Loading...
Duke Lesley 3C-CS080314 Mar 14 08 10:29a Debbie Ingram 972-462-5199 p.1 MEMORANDUM FROM TIlE DEPARTMENT OF PUBLIC WORKS To: Larry Davis, Construction Inspector Engineering Noe Sorto, Streets Division Public Works March 14t 2008 Final WaJk-tbru Duke Leslie Addition From: Date: RE: ~---- -- ?~ "-,,,'.)1"~ ' PAVING 1. All OK. . .----.---------. /"'.,...;...... /' -..... ~/IY // ft-ifV1 / .P/ltPtrft' (;011 J, Q -" lrJ I)cJr CITY OF COPPELL PU.BLJC WORKS DEPARTMEI\'T Mar 14 08 02:58p Debbie Ingram 972-462-5199 p.1 THE-CITY-Or: "b/'1)Z: g COPPELL .~*~. 1'i!'J( ~ l\oql:) ~ 8 - \ MEMORANDUM TO: Larry Davis, Engineering Co T' '7 T t' :re;f.", f/p(,(/t'~v V FROM: Danny Hightower, Public Works DATE: March 14,2008 REF: Point West, Lot 3, Block C, 1525 S. Belt Line 1. Need papelWork on all DC's for irrigation 2. Raise meter cans to grade 3_ Clean domestic to lower fittings 4. Clean around pipes in meter cans for irrigation and dom. DC's 5. Need to lock two vault lids 6. Vaults need to be dry to insp.; full of water. 7. Vaults need to be 3" higher than grade for drainage around vaults 8. Need blocking under valves in vaults. 9. Repair first FH from second vault on Belt Line 10. Paint lid on second FH valve red 1 I. Raise second FH; too low, needs extension 12. Paint lid to FLV to building red 13. VauJts grate around pipes coming into vault 14. Mark CO in red on curb at sewer clean outs Call 972-462-5150 to schedule Danny Hightower to check punch list when completed.