Project Updates:
. City said it is highly likely that plans will be split into two separate construction contracts.
Asked FNI to prepare Contract Amendment for this.
. storm drain and drop inlet at Denton Tap and Bethel will be added back to design.
. Sidewalk will not be s~ with construction plans East of Penfolds Lane except along
bridge. 'b,,; H-
Tasks and deliverables:
.
Upcoming Submittals and Meetings:
Submittal/Meeting
. 100% Plan Submittal
. Stakeholder meeting
DATE
12/07/07
TBD
Additional Information:
. Mitchell Street storm drain installation may require water line relocation