Loading...
Duke Lesley-CS080220 (2) , Duke CONSTRUCTION February 20, 2008 Ken Griffin, P .E. Director of Engineering & Public Works City of Coppell 255 Parkway Blvd Coppell, TX 75019 Re: City of CoppeU Final Acceptance - Point West Infrastructure Dear Ken: This letter is to serve as a formal request for final acceptance of the aforementioned project with the following conditions. 1) Installation of ILNS signs on the Belt Line RoadlDividend Road traffic signal (complete on/about Feb 29) 2) Installation of Clary battery backup on the Belt Line RoadlDividend Road traffic signal (complete on/about March 14) 3) Affidavit of payment from Durable Specialties (complete on/about March 14) As the issues listed above are minor in scope with relation to the overall project, we request a final acceptance of the overall Lesley Infrastructure project with the conditions and accompanied time lines listed above. Additionally, I have attached the formal request for the remaining funds spelled out in the Developer's Agreement to be distributed. If you have any questions or require further information, please do not hesitate to contact me at 972-361-6714. Sincerely, DUKE CONSTRUCfION L.P. /{4 1S-x- Alex Bennett, P.E. Development Services Manager cc: Keith Marvin- Engineering, City of Coppell Larry Davis- Engineering, City of Coppell Mindi Hurley- Economic Development Coordinator, City of Coppell File Ene. 14241 N. Dallas Parkway Suite 1000 Dallas, TX 75254 972.361.6700 www.dukerealty.com Atlanta Baltimore Chicago Cincinnati Cleveland Columbus Dallas Houston Indianapolis M inneapol is Nashvi lie Orlando Phoenix Tampa Raleigh Washington DC St. Louis South Florida