Loading...
Duke Lesley-CS080221 THE.CiTY.OF - corrELL February 21, 2008 >. ~;;:..-.\:.i~t" ~\l:' (" ,l ,,-Yt. (;:.-:-; ,',,#.r:c J,,~b ;~ .._-...~. .t:~. .<t,'l' -.\~ .'~'jfi..p.~.'.~'" . c.,-~-,. <;'. r\ V'/":.7-~~;> --r- /' ~""~"'<>:;:~'-' .\);:...r-...: ,'(;\;,~~"" () I::: ~~..~.;.._., _ .,.;.-- :~4Pk. ~ Q --r ~" "......... II 1\ 5 \ Alex Bennett, P.E. Duke Realty Corporation 14241 N. Dallas Pkwy., Suite 1000 Dallas, TX 75254 RE: Duke Lesley Addition, Infrastructure (Dividend Drive and Point West Boulevard) Final Acceptance Letter Dear Mr. Bennett: Representatives of the City of Coppell have confirmed a final inspection of paving, drainage and utilities for the referenced project. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. A Final Acceptance letter for the traffic signal portion of this project will be forthcoming at a later date, once all outstanding issues have been addressed. You may notify the MS4 (City of Coppell) at any time during the two-year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a Notice of Termination (NOT) to discontinue coverage under the SWPPP permit. A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year bond period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks for your cooperation. {L~- L r Davis C nstruction I spector Office Phone: (972) 304-3684 Fax: (972) 304-3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal Keith Flowers, Duke Construction, Fax: 972/361-6800 255 PARKWAY * P_D BOX 9478 * COPPELL TX 75019 * TEL 972/4G2 0022 * FAX 972/304 3673 02/20/2008 16:04 FAX ~ 0021002 DRAFT February 20,2008 Al.ex Bennett, P.E. Duke Realty Corporation li2~1 N. Dallas Pkwy., Suite 1000 011ffis, TX 75254 RE: D1:I~ Le~)t)'> Puiul WI:';sl VfI, LOot 2 Dt....",k A Provisional Letter of Acceptance USfJ!::i I~ ~nt-Vc:..1'V<< Dear Mr. Bennett: Representatives of the City of Coppell are issuing a Provisional Letter of Acceptance for the referenced project with the following conditions: A final acceptance letter will be issued when all conditions have-been met. Il1stallation of ILNS signs on the Belt Line RoadlDividend Road traffic signal. I I.. . ~ ~.J InStatlati()n of Clary battery backup on the Belt Line Road/Dividend Road traffic signal. L d' ~ V'""" , Affidavit ofpa.yment for Durable Specialties. ~~r1 ~,. J~ ~ orl I. ft"1 l~ttr . L 2. .., .J. The two-year maintenance bonds and as-built drawings have been received from the contractor. on the bonds will be two years from t."1e date of the final acceptance letter. P..,i~ Vi' . You may notify the MS4 (City of Coppell) at any time during the two~yeBr maintenance period if stabi1i7..a.tion of the site per the SWPPP pennit can be demonstrated. If so, complete and submit aN otice of Termination (NOT) to discontinue coverage under the SWPPP permit. A follow.up inspection of the facilities will be conducted prior to the lapse of the two-year bond period. If any punch list items are ooted at that time, you will be contacted to make repairs. Thanks for your cooperation. Sin~e]y, Larry Davis Construction Inspector Office Phone: (972) 304-3684 Fa.,',\:: (972) 304-3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal Keith Flowers, Duke Construction, Fax: 972/361-6800 02/20/2008 16:04 FAX ~ 001/002 'fHE.C;ITY.OF - COFFELL P.O. BOle 9476 255 ParkwaY Blvd Coppell, TX 75019 Pnone: (972)304-3679 Fax: (972) 304.3570 -'\ 5 ~'. ~ Alex Bennett ENGINEERING DEPARTMENT E4X COVER SHEET fi>~ ...EIen1'r Larry Davis Fax: 972/361-6800 Date~ 212012008 Phor\4il: Pages: 2 (including cover sheet) R.~ cc: Keith Marvin o Urgont X For Review x Please Commeltt 0 Please Reply o As Requested .Comments: Please forward any comments or changes you may have or call If you have any questions, 972/304-3679 Thank you. IF YOU DO NOT RECliIVE ALL OF THE PAGES PLEASE CALL (972) 304~3679 "City q[CoppelI Engineering- E:<cellence ~I Design"