Loading...
Park West CC(15.1)-LR071231 REED EnGinEERinG GEOTECHNICAL AND G R 0 LJ P ENVIRONMENTAL CONSULTANTS REPORT OF FIELD GRADATION TESTS BMC West Addition 425 Airline Drive Coppell, Texas REPORTED TO. Me West Corporation 425 Airline Drive, Suite 200 Coppell, Texas 75019 A TTN: Mr. Danny McQuary CONTRACTOR: D/B Constructors, Inc. Sieve Size 1-3/4" Percent Passin 100 Date 12-03-07 Location Paving: 30'S, 130'W from S.E. building corner Paving: 10'N, 80'E from S.E. building corner Paving: 200'N, 80'E from S.E. building corner Paving: 200'N, 40'E from S.E. building corner Paving: 20'N, 20'E from S.E. building corner Paving: 30'S, 130'W from S.E. building corner Paving: 200'N, 80'E from S.E. building corner Paving: 200'N, 40'E from S.E. building corner Paving: 20'N, 20'E from S.E. building corner Paving: 5'N, 40'W from N.W. building corner Paving: 50'S, 1 O'W from N.W. building corner Paving: 100'S, 20'W from N.W. building corner Paving: 160'S, 20'E from N.W. building corner Paving: 175'S, 75'E from N.W. buildin corner 12-04-07 REPORT NO. 12 REPORT DATE: 12-31-07 REG PROJECT NO. 14935 TECHNICIAN: D. Fortenberry PAGE: 1 of 1 Percent Passin 60 Passing 1-3/4" Sieve 100 100 100 100 100 100 100 100 100 100 100 100 100 100 Passing #4 Sieve 42 (a) 67 59 (b) 54 (c) 54 (d) 61 (A) 62 (B) 61 (C) 61 (D) 63 62 60 60 Comments: Where tested, materials were in compliance with project specifications, unless noted otherwise. Failing test noted in lower case letter, passing retest noted in corresponding upper case letter. E-Mail Distribution: (1) BMC West Corporation/ Mr. Danny McQuary (1) Pross Design Group/ Mr. Charles Miller (1) D/B Constructors, Inc./ Mr. Michael Smith (1) BMC West Corporation/ Mr. Mike Maring (1) Hunt & Joiner/Mr. Steve Dial Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Icon Consulting Engineers/ Mr. David Gregory (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone 2424 STUTZ DR . SUITE 400 . DALL.AS TX 75235 . ;El [214] 3505600 . fAX [214] 3500019