Loading...
Duke Lesley 1A-LR080331 Rone Engineering " Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 312383 Project No.: 0713408 Date of Service: 02/01/2008 Report Date: 03/31/2008 Project: Point West VI) lit Cappell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 1 1 02/08/2008 7 6.00 28.27 107,840 3,810 1 2 02/29/2008 28 6.00 28.27 154,080 5,450 1 3 02/29/2008 28 6.00 28.27 161,940 5,730 Average 5,590 1 4 03/28/2008 56 6.00 28.27 165,480 5,850 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 ~~ ~~ &rn [;] DO D Type 1 Type 2 Type 3 Type 4 Type 5 Mix Design 1.0.: 7753 Placement Date: 02/01/2008 Weather Conditions: Clear Time Sampled: 03:30am Temperature - Air: 300F Truck No: 136 Air Content: 5.9% Overall Placement Location: Paving, loading dock parking on south side of building Measured Slump (inches) 5.75 Batch time: Concrete: 470F Ticket No: NA Unit Weight (pcf): NA Sample Location: Grid lines U123, 80' south Fracture Type Type6 Type6 Type5 Type6 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DMlKW) Page 1 of 9 Rone Engineering " Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 312383 Project No.: 0713408 Date of Service: 02/01/2008 Report Date: 03/31/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 2 1 02/08/2008 7 6.00 28.27 106,410 3,760 2 2 02/29/2008 28 6.00 28.27 152,950 5,410 2 3 02/29/2008 28 6.00 28.27 148,960 5,270 Average 5,340 2 4 03/28/2008 56 6.00 28.27 167,320 5,920 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 ~E3 rrmm r~6 Type 2 Ern lS] DO D Type 1 Type 3 Type 4 Type 5 Mix Design 1.0.: 7753 Placement Date: 02/01/2008 Weather Conditions: Clear Time Sampled: 04:45am Temperature - Air: 30DF Truck No: 144 Air Content: 6.0% Overall Placement Location: Paving, loading dock parking on south side of building Measured Slump (inches) 6.0 Batch time: Concrete: 48DF Ticket No: NA Unit Weight (pet): NA Sample Location: Grid lines U10.3, 45' south Fracture Type Type6 Type5 Type5 Type2 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DMfKW) Page 3 of 9 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 - 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 312383 Project No.: 0713408 Date of Service: 02/01/2008 Report Date: 03/31/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design J.D.: 7753 Placement Date: 02/01/2008 Weather Conditions: Clear Time Sampled: 06:45am Temperature - Air: 300F Truck No: 128 Air Content: 5.7% Overall Placement Location: Paving, loading dock parking on south side of building Measured Slump (inches) 5.75 Batch time: Concrete: 490F Ticket No: NA Unit Weight (pet): NA Sample Location: Grid lines U8.3, 10' south REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 3 1 02/08/2008 7 6.00 28.27 88,130 3,120 Type2 3 2 02/29/2008 28 6.00 28.27 118,920 4,210 Type6 3 3 02/29/2008 28 6.00 28.27 124,580 4,410 TypeS Average 4,310 3 4 03/28/2008 56 6.00 28.27 144,540 5,110 Type2 l8][3 ~Q] Krn [;J DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the dients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DM/KW) Page 5 of 9 Rone Engineering .. 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Concrete Compressive Strength Test Report No.: 312383 Project No.: 0713408 Date of Service: 02/01/2008 Report Date: 03/31/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 7753 Placement Date: 02/01/2008 Weather Conditions: Clear Time Sampled: 08:00am Temperature - Air: 320F Truck No: 128 Air Content: 5.9% Overall Placement Location: Paving, loading dock parking on south side of building Batch time: Concrete: 500F Ticket No: NA Unit Weight (pet): NA Measured Slump (inches) 4.75 Sample Location: Grid lines U7.7, 65' south REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 4 1 02/08/2008 7 6.00 28.27 131,050 4,630 4 2 02/29/2008 28 6.00 28.27 183,310 6,480 4 3 02/29/2008 28 6.00 28.27 171,050 6,050 Average 6,270 4 4 03/28/2008 56 6.00 28.27 197,500 6,990 Fracture Type Type6 Type2 Type6 Type5 ~23 ~~ ill] lSJ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DMlKW) Page 6 of 9 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX Ti040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 312383 Project No.: 0713408 Date of Service: 02/01/2008 Report Date: 03/31/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 7753 Placement Date: 02/01/2008 Weather Conditions: Clear Time Sampled: 09:15am Temperature - Air: 330F Truck No: 136 Air Content: 5.5% Overall Placement Location: Paving, loading dock parking on south side of building Measured Slump (inches) 5.5 Batch time: Concrete: 500F Ticket No: NA Unit Weight (pet): NA Sample Location: Grid lines US.?, 55' south REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 5 1 02/08/2008 7 6.00 28.27 137,730 4,870 Type6 5 2 02/29/2008 28 6.00 28.27 172,260 6,090 Type6 5 3 02/29/2008 28 6.00 28.27 183,250 6,480 Type6 Average 6,290 5 4 03/28/2008 56 5.99 28.18 192,020 6,810 Type2 ~L<J ~~ 5I] ~ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DMlKW) Page 8 of 9