Loading...
Billingsley-CS080222 THE.CITY.OF - ....--..-..-.-,,-.--.-..-.------^.-..-.-..-.--- ---- COPPELL February 22, 2008 ',;~."':':,";;, ~~~. -,~) l,<"'-, ri,~>'?' (>i_(~~::;:",;'.;/II~"'> :).! .......-;-;-.-t;-..'. ~.,\..\;r. -_1_ 'I..JfIJ~~~--~i-( -~.---'. .~: rr:. . ~0,;::'~ "'}' l'...:;:-":,-~..:-::;-- ^ . .-"./~"'-,.....~,~ \) (' 0t;J ~~~ ~~_.-- (:;;;;5""~ q -t ./" l\ A ,) \ David Littleton, P.E. Halff Associates, Inc. 8616 Northwest Plaza Dallas, TX 75225 RE: Billingsley 158+ Acre Tract Construction Plan Review Comments The City of Coppell has reviewed the referenced plans and they will be approved on the condition that the following comments will be addressed. General 1. The easement for the storm drain should be 20'. 2. Has TXU approved the outfall in their easement? 3. How does the outfall drain properly with the flow line lower than the existing grade? We are concerned that the possible standing water will be an issue with the business owners and they will blame the city. With these comments addressed the plans will be approved. The City of Coppell requires three sets of final construction plans for its use; your office should submit as many additional sets for stamping as is necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City ofCoppell along with a copy of the City's standard construction details. All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This includes dirt work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in the public right-of-way or easement, the City charges a 4% fee. A check for inspection fees made to the City of Coppell should be submitted to this office along with the Construction Development Permit Application and a copy of the Construction Site Notice. For your convenience a spreadsheet is attached to the permit application for use in calculating the inspection fees. A copy of the contract(s) should be attached for verification purposes. If you have any questions, please contact me at your convenience. Sincerely, .-7tlb Michael Garza, E.I.T Graduate Engineer Office Phone: (972) 304-3679 Fax: (972) 304-3570 255 PARK\NAY * POBOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673