Re: City of CoppeU Final Acceptance - Point West Infrastructure
Dear Ken:
This letter is to serve as a formal request for final acceptance of the aforementioned project with the following
conditions.
1) Installation of ILNS signs on the Belt Line RoadlDividend Road traffic signal (complete on/about
Feb 29)
2) Installation of Clary battery backup on the Belt Line RoadlDividend Road traffic signal (complete
on/about March 14)
3) Affidavit of payment from Durable Specialties (complete on/about March 14)
As the issues listed above are minor in scope with relation to the overall project, we request a final acceptance of
the overall Lesley Infrastructure project with the conditions and accompanied time lines listed above.
Additionally, I have attached the formal request for the remaining funds spelled out in the Developer's
Agreement to be distributed.
If you have any questions or require further information, please do not hesitate to contact me at 972-361-6714.
Sincerely,
DUKE CONSTRUCfION L.P.
/{4 1S-x-
Alex Bennett, P.E.
Development Services Manager
cc: Keith Marvin- Engineering, City of Coppell
Larry Davis- Engineering, City of Coppell
Mindi Hurley- Economic Development Coordinator, City of Coppell
File
Ene.
14241 N. Dallas Parkway
Suite 1000
Dallas, TX 75254
972.361.6700
www.dukerealty.com
Atlanta
Baltimore
Chicago
Cincinnati
Cleveland
Columbus
Dallas
Houston
Indianapolis
M inneapol is
Nashvi lie
Orlando
Phoenix Tampa
Raleigh Washington DC
St. Louis
South Florida