DR9101-CS 910913· ,l~azo. Starek & 'l:ang. Inc.
Engintx, rs · Planners
September 13, 1991
Mr. Larry Davis
city of Coppell
Post office Box 478
Coppell, Texas 75019
Re: Oak Trail Drainage Improvements
Monthly Estimate No. 2
Dear Mr. Davis:
As we discussed, we have prepared a revised Monthly
Estimate No. 2 for the Oak Trail Drainage Improvements.
This was required because of the uncertainty of thequality
of the asphalt work. The revised estimate includes payment
for only 25 percent of the asphalt pavement and crushed
stone base.
If you concur with this estimate, please sign one copy and
send with a check for $30,622.86 to M-S Utilities.
Sincerely,
~lenn Hitt, P.E.
Vice President
GH/smh
89256.20
Encl.
cc: Ms. Shohre Daneshmand, P.E.
Mr. Mike Sperling
330 Union Station
Dallas, Texas 75202-4802
214/748-6740 Metro 214/263-5428
Fax 214/748-7037