DR9101-CS 910708 M- S UTILITIES
Route 5, Box 91
Rockwell, Texas 75087
Ph. 214-412-3963 * Fax 214-475-1506
July 1, 1991
Paul Tucker
DeShazo Stareck & Tang,
330 Union Station
Dallas, TX 75202
Inc.
RE: CHANGE REQUEST #2 OAK TRAIL DRAINAGE IMPROVEMENTS
SUBJECT: LOWER 6" FIRE HYDRANT LEAD AT STATION 0+50
6" 45 degree cast
Concrete blocking
Labor
Subtotal
TOTAL
iron bends
4 ea./@159.00
6 cy./@ 50.00
16 hr./@lSO.O0
Profit @10%
636.0O
300.00
2~400.00
3,336.00
333.60
Submitted By: Mike Sperling
Engineering
July 8, 1991
Ms. Shohre Daneshmand, P.E.
City of Coppell
Post office Box 478
Coppell, Texas 75019
b.ohazo, Starek & Tang, Inc.
Engineers · Planners
Re: Oak Trail Drainage Project
Dear Ms. Danesnmand: ,tqq/_ .
This is to inform you of .the status o.f th~Oak Trall
Drainage Project. As we dxscussed, on _J~--_.2., .1991, the
Contractor, M-S Utilities, discovered a conflict between an
existing 6-inch fire hydrant lead and the grade of the
proposed storm sewer. In addition, there is potentially a
point of conflict with a second fire hydrant lead. M-S
Utilities submitted a proposal (copy enclosed) of $3,669.60
to lower the water line at the known point of conflict.
It is our recommendation that, if available, City forces be
utilized to do this work. We feel that this would be more
economical, especially if a second conflict exists. M-S
Utilities has notified us by letter that they will be
pulling off the job on July 9, 1991, pending a decision by
the city.
We await your direction on this issue. If you need
additional information on this matter, please let us know.
Sincerely,
Vice President
GH/slatl
89256.20
Eric1.
330 Union Station
Dallas, Texas 75202-4802
214/748-6740 Metro 214/263-5428
Fax 214/748-7037
_~AN i0 "-~5 12.='=' DE'SHAD FAREKSTAHG, THC. P.2-
D~Shazo, Slarek & 'l~ng, Inc,
En~meer~ -
July 8, 1991
pressed sto~ sewer. In ~ddition, there is ~tentlally a
~int of conflict with a second fire hydrant lead.
Utilities submitted a proposal (copy enclosed) of $3,669.60
to lower the water line at the known point of conflict.
It is our recommendation that, if available, City forces~
utilized to do this work. We feel that this would be more
economical, especially if a second conflict exists. M-S
Utilities has notified uS by letter that they will be
pulling off the job on July 9, 1991, pending a decision by
the city.
we await your direction on this issue. If you need
additional information on this matter, please let us know.
Sincerely,
Vice President
,GH/smh
~89256.20
Encl.