Loading...
Duke Lesley 3C-LR080307 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310170 Project No.: 0711530 Date of Service: 01/09/2008 Report Date: 03/07/2008 Project: Point West Office 1)3G Services: Obtain samples of fresh concrete at the placement locations, perfonm required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7752PW Placement Date: 01/09/2008 Weather Conditions: Cloudy Time Sampled: 04:30am Temperature - Air: 390F Truck No: 142 Air Content: 4.7% Overall Placement Location: Paving, fire lane, west side of building 1 Batch time: 04:06am Concrete: 530F Ticket No: 18141 Unit Weight (pet): NA Measured Slump (inches) 5.0 Sample Location: 10' north from southwest corner of building 1 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 01/16/2008 7 6.00 28.27 143,840 5,090 Type2 1 2 02/06/2008 28 6.00 28.27 178,340 6,310 Type3 1 3 02/06/2008 28 6.00 28.27 170,250 6,020 Type2 Average 6,160 1 4 03/05/2008 56 6.00 28.27 198,420 7,020 Type2 02] ~[g till] bJ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 14 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310170 Project No.: 0711530 Date of Service: 01/09/2008 Report Date: 03/07/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in2) (Ibs) (psi) 2 1 01/16/2008 7 6.00 28.27 147,860 5,230 2 2 02/06/2008 28 6.00 28.27 181,240 6,410 2 3 02/06/2008 28 6.00 28.27 181,900 6,430 Average 6,420 2 4 03105/2008 56 6.00 28.27 188,410 6,660 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 ~t3 ~('Q]' ,I ( t~ _.....~...... Type 2 till] bJ DO D Type 3 Type 4 Type 5 Type 1 PROJECT DATA Mix Design 1.0.: 7752PW Placement Date: 01/09/2008 Weather Conditions: Cloudy Time Sampled: 06:00am Temperature - Air: 380F Truck No: 144 Air Content: 4.9% Overall Placement Location: Paving, fire lane, west side of building 1 Batch time: 05:46am Concrete: 540F Ticket No: 18152 Unit Weight (pet): NA Measured Slump (inches) 5.0 Sample Location: 22' north from southwest corner of building 1 Fracture Type Type2 Type3 Type2 Type3 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (TM/KW) Page 3 of 14 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310170 Project No.: 0711530 Date of Service: 01/09/2008 Report Date: 03/07/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7752PW Placement Date: 01/09/2008 Weather Conditions: Cloudy Time Sampled: 07:08am Temperature - Air: 360F Truck No: 110 Air Content: 5.2% Overall Placement Location: Paving, fire lane, west side of building 1 Batch time: 06:34am Concrete: 580F Ticket No: 18160 Unit Weight (pcf): NA Measured Slump (inches) 5.5 Sample Location: 63' north from southwest corner of building 1 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (dars) (in) (in2) (Ibs) (psi) Type 3 1 01/16/2008 7 6.00 28.27 116,510 4,120 Type2 3 2 02/06/2008 28 6.00 28.27 162,560 5,750 Type2 3 3 02/06/2008 28 6.00 28.27 156,780 5,540 Type6 Average 5,650 3 4 03/05/2008 56 6.00 28.27 193,700 6,850 Type2 ~~ ~l9 [E EJ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 5 of 14 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310170 Project No.: 0711530 Date of Service: 01/09/2008 Report Date: 03/07/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7752PW Placement Date: 01/09/2008 Weather Conditions: Cloudy Time Sampled: 08:25am Temperature - Air: 360F Truck No: 137 Air Content: 4.6% Overall Placement Location: Paving, fire lane, west side of building 1 Batch time: 07:24am Concrete: 600F Ticket No: 18170 Unit Weight (pcf): NA Measured Slump (inches) 5.5 Sample Location: 90' north from southwest corner of building 1 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 4 1 01/16/2008 7 6.00 28.27 106,200 3,760 Type6 4 2 02/06/2008 28 6.00 28.27 152,440 5,390 Type6 4 3 02/06/2008 28 6.00 28.27 156,510 5,540 Type2 Average 5,460 4 4 03/05/2008 56 6.00 28.27 176,700 6,250 Type3 [a[3 ~[g fIE t;J DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 7 of 14 Rone Engineering " Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310170 Project No.: 0711530 Date of Service: 01/09/2008 Report Date: 03/07/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7752PW Placement Date: 01/09/2008 Weather Conditions: Sunny Time Sampled: 10:11am Temperature - Air: 490F Truck No: 128 Air Content: 4.6% Overall Placement Location: Paving, fire lane, west side of building 1 Batch time: 09:50am Concrete: 600F Ticket No: 18183 Unit Weight (pet): NA Measured Slump (inches) 5.5 Sample Location: 95' south from northwest corner of building 1 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 5 1 01/16/2008 7 5.99 28.18 106,330 3,770 Type2 5 2 02/06/2008 28 6.00 28.27 127,770 4,520 Type2 5 3 02/06/2008 28 6.00 28.27 136,410 4,820 Type2 Average 4,670 5 4 03/05/2008 56 6.00 28.27 143,520 5,080 Type2 ~E3 ~0 f\Gl tJ DO D ' f. [ j..