Loading...
Gateway BP(3.1)-CS080213 (2) Feb 13 08 1111 a Debbie Ingram 972-462-5199 p,1 ~ ,,"'1 )t", ~ C'y, 1tJ; c.Il1w.ill~,r l\tIEMORANDUM r ~ L FROM THE r;tl JI~ DEPARTMENT OF PUBLIC WORKS To: Larry Davis, Construction Inspector Engineering Frank Garza, Streets Division Public Works February 13, 2008 \VaIk-thru Gatew8)' Business Park 113, Lots 1 & 2 Blk A 2/U/08 From: Date: RE: P A VII\'"G 1. North entrance has cracks next to street. Need to rout & seal and reseal next to street. 2. South entrance needs to be cleaned out & sealed next to street. ~eed to rout & seal cracks next to stamped concrete. Chip slag off of entrance ne1.1 to stamped concrete. DRAINAGE 1. Head wall drain - need to clean mud out of flume. Need to hydromulch to prevent erosion. z, r1,13e1v1/ ~, R>-6';//7 7 CITY ()F C()PPELL PUBLIC WORKS DEPARTMENT