Loading...
Duke Lesley 3C-LR080207 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310170 Project No.: 0711530 Date of Service: 01/09/2008 Report Date: 02/07/2008 Project: Point West Office I, ~G Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 1 1 01/16/2008 7 6.00 28.27 143,840 5,090 1 2 02/06/2008 28 6.00 28.27 178,340 6,310 1 3 02/06/2008 28 6.00 28.27 170,250 6,020 Average 6,160 1 4 03/05/2008 56 Contrachr: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 0E3 ~~ rnJ E;J DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA Mix Design I.D.: 7752PW Placement Date: 01/09/2008 Weather Conditions: Cloudy Ti ne Sampled: 04:30am Temperature - Air: 390F Truck No: 142 Air Content: 4.7% Overall Placement Location: Paving, fire lane, west side of building 1 Batch time: 04:06am Concrete: 530F Ticket No: 18141 Unit Weight (pcf): NA Measured Slump (inches) 5.0 Sample Location: 10' north from southwest corner of building 1 Fracture Type Type2 Type3 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 14 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310170 Project No.: 0711530 Date of Service: 01/09/2008 Report Date: 02/07/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 2 1 01/16/2008 7 6.00 28.27 147,860 5,230 2 2 02/06/2008 28 6.00 28.27 181,240 6,410 2 3 02/06/2008 28 6.00 28.27 181,900 6,430 Average 6,420 2 4 03/05/2008 56 Contractor: Duke Construction. LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4.000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-106.4 ASTM C-138 ASTM C-39 ~EJ ~l9 Kl] E;J DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA Mix Design I.D.: 7752PW Placement Date: 01/09/2008 Weather Conditions: Cloudy Time Sampled: 06:00am Temperature - Air: 380F Truck No: 144 Air Content: 4.9% Overall Placement Location: Paving, fire lane, west side of building 1 Bate " time: 05:46am Concrete: 540F Ticket No: 18152 Unit Weight (pet): NA Measured Slump (inches) 5.0 Sample Location: 22' north from southwest corner of building 1 Fracture Type Type2 Type3 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, ele.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW) Page 3 of 14 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310170 Project No.: 0711530 Date ot Service: 01/09/2008 Report Date: 02/07/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in2) (Ibs) (psi) 3 1 01/16/2008 7 6.00 28.27 116,510 4,120 3 2 02/06/2008 28 6.00 28.27 162,560 5,750 3 3 02/06/2008 28 6.00 28.27 156,780 5,540 Average 5,650 3 4 03/05/2008 56 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 0t:3 ~0 fill1 t] DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA Mix Design 1.0.: 7752PW Placement Date: 01/09/2008 Weather Conditions: Cloudy Time Sampled: 07:08am Temperature - Air: 360F Truck No: 110 Air Content: 5.2% Overall Placement Location: Paving, fire lane, west side of building 1 Batch time: 06:34am Concrete: 580F Ticket No: 18160 Unit Weight (pet): NA Measured Slump (inches) 5.5 Sample Location: 63' north from southwest corner of building 1 Fracture Type Type2 Type2 Type6 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW) Page 5 of 14 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310170 Project No.: 0711530 Date of Service: 01/09/2008 Report Date: 02/07/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 4 1 01/16/2008 7 6.00 28.27 106,200 3,760 4 2 02/06/2008 28 6.00 28.27 152,440 5,390 4 3 02/06/2008 28 6.00 28.27 156,510 5,540 Average 5,460 4 4 03/05/2008 56 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 0[3 [I][EJ fl] E;J DO D Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA M~x Design 1.0.: 7752PW Placement Date: 01/09/2008 Weather Conditions: Cloudy Time Sampled: 08:25am Temperature - Air: 360F Truck No: 137 Air Content: 4.6% Overall Placement Location: Paving, fire lane, west side of building 1 Batch time: 01:24am Concrete: 600F Ticket No: 18170 Unit Weight (pet): NA Mea!'>ured Slump (inches) 5.5 Sample Location: 90' north from southwest corner of building 1 Fracture Type Type6 Type6 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMIKW) Page 7 of 14 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, 8te 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310170 Project No.: 0711530 Date of Service: 01/09/2008 Report Date: 02/07/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CO~ltractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7752PW Placement Date: 01/09/2008 Weather Conditions: Sunny Time Sampled: 10:11am Temperature - Air: 490F Truck No: 128 Air Content: 4.6% Overall Placement Location: Paving, fire lane, west side of building 1 Batch time: 09:50am Concrete: 600F Ticket No: 18183 Unit Weight (pet): NA Measured Slump (inches) 5.5 Sample Location: 95' south from northwest corner of building 1 REPORT OF TESTS Maximum Compressive Age Diameter Area Load Strength (days) (in) (in2) (Ibs) (psi) 7 5.99 28.18 106,330 3,770 28 6.00 28.27 127,770 4,520 28 6.00 28.27 136,410 4,820 Average 4,670 56 [;] DO D Type 4 Type 5 Type 6 Cylinder Marked Set No. - - 5 1 Date Tested 01/16/2008 5 5 2 3 02/06/2008 02/06/2008 5 4 03/05/2008 ~t3 ~[J fillj Type 3 Type 1 Type 2 Concrete Compressive Cylinder 6" x 12" Fracture Type Type2 Type2 Type2 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMIKW) Page 9 of 14 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310170 Project No:: 0711530 Date of Service: 01/09/2008 Report Date: 02/07/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 6 1 01/16/2008 7 6.00 28.27 105,980 3,750 6 2 02/06/2008 28 6.00 28.27 149,100 5,270 6 3 02/06/2008 28 6.00 28.27 149,620 5,290 Average 5,280 6 4 03/05/2008 56 Contractor: Duke Constructiol'l, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 ~t3 ~[g fill] E;J DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA Mix Design 1.0.: 7752PW Placement Date: 01/09/2008 Weather Conditions: Sunny Time Sampled: 11 :OOam Temperature - Air: 540F Truck No: 142 Air Content: 4.8% Overall Placement Location: Paving, fire lane, west side of building 1 Batch time: 10:37am Concrete: 600F Ticket No: 18191 Unit Weight (pct): NA Measured Slump (inches) 5.0 Sample Location: 52' south from northwest corner of building 1 Fracture Type Type6 Type6 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMIKW) Page 11 of 14 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310170 Project No.: 0711530 Date of Service: 01/09/2008 Report Date: 02/07/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 7 1 01/16/2008 7 6.00 28.27 99,620 3,520 7 2 02/06/2008 28 6.00 28.27 152,900 5,410 7 3 02/06/2008 28 6.00 28.27 145,780 5,160 Average 5,280 7 4 03/05/2008 56 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 ~[] ~~ &m EJ DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA Mix Design 1.0.: 7752PW Placement Date: 01/09/2008 Weather Conditions: Sunny Time Samplel j: 01 :OOpm Temperature - Air: 580F Truck No: 128 Air Content: 3.8% Overall Placement Location: Paving, fire lane, west side of building 1 Batch time: 12:19pm Concrete: 630F Ticket No: 18207 Unit Weight (pet): NA Measured Slump (inche.. ) 5.5 Sample Location: 35' west from northwest corner of building 1 Fracture Type Type6 Type2 Type6 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 13 of 14