MEMORANDUM
FROM TIlE
DEPARTMENT OF PUBLIC WORKS
To:
Larry Davis, Construction Inspector Engineering
Noe Sorto, Streets Division Public Works
March 14t 2008
Final WaJk-tbru Duke Leslie Addition
From:
Date:
RE:
~----
--
?~
"-,,,'.)1"~ '
PAVING
1. All OK.
. .----.---------.
/"'.,...;......
/'
-.....
~/IY
//
ft-ifV1
/
.P/ltPtrft'
(;011
J, Q -"
lrJ I)cJr
CITY OF COPPELL PU.BLJC WORKS DEPARTMEI\'T
Mar 14 08 02:58p
Debbie Ingram
972-462-5199
p.1
THE-CITY-Or:
"b/'1)Z: g
COPPELL
.~*~.
1'i!'J( ~ l\oql:)
~ 8 - \
MEMORANDUM
TO:
Larry Davis, Engineering
Co T' '7 T t' :re;f.",
f/p(,(/t'~v V
FROM: Danny Hightower, Public Works
DATE: March 14,2008
REF: Point West, Lot 3, Block C, 1525 S. Belt Line
1. Need papelWork on all DC's for irrigation
2. Raise meter cans to grade
3_ Clean domestic to lower fittings
4. Clean around pipes in meter cans for irrigation and dom. DC's
5. Need to lock two vault lids
6. Vaults need to be dry to insp.; full of water.
7. Vaults need to be 3" higher than grade for drainage around vaults
8. Need blocking under valves in vaults.
9. Repair first FH from second vault on Belt Line
10. Paint lid on second FH valve red
1 I. Raise second FH; too low, needs extension
12. Paint lid to FLV to building red
13. VauJts grate around pipes coming into vault
14. Mark CO in red on curb at sewer clean outs
Call 972-462-5150 to schedule Danny Hightower to check punch list when completed.