Loading...
WA9601B-LR 990709StanTech Engineering 9200 King Arthur Ddve Dallas, Texas 75247-3610 Phone 214/631-4372 F~ 214/631~0 Mr. Kenneth Griffin, P.E. Project No.: 1520COP01 City of C0ppell Project: Sandy Lake Road 255 Parkway Boulevard Location: Utility Trench Fill Post Office Box 478 Report No.: 15/0311 Coppell, Texas 75019-4409 RESULTS OF FIELD DENSITY TESTS TEST DATE RETEST TEST LOCATION LIFT/ PROCTOR FIELD FIELD PERCENT NO. OF DEPTH TEST DENSITY MOISTURE OF TEST NO. PCF % SPECIFIED NUIVlBER COIvIPACTION 46 07/09/99 24" Water Line Backfill 30' East of -r 2 100.2 17.0 95.7 State Road 47 07/09/99 24" Water Line Backfill @ ~h of State -6' 2 100.8 17.9 96.3 Road TESTS PERFORMED BY: Walter Kirby TEST METHODS: ASTM D 2922, D 3017 D 1558, D2167 OR D 2937 REMARKS: PROCTOR NO.: 1 - 110.4 per @ 15.6% Moisture 2 - 104.7 per@ 13.9% Moisture 3 - 107.6 per@ 17.3% Moisture 4-119.0 per@ 12.3% Moisture Average of#1 and #4 - 115.1 pcf@ 13.9% Moisture 5 - 114.9 pcf@ 13.6% Moisture SPECIFICATION: 95% Compaction @ Optimum to +5% DISTRIBUTION: