Loading...
DR9101-CS 900830August 30, 1990 MS. ShohD~an/~eanes~hmand, P.E. City o~/Coppell Post Office Box 478 Coppell, Texas 75019 ~ _,hazo, Starek & Tang, Inc. Engineers · Planners Re: Oak Trail Drainage Dear Ms. Daneshmand: Enclosed are two sets of final plans for the Oak Trail Drainage project. We will complete the specifications when a bid date has been set. The drainage easement and exhibit were sent to you yesterday under separate cover. As discussed with Mr. Larry Davis, we recommend that an inlet not be added on the east side of Oak Trail Drive because the drainage naturally flows toward the east away from the street. Mr. Davis said he would try to coordinate the uncovering of the existing sanitary sewer line by city forces to more accurately determine its elevation. This could prevent delays during construction. If you have any questions about this material, please let us know. Sincerely, ~ __ Glenn Hitt, P.E. Vice President GH/smh Encl. 330 Union Station Dallas, Texas 75202-4802 214/748-6740