM
&11"'1 t; " c;~ 1vu' ft \..
FVlI' ~
~:~U~
Fy: ;LJ'-J-5:LO-04f3
TO: Larry Davis, Engineering
FROM: Danny Hightower, Public Works
DATE: February 13,2008
REF: Gateway Business Park #3, Lots 1 & 2, Block A
I. First main line valve needs to be reset
2. Mark ML V in blue on curb at first valve
3. Need extension on first valve
4. First FH valve needs to work
5. Clean all meter cans to bypass
6. Paint meter can lids blue
7. Mark ML V in blue on curb at vault
8. Mark DOM and IRR on curb at N.E. of building
9. Paint vault lid blue
10. Need DC paperwork (Serial #, Meter #) turned into City for billing
11. Need paperwork on all DC for Dom, Irr, and Vaults
12. Mark ML V in blue on curb and paint lids blue
13. Clean out second FH valve stack (next to second vault)
14. Mark FLV on valve to buildings
15. Mark CO in red on curb at sewer cleanouts and grade inside CO
'&. i1~ - Ilvi Ji ~
),' ''1- IJ,,, III t/