Loading...
DR9101-CS 910913· ,l~azo. Starek & 'l:ang. Inc. Engintx, rs · Planners September 13, 1991 Mr. Larry Davis city of Coppell Post office Box 478 Coppell, Texas 75019 Re: Oak Trail Drainage Improvements Monthly Estimate No. 2 Dear Mr. Davis: As we discussed, we have prepared a revised Monthly Estimate No. 2 for the Oak Trail Drainage Improvements. This was required because of the uncertainty of thequality of the asphalt work. The revised estimate includes payment for only 25 percent of the asphalt pavement and crushed stone base. If you concur with this estimate, please sign one copy and send with a check for $30,622.86 to M-S Utilities. Sincerely, ~lenn Hitt, P.E. Vice President GH/smh 89256.20 Encl. cc: Ms. Shohre Daneshmand, P.E. Mr. Mike Sperling 330 Union Station Dallas, Texas 75202-4802 214/748-6740 Metro 214/263-5428 Fax 214/748-7037