Loading...
DR9101-CS 910619June 19, 1991 Mr. Mike Sperling M-S Utilities Route 5, Box 91 Rockwa11, Texas 75087 De~haz,. Starek & Tang, Inc. Engineers · Planners Re: Oak Trail Drainage Improvements Coppe11, Texas Dear Mr. Sperling: In accordance with the executed contract documents on the referenced project, this is the Notice to Proceed. You are hereby requested to proceed with construction on this project on June 24, 1991. The allowable construction time is sixty (60) calendar days. Therefore, the date of completion is August 22, 1991. Please contact Carol Knewitz at 650-1200 (work) to arrange a meeting to discuss any questions about the construction process and its possible impact on her property. Distribute copies of the enclosed flyer announcing this project to area residences 48 hours prior to construction as discussed in the preconstruction meeting. If you have any questions, please call me at 748-6740. Sincerely, Paul A. Tucker Engineering Associate PAT/smh 89256.20 Encl. cc: /Mr. Larry Davis 330 Union Station Dallas. Texas 7~202-4802 214/748-6740 Metro 214/263-5428 Fax 214/748-7037