Loading...
Duke Lesley 3C-LR080213 (2) Rone Engineering . 8908 Ambassador Row, Dallas, TX T5247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 02/13/2008 btain samples of fresh concrete at the placemen ons, perform required testing, cast compressive strength samples and bring "mo'" bd to~, I,bomto~ ,o?v t' ~~:::~~ri:; Ji% g Contractor: Duke Construction, LP Mix Design I.D.: 7752 Concrete Supplier: Potter Concrete Placement Date: 01/15/2008 Plant: 10 Weather Conditions: Clear Specification Requirements Time Sampled: 04:30am Strength: 4,000 psi @ 28 days Temperature - Air: 340F Slump (in.): 3" - 5" Truck No: 117 Air (%): 3% - 5% Air Content: 4.8% Test Method: ASTM C-172 Overall Placement Location: ASTM C-31 (except 10.1.2) Fire lane paving - North side of building 1 ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 Batch time: 04: 13am Concrete: 500F Ticket No: 10097 Unit Weight (pet): NA Sample Location: 30' west from northeast corner of building 1 - sample taken from truck REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in2) (Ibs) (psi) 1 1 01/22/2008 7 6.00 28.27 122,240 4,320 1 2 02/12/2008 28 6.00 28.27 160,700 5,680 1 3 02/12/2008 28 6.00 28.27 151,380 5,350 Average 5,520 1 4 03/11/2008 56 ~E:j ~[g lli] E] DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Measured Slump (inches) 4.0 Fracture Type Type2 Type5 Type3 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 1 of 20 Rone Engineering " Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 02/13/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7752 Placement Date: 01/15/2008 Weather Conditions: Clear Time Sampled: 05:40am Temperature - Air: 350F Truck No: 109 Air Content: 5.1 % Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 05:30am Concrete: 520F Ticket No: 10108 Unit Weight (pet): NA Measured Slump (inches) 4.0 Sample Location: 20' north from northeast corner of building 1 - sample taken from truck REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 2 1 01/22/2008 7 6.00 28.27 123,430 4,370 Type2 2 2 02/12/2008 28 5.98 28.09 159,850 5,690 Type2 2 3 02/12/2008 28 6.00 28.27 165,930 5,870 Type2 Average 5,780 2 4 03/11/2008 56 0EJ [@]~ fillj Q DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CHIKW) Page 3 of 20 Rone Engineering - .. Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 02/13/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 3 1 01/22/2008 7 6.00 28.27 112,450 3,980 3 2 02/12/2008 28 6.00 28.27 147,460 5,220 3 3 02/12/2008 28 6.00 28.27 140,070 4,950 Average 5,080 3 4 03/11/2008 56 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 rVlI)('! oU ~(r~t f f. { .J.----l -"'--''- Type 2 fft] LSJ DO D Type 3 Type 4 Type 5 Type 1 PROJECT DATA Mix Design 1.0.: 7752 Placement Date: 01/15/2008 Weather Conditions: Clear Time Sampled: 06:38am Temperature - Air: 390F Truck No: 140 Air Content: 4.4% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 06: 1 Oam Concrete: 540F Ticket No: 10115 Unit Weight (pct): NA Measured Slump (inches) 4.0 Sample Location: 90' east from northeast corner of building 1 - sample taken from pump Fracture Type Type6 Type6 Type6 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 5 of 20 Rone Engineering .. Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 02/13/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 4 1 01/22/2008 7 6.00 28.27 111,410 3,940 4 2 02/12/2008 28 6.00 28.27 131,050 4,630 4 3 02/12/2008 28 6.00 28.27 138,300 4,890 Average 4,760 4 4 03/11/2008 56 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 la~ l@][g ~ E] DO D Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA Mix Design 1.0.: 7752 Placement Date: 01/15/2008 Weather Conditions: Sunny Time Sampled: 08:21am Temperature - Air: 350F Truck No: 130 Air Content: 4.3% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 07:52am Concrete: 530F Ticket No: 10126 Unit Weight (pcf): NA Measured Slump (inches) 4.5 Sample Location: 24' east from southeast corner of building 1 - sample taken from pump Fracture Type Type5 Type2 TypeS Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 7 of 20 Rone Engineering .. 'if' . , , f~:, Client: Duke Construction, LP 14241 Dallas Pkvvy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 02/13/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7752 Placement Date: 01/15/2008 Weather Conditions: Sunny Time Sampled: 10: 15am Temperature - Air: 500F Truck No: 117 Air Content: 4.5% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 09:53am Concrete: 580F Ticket No: 10144 Unit Weight (pcf): NA Measured Slump (inches) 4.5 Sample Location: 90' south from southeast corner of building 1 (center) - sample taken from pump REPORT OF TESTS Cylinder Marked Set No. - - 5 1 Date Tested 01/22/2008 Age (days) 7 Diameter (in) 6.00 5 5 2 3 02/12/2008 02/12/2008 28 28 5 03/11/2008 56 4 Mrx1 rrmnl. ~~U Ut::J f:JDDD Krn Type 3 Type 4 Type 5 Type 1 Type 2 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 120,700 Compressive Strength (psi) 4,270 Fracture Type Type3 Area (in') 28.27 6.00 6.00 28.27 28.27 154,170 153,590 Average 5,450 5,430 5,440 Type2 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 9 of 20 Rone Engineering ~} . ',+J -~ ~t.... _. Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (2141630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date ot Service: 01/15/2008 Report Date: 02/13/2008 Project: Point West Office I Services: Obtain samples of fresh cOncrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) - 6 1 01/22/2008 7 6.00 28.27 99,740 3,530 6 2 02/12/2008 28 6.00 28.27 122,930 4,350 6 3 02/12/2008 28 5.99 28.18 123,880 4,400 Average 4,370 6 4 03/11/2008 56 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 FVlrx] rrmm RTn n O' - D O' ..... ~rj ~~ L\w ~ . Type 1 Type 2 Type 5 Type 3 Type 4 PROJECT DATA Mix Design I.D.: 7752 Placement Date: 01/15/2008 Weather Conditions: Sunny Time Sampled: 10:41 am Temperature - Air: 610F Truck No: 101 Air Content: 4.2% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 10:16am Concrete: 570F Ticket No: 10149 Unit Weight (pet): NA Measured Slump (inches) 4.5 Sample Location: 180' south from southeast corner of building 1 - sample taken from pump Fracture Type Type2 Type6 Type6 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 11 of 20 f~one Engineering fl ., Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 02/13/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in2) (Ibs) (psi) 7 1 01/22/2008 7 6.00 28.27 150,260 5,310 7 2 02/12/2008 28 6.00 28.27 169,900 6,010 7 3 02/12/2008 28 6.00 28.27 177,410 6,270 Average 6,140 7 4 03/11/2008 56 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 ~EJ ~~ ~ t] DO 0 Type 1 Type 2 Type 3 Type 4 Type 5 PROJECT DATA Mix Design I.D.: 7752 Placement Date: 01/15/2008 Weather Conditions: Sunny Time Sampled: 12:30pm Temperature - Air: 600F Truck No: 117 Air Content: 4.7% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 12:00pm Concrete: 640F Ticket No: 10162 Unit Weight (pcf): NA Measured Slump (inches) 4.0 Sample Location: 270' south from southeast corner of building 1 - sample taken from pump Fracture Type Type2 Type2 Type6 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 13 of 20 Rone Engineering . . \~f.: Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 02/13/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in2) (Ibs) (psi) 8 1 01/22/2008 7 6.00 28.27 127,460 4,510 8 2 02/12/2008 28 6.00 28.27 151 , 130 5,350 8 3 02/12/2008 28 6.00 28.27 165,530 5,850 Average 5,600 8 4 03/11/2008 56 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 0~ ~[g ~ E;J DO D Type 1 Type 3 Type 4 Type 5 Type 2 PROJECT DATA Mix Design 1.0.: 7752 Placement Date: 01/15/2008 Weather Conditions: Sunny Time Sampled: 01 :30pm Temperature - Air: 620F Truck No: 109 Air Content: 4.3% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 01 :08pm Concrete: 580F Ticket No: 10173 Unit Weight (pcf): NA Measured Slump (inches) 4.5 Sample Location: 360' south from southeast corner of building 1 - sample taken from pump Fracture Type Type6 Type5 Type6 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CHfKW) Page 15 of 20 Rone Engineering '" ..~ ~.. . p . '.iI,' ' : Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste SOO, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 02/13/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7752 Placement Date: 01/15/2008 Weather Conditions: Sunny Time Sampled: 02:10pm Temperature - Air: 650F Truck No: 109 Air Content: 4.6% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 01:41 pm Concrete: 610F Ticket No: 10179 Unit Weight (pcf): NA Measured Slump (inches) 4.5 Sample Location: 392' south from southeast corner of building 1 (center) - sample taken from truck REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 9 1 01/22/2008 7 6.00 28.27 88,410 3,130 Type6 9 2 02/12/2008 28 6.00 28.27 127,330 4,500 Type6 9 3 02/12/2008 28 6.00 28.27 120,950 4,280 Type6 Average 4,390 9 4 03/11/2008 56 ~rJ rrnl In 6~ Type 2 till] EJ DO D Type 1 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/KW) Page 17 of 20 Rone Engineering " - .. ' ~~ .," . ~... ~~ i' ':';- . "''''!>' ....f' . ~ . - ,.. Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 310749 Project No.: 0711530 Date of Service: 01/15/2008 Report Date: 02/13/2008 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 10 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3% - 5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7752 Placement Date: 01/15/2008 Weather Conditions: Sunny Time Sampled: 03: 1 Opm Temperature - Air: 650F Truck No: 117 Air Content: 4.7% Overall Placement Location: Fire lane paving - North side of building 1 Batch time: 01:59pm Concrete: 630F Ticket No: 18569 Unit Weight (pet): NA Measured Slump (inches) 4.0 Sample Location: 482' south from southeast corner of building 1 - sample taken from truck REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in2) (Ibs) (psi) 10 1 01/22/2008 7 6,00 28.27 84,790 3,000 10 2 02/12/2008 28 6.00 28.27 125,940 4,450 10 3 02/12/2008 28 6.00 28,27 121,670 4,300 Average 4,380 10 4 03/11/2008 56 8JrJ ~Q] fill] t] [JO D \. Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Fracture Type Type6 Type2 Type6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd, (CH/KW) Page 19 of 20