Gateway BP(3.1)-CS080213 (2)
Feb 13 08 1111 a
Debbie Ingram
972-462-5199
p,1
~ ,,"'1 )t", ~
C'y, 1tJ; c.Il1w.ill~,r
l\tIEMORANDUM r ~ L
FROM THE r;tl JI~
DEPARTMENT OF PUBLIC WORKS
To:
Larry Davis, Construction Inspector Engineering
Frank Garza, Streets Division Public Works
February 13, 2008
\VaIk-thru Gatew8)' Business Park 113, Lots 1 & 2 Blk A 2/U/08
From:
Date:
RE:
P A VII\'"G
1. North entrance has cracks next to street. Need to rout & seal and reseal next to
street.
2. South entrance needs to be cleaned out & sealed next to street. ~eed to rout &
seal cracks next to stamped concrete. Chip slag off of entrance ne1.1 to stamped
concrete.
DRAINAGE
1. Head wall drain - need to clean mud out of flume. Need to hydromulch to
prevent erosion.
z, r1,13e1v1/
~, R>-6';//7 7
CITY ()F C()PPELL PUBLIC WORKS DEPARTMENT