DR9101-CS 900719July 19, 1990 I ,azo, Starek & Tang, Inc. Engineers · Planners Ms. Shohre Daneshmand, P.E. City of Coppell Post office Box 478 Coppell, Texas 75019 Re: Oak Trail Drainage Dear Ms. Daneshmand: As requested, we have reviewed the design of the proposed Oak Trail storm sewer as follows: Item 1. To determine the severity of the sanitary sewer conflict by comparing field eleva- tions of manholes with plan elevations. Item 2. To develop costs of a storm sewer system to accommodate future flows if local streets are improved. Our conclusions regarding these items are as follows: Item 1. A comparison of field and plan elevations for the existing sanitary sewer manholes indicates differences which vary from 0.5 feet to almost 3 feet. It appears now that the profile of the existing storm sewer plans may be adjusted to eliminate a conflict between the existing sanitary sewer and proposed storm sewer without additional measures that we previously discussed. Item 2. The enclosed exhibit shows the size of storm sewer lines which we would recommend to accommodate future flows if the local streets are improved. The system is estimated to cost $20,300 more than the existing design. 330 Union Station Dallas, Texas 75202-4802 214/748.6740 Ms. Shohre Daneshmand, July 19, 1990 Page 2 P,Eo We also reviewed the size of the proposed storm sewer lines in the existing design, should the design discussed in Paragraph 2 above not be adopted. We recommend that the 33-inch line be increased to 36 inches from Station 0+00 to Station 5+00 as shown in the Oak Trail Drainage Study for Option 2. This is estimated to cost approximately $4500 more than the existing design. We are available to discuss these options at your convenience. Sincerely, n Hltt, P.E. Vice President GH/smh OAK TRAIl. PROPOSED DRAINA6E IMPROVEMENTS "~ I VICINITY MAP ~