Park West CC(15.1)-LR071231
REED EnGinEERinG
GEOTECHNICAL AND G R 0 LJ P
ENVIRONMENTAL CONSULTANTS
REPORT OF FIELD GRADATION TESTS
BMC West Addition
425 Airline Drive
Coppell, Texas
REPORTED TO. Me West Corporation
425 Airline Drive, Suite 200
Coppell, Texas 75019
A TTN: Mr. Danny McQuary
CONTRACTOR: D/B Constructors, Inc.
Sieve Size
1-3/4"
Percent Passin
100
Date
12-03-07
Location
Paving: 30'S, 130'W from S.E. building corner
Paving: 10'N, 80'E from S.E. building corner
Paving: 200'N, 80'E from S.E. building corner
Paving: 200'N, 40'E from S.E. building corner
Paving: 20'N, 20'E from S.E. building corner
Paving: 30'S, 130'W from S.E. building corner
Paving: 200'N, 80'E from S.E. building corner
Paving: 200'N, 40'E from S.E. building corner
Paving: 20'N, 20'E from S.E. building corner
Paving: 5'N, 40'W from N.W. building corner
Paving: 50'S, 1 O'W from N.W. building corner
Paving: 100'S, 20'W from N.W. building corner
Paving: 160'S, 20'E from N.W. building corner
Paving: 175'S, 75'E from N.W. buildin corner
12-04-07
REPORT NO. 12
REPORT DATE: 12-31-07
REG PROJECT NO. 14935
TECHNICIAN: D. Fortenberry
PAGE: 1 of 1
Percent Passin
60
Passing
1-3/4" Sieve
100
100
100
100
100
100
100
100
100
100
100
100
100
100
Passing
#4 Sieve
42 (a)
67
59 (b)
54 (c)
54 (d)
61 (A)
62 (B)
61 (C)
61 (D)
63
62
60
60
Comments: Where tested, materials were in compliance with project specifications, unless
noted otherwise. Failing test noted in lower case letter, passing retest noted in
corresponding upper case letter.
E-Mail
Distribution: (1) BMC West Corporation/
Mr. Danny McQuary
(1) Pross Design Group/
Mr. Charles Miller
(1) D/B Constructors, Inc./
Mr. Michael Smith
(1) BMC West Corporation/
Mr. Mike Maring
(1) Hunt & Joiner/Mr. Steve Dial
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Mail
Distribution: (1) Icon Consulting Engineers/
Mr. David Gregory
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
2424 STUTZ DR . SUITE 400 . DALL.AS TX 75235 . ;El [214] 3505600 . fAX [214] 3500019