Loading...
Alexander Ct-LR080129 (2) I~A TESTING.INe. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 DAILY FIELD REPORT TESTED FOR: Mira Mar Development Corporation Colleyville, Texas DATE: 01/29/08 PROJECT: ~ Alexander Court /" Coppell, Texas~ OUR REPORT NO.: 070021-32 TECHNICIAN: D.J. WEATHER: CLEAR TEMPERATURE RANGE: 45 TO 50 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED SITE TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. WHILE ON SITE THE TECHNICIAN OBTAINED 2 SOIL SAMPLES FOR LABORATORY PROCTOR ANALYSIS. THE SAMPLES WERE OBTAINED FROM THE FOLLOWING LOCATIONS: 1.) OLYMPIA LANE AT CENTERLINE ADJACENT TO PAD 10 2.) KNIGHT WAY AT CENTERLINE ADJACENT TO PAD 2 LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A SEPARATE REPORT AT THE COMPLETION OF THE SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. Respectfully Submitted, ~~ Tom Ellis ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of Alpha. The use of our name and test results must receive our written approval Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens Geotechnical Engineering Construction Materials Testing III Environmental Engineering fb Consulting ~\A TESDNG,INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 C>< MECHANICAL STABiliZATION I MODIFICATION FINAL MIX DATE: 01/29/08 TESTED FOR: MIRA MAR DEVELOPMENT CORPORAT COLLEYVILLE TEXAS PROJECT: OUR REPORT NO.: 070021-35 AREA OF WORK: OLYMPIA LANE AND KNIGHTS WAY DATE CEMENT 0 L1ME[K] ft/~ INITIALLY APPLIED 01/25/08 DATE OF FINAL MIXING 01/29/08 TEST LOCATION: 1. OLYMPIA LANE AT CENTERLINE ADJACENT TO PAD 10 2. OLYMPIA LANE AT CENTERLINE ADJACENT TO PAD 18 3. KNIGHTS WAY AT CENTERLINE ADJACENT TO PAD 2 4. OLYMPIA LANE AT CENTERLINE ADJACENT TO PAD 26 5. RETEST FOR #4 OF THIS REPORT % PASSING 1 3/4" SIEVE 100% 100% 100% 100% 100% % PASSING #4 SIEVE 66% 65% 63% 57% 60% REMARKS: z,J~J-e~ e.. Respectfully Submitted, ~# Tom Ellis ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of Alpha. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of !he qualities of apparenUy identical or similar specimens. Geotechnical Engineering fb Construction Materials Testing fb Environmental Engineering fO Consulting