Loading...
DR9101-CS 910208February 8, 1991 Ms. Shohre ~aneshmand, P.E. Post Office Box 478 Coppell, Texas 75019 De~hazo, St~rek & Tang, Inc. Engineers · Planners Re: Oak Trail Drainage Dear Ms. Daneshmand: This is to inform you of the status of the Oak Trail Drainage project. We met with Larry Davis and Jim Ragsdale on January 31, 1991, at which time we were instructed to proceed with the advertising of the project. We immediately sent a "Notice to Contractors" to Texas Contractor, Dodge Reports and about ten contractors. Thus far, three contractors have secured the plans. The bid date will be 10:00 a.m. on February 19, 1991. Ads will run in the Coppell paper on the 8th and the 15th of February. I understand that you are aware of the question about the size of the inlet at the beginning of the proposed storm sewer. The plans have been corrected by enlarging the size of the inlet to accommodate the proposed 33-inch pipe. If you have any questions regarding this project, please let us know. Sincerely, Glenn Hi~t, P.E. Vice President GH/smh 89256.20 330 Union Station Dallas, Texas 75202-4802 214/748-6740 Metro 214/263-5428 Fax 214/748-7037