DR9101-CS 910412April 12, 1991
~r~Shazo, Starek & Tang, Inc.
E~lglneers · Planner~
By:. Engineering
Mr. Larry Davis
Development Construction Inspector
city of Coppell
Post office Box 478
Coppell, Texas 75019
Re: Oak Trail Drainage
Dear Mr. Davis:
As you requested, we are enclosing a draft of a notice
regarding the proposed Oak Trail Drainage project. Please
review and let us know if any changes need to be made.
Sincerely,
Glenn Hitt, P.E.
Vice President
GH/s~h
89256.20
Encl.
330 Union Station
Dallas, Texas 75202-4802
2141748-6740 Metro 214/263-5428
Fax 214/748-7037
This is to notify you that construction of a new under-
ground storm drainage pipe in your neighborhood will begin
in a few weeks. The pipeline will begin at 121 Oak Trail
Drive
along
Lane.
However,
6 weeks.
and proceed north along Oak Trail Drive and east
Willoway Lane to a point just west of Shady Dale
Access to homes will be maintained at all times.
Willoway Lane will be closed to traffic for 4 to
Total construction time for this project will be
8 to 10 weeks.