Loading...
Duke Lesley 1A-LR080226 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311788 Project No.: 0713408 Date of Service: 01/28/2008 Report Date: 02/26/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 1 1 02/04/2008 7 6.00 28.27 108,700 3,840 1 2 02/25/2008 28 6.00 28.27 154,100 5,450 1 3 02/25/2008 28 5.98 28.09 158,080 5,630 Average 5,540 1 4 03/24/2008 56 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 ~Ej [gJ~ ~ Q DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 Mix Design I.D.: 7753 Placement Date: 01/28/2008 Weather Conditions: Clear Time Sampled: 03:20am Temperature - Air: 470F Truck No: 136 Air Content: 5.5% Overall Placement Location: (Paving) South side loading parking spaces Measured Slump (inches) 5.75 Batch time: 02:54am Concrete: 580F Ticket No: 18794 Unit Weight (pcf): NA Sample Location: Grid line U35.7, 90' south Fracture Type Type2 Type5 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CHfKW) Page 1 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Uttle York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311788 Project No.: 0713408 Date of Service: 01/28/2008 Report Date: 02/26/2008 Project: Point West VI Coppell, Texas Services: Obtain samples offresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 7753 Placement Date: 01/28/2008 Weather Conditions: Clear Time Sampled: 04:15am Temperature - Air: 450F Truck No: 136 Air Content: 5.0% Overall Placement Location: (Paving) South side loading parking spaces Measured Slump (inches) 5.5 Batch time: 04:12am Concrete: 570F Ticket No: 18808 Unit Weight (pet): NA Sample Location: Grid line U34.3, 70' south REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 2 1 02/04/2008 7 6.00 28.27 122,120 4,320 Type5 2 2 02/25/2008 28 6.00 28.27 165,250 5,840 Type2 2 3 02/25/2008 28 6.00 28.27 173,510 6,140 Type5 Average 5,990 2 4 03/24/2008 56 rats] ~~ ~ ~ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd. (CH/KW) Page 2 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311788 Project No.: 0713408 Date of Service: 01/28/2008 Report Date: 02/26/2008 Project: Point West VI Cappell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753 Placement Date: 01/28/2008 Weather Conditions: Clear, windy Time Sampled: 05:24am Batch time: 05:04am Temperature - Air: 470F Concrete: 530F Truck No: 109 Ticket No: 18820 Air Content: 5.5% Unit Weight (pct): NA Overall Placement Location: (Paving) South side loading parking spaces Measured Slump (inches) 5.0 Sample Location: Grid line U33.3, 50' south REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (inZ) (Ibs) (psi) Type 3 1 02/04/2008 7 6.00 28.27 126,690 4,480 Type5 3 2 02/25/2008 28 6.00 28.27 171,480 6,060 Type2 3 3 02/25/2008 28 6.00 28.27 170,260 6,020 Type2 Average 6,040 3 4 03/24/2008 56 ~EJ ~~ ~ ~ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 3 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311788 Project No.: 0713408 Date of Service: 01/28/2008 Report Date: 02/26/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753 Placement Date: 01/28/2008 Weather Conditions: Clear, windy Time Sampled: 07:15am Batch time: 05:54am Temperature - Air: 500F Concrete: 570F Truck No: 109 Ticket No: 18831 Air Content: 5.0% Unit Weight (pcf): NA Overall Placement Location: (Paving) South side loading parking spaces Measured Slump (inches) 5.75 Sample Location: Grid line U31.9, 30' south REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 4 1 02/04/2008 7 6.00 28.27 120,070 4,250 Type5 4 2 02/25/2008 28 6.00 28.27 158,200 5,600 Type5 4 3 02/25/2008 28 6.00 28.27 161,740 5,720 Type2 Average 5,660 4 4 03/24/2008 56 Bt:j ~~ 5rn ~ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 5 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311788 Project No.: 0713408 Date of Service: 01/28/2008 Report Date: 02/26/2008 Project~ Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 5 1 02/04/2008 7 6.00 28.27 111,700 3,950 5 2 02/25/2008 28 6.00 28.27 154,580 5,470 5 3 02/25/2008 28 6.00 28.27 159,470 5,640 Average 5,550 5 4 03/24/2008 56 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 0[3 [1]~ 5IE Q DO D Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA Mix Design 1.0.: 7753 Placement Date: 01/28/2008 Weather Conditions: Mostly cloudy Time Sampled: 08:15am Batch time: 07:47am Temperature - Air: 520F Concrete: 530F Truck No: 128 Ticket No: 18848 Air Content: 5.8% Unit Weight (pet): NA Overall Placement Location: (Paving) South side loading parking spaces Measured Slump (inches) 5.75 Sample Location: Grid line L/30.5, 25' south Fracture Type Type6 Type6 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 6 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311788 Project No.: 0713408 Date of Service: 01/28/2008 Report Date: 02126/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753 Placement Date: 01/28/2008 Weather Conditions:. Mostly cloudy Time Sampled: 09:15am Batch time: 08:51am Temperature - Air: 530F Concrete: 550F Truck No: 104 Ticket No: 18859 Air Content: 5.7% Unit Weight (pet): NA Overall Placement Location: (Paving) South side loading parking spaces Measured Slump (inches) 5.25 Sample Location: Grid line U29.1 , 45' south REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 6 1 02/04/2008 7 6.00 28.27 109,110 3,860 TypeS 6 2 02/25/2008 28 6.00 28.27 149,490 5,290 Type2 6 3 02/25/2008 28 5.99 28.18 159,340 5,650 Type6 Average 5,470 6 4 03/24/2008 56 ~t:j [1][2] 5IE [SJ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 UMlTA TIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 7 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador RcVI, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311788 Project No.: 0713408 Date of Service: 01/28/2008 Report Date: 02/26/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7753 Placement Date: 01/28/2008 Weather Conditions: Mostly cloudy Time Sampled: 11 :OOam Batch time: 10:32am Temperature - Air: 570F Concrete: 560F Truck No: 136 Ticket No: 18872 Air Content: 5.3% Unit Weight (pet): NA Overall Placement Location: (Paving) South side loading parking spaces Measured Slump (inches) 5.75 Sample Location: Grid line U28.5, 85' south REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 7 1 02/04/2008 7 6.00 28.27 110,910 3,920 Type2 7 2 02/25/2008 28 6.00 28.27 160,230 5,670 Type6 7 3 02/25/2008 28 6.00 28.27 157,140 5,560 Type2 Average 5,610 7 4 03/24/2008 56 ~EJ ~~ 5l] L] DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 8 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 311788 Project No.: 0713408 Date of Service: 01/28/2008 Report Date: 02/26/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perfonn required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 8 1 02/04/2008 7 6.00 28.27 108,260 3,830 8 2 02/25/2008 28 6.00 28.27 164,470 5,820 8 3 02/25/2008 28 6.00 28.27 159,980 5,660 Average 5,740 8 4 03/24/2008 56 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Req uirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 raEJ ~~ [E lSJ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Mix Design 1.0.: 7753 Placement Date: 01/28/2008 Weather Conditions: Clear Time Sampled: 11 :45am Temperature - Air: 580F Truck No: 104 Air Content: 5.5% Overall Placement Location: (Paving) South side loading parking spaces Measured Slump (inches) 5.5 Batch time: 11 :23am Concrete: 510F Ticket No: 18881 Unit Weight (pet): NA Sample Location: Grid line U27.3, 37' south Fracture Type Type6 Type2 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 10 of 11