Loading...
DR9101-CS 910412April 12, 1991 ~r~Shazo, Starek & Tang, Inc. E~lglneers · Planner~ By:. Engineering Mr. Larry Davis Development Construction Inspector city of Coppell Post office Box 478 Coppell, Texas 75019 Re: Oak Trail Drainage Dear Mr. Davis: As you requested, we are enclosing a draft of a notice regarding the proposed Oak Trail Drainage project. Please review and let us know if any changes need to be made. Sincerely, Glenn Hitt, P.E. Vice President GH/s~h 89256.20 Encl. 330 Union Station Dallas, Texas 75202-4802 2141748-6740 Metro 214/263-5428 Fax 214/748-7037 This is to notify you that construction of a new under- ground storm drainage pipe in your neighborhood will begin in a few weeks. The pipeline will begin at 121 Oak Trail Drive along Lane. However, 6 weeks. and proceed north along Oak Trail Drive and east Willoway Lane to a point just west of Shady Dale Access to homes will be maintained at all times. Willoway Lane will be closed to traffic for 4 to Total construction time for this project will be 8 to 10 weeks.