~--l ., ~. Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMIKW) Page 9 of 14 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310170 Project No.: 0711530 Date of Service: 01/09/2008 Report Date: 03/07/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 6 1 01/16/2008 7 6.00 28.27 105,980 3,750 6 2 02/06/2008 28 6.00 28.27 149,100 5,270 6 3 02/06/2008 28 6.00 28.27 149,620 5,290 Average 5,280 6 4 03/05/2008 56 6.00 28.27 154,150 5,450 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 l8jt:j ~~ em Q DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA Mix Design 1.0.: 7752PW Placement Date: 01/09/2008 Weather Conditions: Sunny Time Sampled: 11 :OOam Temperature - Air: 540F Truck No: 142 Air Content: 4.8% Overall Placement Location: Paving, fire lane, west side of building 1 Batch time: 10:37am Concrete: 600F Ticket No: 18191 Unit Weight (pet): NA Measured Slump (inches) 5.0 Sample Location: 52' south from northwest corner of building 1 Fracture Type Type6 Type6 Type2 Type5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our ietters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 11 of 14 Rone Engineering .. Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310170 Project No.: 0711530 Date of Service: 01/09/2008 Report Date: 03/07/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 1 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7752PW Placement Date: 01/09/2008 Weather Conditions: Sunny Time Sampled: 01 :OOpm Temperature - Air: 580F Truck No: 128 Air Content: 3.8% Overall Placement Location: Paving, fire lane, west side of building 1 Batch time: 12:19pm Concrete: 630F Ticket No: 18207 Unit Weight (pcf): NA Measured Slump (inches) 5.5 Sample Location: 35' west from northwest corner of building 1 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 7 1 01/16/2008 7 6.00 28.27 99,620 3,520 Type6 7 2 02/06/2008 28 6.00 28.27 152,900 5,410 Type2 7 3 02/06/2008 28 6.00 28.27 145,780 5,160 Type6 Average 5,280 7 4 03/05/2008 56 5.99 28.18 157,410 5,590 Type2 ~2j LJJ QJ [tj E;J DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 13 of 14 Rone Engineering .. Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 312906 Project No.: 0711530 Date of Service: 02/07/2008 Report Date: 03/07/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 08:33am Concrete: 640F Ticket No: 19235 Unit Weight (pcf): NA Measured Slump (inches) 8.0 Mix Design I.D.: 7750PW Placement Date: 02/07/2008 Weather Conditions: Sunny Time Sampled: 09:30am Temperature - Air: 460F Truck No: 141 Air Content: 8.0% Overall Placement Location: City sidewalks on Beltline Rd. from southeast corner of property to south of center approach Sample Location: Truck cover 2/3 from north end of placement REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 02/14/2008 7 6.00 28.27 96,680 3,420 Type6 1 2 03/06/2008 28 6.00 28.27 116,430 4,120 Type2 1 3 03/06/2008 28 6.00 28.27 119,120 4,210 Type5 Average 4,170 1 4 04/03/2008 56 MOO rrmm RTIl n DO D ~ LJ d tj lJJJJ C:J Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Started: 09:00am Finished: 10:30am Technician: Alejandro Avendano Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. David Miller (1-ec copy) 1-ec Duke Construction, LP Altn: Mr. Jason Sulzener 1-cc City of Coppell AUn: Mr. Larry Davis 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc Polter Concrete AUn: Mr Ryan Skelly Rone Engineering P-~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples previded for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no contrel. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW) Page 1 of 1