Loading...
Duke Lesley 2A-LR080125 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310882 Project No.: 0712932 Date of Service: 01/16/2008 Report Date: 01/25/2008 Project: Hemisphere's at Point West Cappell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site #10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Measured Slump (inches) 4.5 Mix Design I.D.: 7753 Placement Date: 01/16/2008 Weather Conditions: Partly cloudy, Ii jht wind Time Sampled: 03:40am Batch time: 03:21am Temperature - Air: 490F Concrete: 590F Truck No: 103 Ticket No: 10183 Air Content: 4.5% Unit Weight (pet): NA Overall Placement Location: Paving - building 7, south parking lot and loading dock area southeast corner of building Sample Location: 140' west, 10' south from southeast corner of building 7 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 01/23/2008 7 6.00 28.27 116,520 4,120 Type2 1 2 02/13/2008 28 1 3 02/13/2008 28 4 03/12/2008 56 ~E3 [9](;!] rnJ ~ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, LId. (CHIKW) Page 1 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310882 Project No.: 0712932 Date of Service: 01/16/2008 Report Date: 01/25/2008 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site #10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 Measured Slump (inches) 4.5 Mix Design I.D.: 7753 Placement Date: 01/16/2008 Weather Conditions: Partly cloudy, light wind Time Sampled: 05:00am Batch time: 04:49am Temperature - Air: 490F Concrete: 600F Truck No: 137 Ticket No: 10192 Air Content: 4.4% Unit Weight (pet): NA Overall Placement Location: Paving _ building 7, south parking lot and loading dock area southeast corner of building Sample Location: 125' west, 50' south from southeast corner of building 7 REPORT OF TESTS Cylinder Marked Date Set No. Tested 2 1 01/23/2008 2 2 02/13/2008 2 3 02/13/2008 2 4 03/12/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 ~tJ ~~ Ern EJ DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 106,640 Compressive Strength (psi) 3,770 Fracture Type Type2 Area (in') 28.27 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 3 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 89D8 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310882 Project No.: 0712932 Date of Service: 01/16/2008 Report Date: 01/25/2008 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP roncrete Supplier: Potter Concrete Plant: On site #10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 Measured Slump (inches) 5.0 Mix Design 1.0.: 7753 Placement Date: 01/16/2008 Weather Conditions: Partly cloudy, light wind Time Sampled: 06:05am Batch time: 05:54am Temperature - Air: 500F Concrete: 610F Truck No: 144 Ticket No: 10202 Air Content: 4.6% Unit Weight (pcf): NA Overall Placement Location: Paving _ building 7, south parking lot and loading dock area southeast comer of building Sample Location: 160' west, 100' south from southeast corner of building 7 REPORT OF TESTS Cylinder Marked Date Set No. Tested 3 1 01/23/2008 3 2 02/13/2008 3 3 02/13/2008 3 4 03/12/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 ~~ ~[g [ill] ~ DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 103,430 Compressive Strength (psi) 3,660 Fracture Type Type2 Area (in') 28.27 Type 6 LIMIT A nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no contno!. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 4 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310882 Project No.: 0712932 Date of Service: 01/16/2008 Report Date: 01/25/2008 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete SuppF~r: Potter Concret,." Plant: On site #10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Measured Slump (inches) 5.0 Mix Design I.D.: 7753 Placement Date: 01/16/2008 Weather Conditions: Partly cloudy, light wind Time Sampled: 07:00am Batch time: 06:51 am Temperature - Air: 480F Concrete: 590F Truck No: 140 Ticket No: 10212 Air Content: 4.4% Unit Weight (pet): NA Overall Placement Location: Paving - building 7, south parking lot and loading dock area southeast comer of building Sample Location: 100' west, 70' south from southeast corner of building 7 REPORT OF TESTS Cylinder Marked Set No. - - 4 1 4 2 Diameter (in) Age (days) 28 28 Date Tested 02/13/2008 02/13/2008 4 3 HOLD Comments: Damaged and Untestable Concrete Compressive Cylinder" x 12" Maximum Load (Ibs) Compressive Strength (psi) Fracture Type Area (in2) LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 6 of 8 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310882 Project No.: 0712932 Date of Service: 01/16/2008 Report Date: 01/25/2008 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site #10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 5" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Measured Slump (inches) 5.0 Mix Design I.D.: 7753 Placement Date: 01/16/2008 Weather Conditi:.>ns: Partly cloudy, light wind Time Sampled: 08:40am Batch time: 08:20am Temperature - Air: 480F Concrete: 590F Truck No: 137 Ticket No: 10222 Air Content: 4.5% Unit Weight (pcf): NA Overall Placement Location: Paving _ building 7, south parking lot and loading dock area southeast corner of building Sample Location: 50' west, 20' south from southeast corner of building 7 REPORT OF TESTS Technician: Pat Parks Started: 02:30am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Cylinder Marked Date Set No. Tested 5 1 01/23/2008 5 2 02/13/2008 5 3 02/13/2008 5 4 03/12/2008 Age (days) 7 Diameter (in) 6.00 28 28 56 raEJ ~[g &E E;] DO D Type 1 Type 2 Type 3 Type 4 Type 5 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 105,790 Compressive Strength (psi) 3,740 Fracture Type Type5 Area (in') 28.27 Type 6 Rone Engineering pd~ Finished: 10:DOam K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upDn the specific samples prDvided for testing. We assume nD respDnsibility fDr variation in quality (compDsitiDn, appearance, etc.) or any other feature of similar subject matter provided by persons or cDnditions Dver which we have nD control. Our letters and reports are fDr the exclus;ve use Df the clients tD whom they are addressed and shall nDt be reproduced except in full withDut the written approval of RDne Engineering Services, Ltd. (CH/KW) Page 8 of 8