Loading...
Duke Lesley 2A-LR080218 Rone En~=a Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 308805 Project No.: 0712932 Date of Service: 12/21/2007 Report Date: 02/18/2008 Project: Hemisphere's at Point West -:lj", Coppell, Texas I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7753 PW Placement Date: 12/21/2007 Weatt,er Conditions: Sunny Time Sampled: 08:45am Temperature - Air: 570F Truck No: 104 Air Content: 6.0% Overall Placement Location: Southwest ramp Batch time: 08:23am Concrete: 560F Ticket No: 17772 Unit Weight (pcf): NA Measured Slump (inches) 5.5 Sample Location: 30' south, 20' east from northwest corner of ramp REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 12/28/2007 7 6.00 28.27 107,470 3,800 Type5 1 2 01/18/2008 28 6.00 28.27 136,050 4,810 Type6 1 3 01/18/2008 28 6.00 28.27 133,040 4,710 Type3 Average 4,760 1 4 02/15/2008 56 6.00 28.27 148,000 5,230 Type2 l...~->J.l>7j ~rrl'l [-..gr- >< / '" .' -.~ .-..-.... --.--- -- -- ':~] [~] [J I~] [~'l Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reprOduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 1 of 2 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 308805 Project No.: 0712932 Date of Service: 12/21/2007 Report Date: 02/18/2008 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7753 PW Placement Date: 12/21/2007 Weather Conditions: E unny Time Sampled: 10:10am Temperature - Air: 5850F Truck No: 130 Air Content: 6.0% Overall Placement Location: Southwest ramp Batch time: 09:55am Concrete: 560F Ticket No: 9979 Unit Weight (pet): NA Measured Slump (inches) 4.5 Sample Location: 50' south, 40' west from northeast corner of ramp REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 2 1 12/28/2007 7 6.00 28.27 117,580 4,160 Type5 2 2 01/18/2008 28 6.00 28.27 157,280 5,560 Type2 2 3 01/18/2008 28 6.00 28.27 156,520 5,540 Type3 Average 5,550 2 4 02/15/2008 56 6.00 28.27 183,270 6,480 Type2 ~~EJ [9JQ] ~ [SJ [][=J [='1 Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Finished: 11 :45am Technician: Danny Howard Started: 07:30am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Atln: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Alln: Mr Ryan Skelly 1-cc City of Coppell Alln: Mr. Lee Stone 1-cc City of Coppell Alln: Mr. Larry Davis Rone Engineering P-~ ;:;:> K. Scott Watson, AET Project Manager LIMITATION S: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persorls or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd. (KW/KW) Page 2 of 2