Loading...
Duke Lesley 1A-LR080130 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311316 Project No.: 0713408 Date of Service: 01/21/2008 Report Date: 01/30/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Sup'1lier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753 Placement Date: 01/21/2008 Weather Conditions: Cloudy Time Sampled: 03:30am Temperature - Air: 440F Truck No: 126 Air Content: 4.3% Overall Placement Location: Paving parking lot north side of building 6 Batch time: 03: 19am Concrete: 530F Ticket No: 18716 Unit Weight (pcf): NA Measured Slump (inches) 5.0 Sample Location: 900' west from northeast corner of building 6, sample taken from pump REPORT OF TESTS Cylinder Marked Date Age Set No. Tested (days) 1 1 01/28/2008 7 1 2 02/18/2008 28 1 3 02/18/2008 28 4 03/17/2008 56 Diameter (in) 6.00 ~r3 ~~ rnJ E] DO D Type 1 Type 2 Type 3 Type 4 Type 5 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 135,000 Compressive Strength (psi) 4,770 Fracture Type Type2 Area (in') 28.27 Type 6 LIMITATIONS: The test resu~s presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 1 of 9 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Report of Concrete Compressive Strength Test Report No.: 311316 Project No.: 0713408 Date of Service: 01/21/2008 Report Date: 01/30/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Corsrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753 Placement Date: 01/21/2008 Weather Conditions: Cloudy Time Sampled: 04:00am Temperature - Air: 430F Truck No: 103 Air Content: 4.5% Overall Placement Location: Paving parking lot north side of building 6 Batch time: 03:51 am Concrete: 520F Ticket No: 18722 Unit Weight (pcf): NA Measured Slump (inches) 5.0 Sample Location: 865' west from northeast corner of building 6, sample taken from pump REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 2 1 01/28/2008 7 6.00 28.27 134,920 4,770 Type5 2 2 02/18/2008 28 2 3 02/18/2008 28 2 4 03/17/2008 56 0~ [1]~ Kill EJ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 2 of 9 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311316 Project No.: 0713408 Date of Service: 01/21/2008 Report Date: 01/30/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7753 Placement D"\te: 01/21/2008 Weather Conditions: Cloudy Time Sampled: 04:46am Temperature - Air: 430F Truck No: 126 Air Content: 4.3% Overall Placement Location: Paving parking lot north side of building 6 Batch time: 04:30am Concrete: 530F Ticket No: 18731 Unit Weight (pcf): NA Measured Slump (inches) 5.0 Sample Location: 835' west from northeast corner of building 6, sample taken from pump Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 133,070 Area (in2) 28.27 REPORT OF TESTS Compressive Strength (psi) 4,710 Fracture Type Type2 Cylinder Marked Set No. - - 3 1 Age (days) 7 Diameter (in) 6.00 Date Tested 01/28/2008 3 2 02/18/2008 28 3 3 02/18/2008 28 3 4 03/17/2008 56 ~~ ~Q;J rnJ E] DO 0 . ..l4. -""-. \ Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 4 of 9 Rone Engineering " Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311316 Project No.: 0713408 Date of Service: 01/21/2008 Report Date: 01/30/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753 Placement Date: 01/21/20/18 Weather Conditions: Cloudy Time Sampled: 06:40am Temperature - Air: 430F Truck No: 103 Air Content: 4.2% Overall Placement Location: Paving parking lot north side of building 6 Batch time: 06:25am Concrete: 520F Ticket No: 18746 Unit Weight (pcf): NA Measured Slump (inches) 5.5 Sample Location: 760' west from northeast corner of building 6, sample taken from pump Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 126,460 Area (in') 28.27 Type 6 Age (days) 7 Diameter (in) 6.00 Cylinder Marked Set No. - - 4 1 Date Tested 01/28/2008 4 2 02/18/2008 4 3 02/18/2008 4 4 03/17/2008 ~rJ ~.u_~ ~)~ 5IE ~ Type 1 Type 2 Type 3 28 28 56 lSJ DO D Type 4 Type 5 REPORT OF TESTS Compressive Strength (psi) 4,470 Fracture Type Type5 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 5 of 9 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311316 Project No.: 0713408 Date of Service: 01/21/2008 Report Date: 01/30/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7753 Placement Date: 01/21/2008 Weather Conditions: Cloudy Time Sampled: 07:30am Temperature - Air: 43DF Truck No: 126 Air Content: 4.3% Overall Placement Location: Paving parking lot north side of building 6 Measured Slump (inches) Batch time: 07:17am Concrete: 500F Ticket No: 18757 Unit Weight (pct): NA Sample Location: 728' west from northeast corner of building 6, sample taken from pump REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 110,350 Cylinder Marked Date Set No. Tested 5 1 01/28/2008 5 2 02/18/2008 5 3 02/18/2008 5 4 03/17/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 ~l3 ~l9 [IE E] DO D Type 1 Type 2 Type 3 Type 4 Type 5 Area (in') 28.27 Compressive Strength (psi) 3,900 Fracture Type Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 6 of 9 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311316 Project No.: 0713408 Date of Service: 01/21/2008 Report Date: 01/30/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753 Placement Date: 01/21/2008 Weather Conditions: Cloudy Time Sampled: 08:35am Temperature - Air: 420F Truck No: 139 Air Content: 4.2% Overall Placement Location: Paving parking lot north side of building 6 Batch time: 08: 19am Concrete: 500F Ticket No: 18765 Unit Weight (pet): NA Measured Slump (inche~ ) 5.0 Sample Location: 692' west from northeast corner of building 6, sample taken from pump REPORT OF TESTS Cylinder Marked Date Set No. Tested 6 1 01/28/2008 6 2 02/18/2008 6 3 02/18/2008 6 4 03/17/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 ~E3 ~Q] 5IE [;J DO D Type 1 Type 2 Type 3 Type 4 Type 5 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 111 , 190 Compressive Strength (psi) 3,930 Fracture Type Type2 Area (in2) 28.27 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 7 of 9 Rone En2~ Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311316 Project No.: 0713408 Date of Service: 01/21/2008 Report Date: 01/30/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753 Placement Date: 01/21/2008 Weather Conditions: Cloudy Time Sampled: 09:10am Temperature - Air: 410F Truck No: 135 ~rCon~~: 4.2% Overall Placement Location: Paving parking lot north side of building 6 Batch time: 08:45am Concrete: 500F Ticket No: 18771 Unit Weight (pet): NA Measured Slump (inches) 5.0 Sample Location: 647' west from northeast corner of building 6, sample taken from pump Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 103,340 Area (in2) 28.27 Type 6 REPORT OF TESTS Compressive Strength (psi) 3,650 Fracture Type Type5 Cylinder Marked Date Set No. Tested 7 1 01/28/2008 7 2 02/18/2008 7 3 02/18/2008 7 4 03/17/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 0EJ ~Q] 5ru E:J DO D Type 1 . Type 2 Type 3 Type 4 Type 5 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 8 of 9 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 311724 Project No.: 0713408 Date of Service: 01/25/2008 Report Date: 01/30/2008 Project: Point West VI Coppell, Texas Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Fire lane and parking paving, south sidf of building from southwest corner to southeast corner of building Items Inspected: Co nfo rrn ing Non lIems Inspected: Co nfo rrn ing Non Items Inspected: Co nfo rrn ing Non Conforming Co nfo rm ing Co nfo rrn ing P lacing Drawings Bar Length Co lumn Ties Properly Approved x and Shape x Tied and Spaced NA Bar Size x Pro per B ar P lacem ent x Stirrup Spacing NA Bar Grade x Pro perly Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Pro per B ar Suppa rts x Co mer Bars NA Numberof Bars x ProperCover x Mechanical Splices NA Discrepancies / Comments: 1. Remove mud/soil from reinforcing steel. 2. Remove debris from placement area. 3. Add diagonal bars to water drains for better reinforcement. 4. Tie down steel at various locations. 5. Missing dowel bars from red wood. 6. Missing chairs. Re-inspection req uired. Technician: Jose Villanueva Started: 12:15pm Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Emmit Coots (1-ec copy) 1-cc Duke Construction, LP Attn: Mr. Emmit Coots 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis 1-cc Pacheco Koch Consulting Engineers Attn: Mr. Jack Evans Finished: 02:15pm Rone Engineering pdd ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 1