Loading...
Duke Lesley 1A-LR080327 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Sle 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 312071 Project No.: 0713408 Date of Service: 01/30/2008 Report Date: 03/27/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 Batch time: 02:57am Concrete: 510F Ticket No: 18904 Unit Weight (pcf): NA Measured Slump (inches) 5.75 Mix Design I.D.: 7753 Placement Date: 01/30/2008 Weather Conditions: Clear Time Sampled: 03:30am Temperature - Air: 320F Truck No: 133 Air Content: 6.0% Overall Placement Location: (Paving) loading dock parking south side of building, parking spaces and driveway on northwest comer of building Sample Location: 60' west, 60' north from grid line A.1 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 02/06/2008 7 6.01 28.37 92,950 3,280 Type2 1 2 02/27/2008 28 6.00 28.27 137,680 4,870 Type3 1 3 02/27/2008 28 6.00 28.27 136,840 4,840 Type2 Average 4,850 1 4 03/26/2008 56 6.00 28.27 139,100 4,920 TypeS 0E3 ~~ 5IE l5J DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The lest results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KWIKW) Page 1 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 312071 Project No.: 0713408 Date of Service: 01/30/2008 Report Date: 03/27/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in2) (Ibs) (psi) 2 1 02/06/2008 7 6.00 28.27 96,320 3,410 2 2 02/27/2008 28 6.00 28.27 133,870 4,730 2 3 02/27/2008 28 6.00 28.27 147,600 5,220 Average 4,980 2 4 03/26/2008 56 6.00 28.27 157,580 5,570 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 ~E3 ~~ 51] E;] DO D Type 1 Type 2 Type 3 Type 4 Type 5 Batch time: 04: 11 am Concrete: 520F Ticket No: 18915 Unit Weight (pet): NA Measured Slump (inches) 5.75 Mix Design 1.0.: 7753 Placement Date: 01/30/2008 Weather Conditions: Clear Time Sampled: 04:35am Temperature - Air: 310F Truck No: 133 Air Content: 5.7% Overall Placement Location: (Paving) loading dock parking south side of building, parking spaces and driveway on northwest comer of building Sample Location: 50' north from grid line A.1 Fracture Type Type3 Type6 Type2 Type5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 2 of 11 Rone Engineering .. Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 312071 Project No.: 0713408 Date of Service: 01/30/2008 Report Date: 03/27/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 3 1 02/06/2008 7 6.00 28.27 95,100 3,360 3 2 02/27/2008 28 6.00 28.27 116,330 4,110 3 3 02/27/2008 28 6.00 28.27 126,500 4,470 Average 4,290 3 4 03/26/2008 56 6.00 28.27 128,740 4,550 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 ~[j ~Q] 5I] lSJ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Batch time: Concrete: 500F Ticket No: 18928 Unit Weight (pet): NA Measured Slump (inches) 6.0 Mix Design 1.0.: 7753 Placement Date: 01/30/2008 Weather Conditions: Clear Time Sampled: 05:47am Temperature - Air: 320F Truck No: 126 Air Content: 6.0% Overall Placement Location: (Paving) loading dock parking south side of building, parking spaces and driveway on northwest corner of building Sample Location: 30' north from grid line A.2 Fracture Type Type2 Type2 Type5 Type5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KWfKW) Page 3 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 312071 Project No.: 0713408 Date of Service: 01/30/2008 Report Date: 03/27/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Measured Slump (inches) 5.5 Mix Design 1.0.: 7753 Placement Date: 01/30/2008 Weather Conditions: Clear, windy Time Sampled: 08:31am Batch time: 08:00am Temperature - Air: 370F Concrete: 500F Truck No: 126 Ticket No: 18941 Air Content: 6.0% Unit Weight (pcf): NA Overall Placement Location: (Paving) loading dock parking south side of building, parking spaces and driveway on northwest corner of building Sample Location: 75' south from grid line U25.9 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 4 1 02/06/2008 7 6.00 28.27 114,470 4,050 Type5 4 2 02/27/2008 28 6.00 28.27 161,010 5,690 Type6 4 3 02/27/2008 28 6.00 28.27 155,110 5,490 Type5 Average 5,590 4 4 03/26/2008 56 6.00 28.27 164,490 5,820 Type6 ~E3 [l]QJ Krn ~ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KWIKW) Page 5 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 312071 Project No.: 0713408 Date of Service: 01/30/2008 Report Date: 03/27/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Measured Slump (inches) 5.25 Mix Design I.D.: 7753 Placement Date: 01/30/2008 Weather Conditions: Sunny, windy Time Sampled: 09:55am Batch time: Temperature - Air: 390F Concrete: 580F Truck No: 126 Ticket No: 18958 Air Content: 4.7% Unit Weight (pcf): NA Overall Placement Location: (Paving) loading dock parking south side of building, parking spaces and driveway on northwest corner of building Sample Location: 35' south from grid line U24.3 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 5 1 02/06/2008 7 6.00 28.27 137,840 4,880 Type6 5 2 02/27/2008 28 6.00 28.27 193,180 6,830 Type5 5 3 02/27/2008 28 6.00 28.27 197,970 7,000 Type2 Average 6,920 5 4 03/26/2008 56 6.00 28.27 196,920 6,960 Type6 [8]E3 [2]~ 5IE E;J DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 7 of 11 Rone Engineering .. Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador R.ow, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Report of Concrete Compressive Strength Test Report No.: 312071 Project No.: 0713408 Date of Service: 01/30/2008 Report Date: 03/27/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 Measured Slump (inches) 5.75 Mix Design I.D.: 7753 Placement Date: 01/30/2008 Weather Conditions: Sunny, windy Time Sampled: 11 :OOam Batch time: Temperature - Air: 380F Concrete: 600F Truck No: 139 Ticket No: 18968 Air Content: 5.8% Unit Weight (pcf): NA Overall Placement Location: (Paving) loading dock parking south side of building, parking spaces and driveway on northwest comer of building Sample Location: 10' south from grid line U22.9 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 6 1 02/06/2008 7 6.00 28.27 92,970 3,290 Type6 6 2 02/27/2008 28 6.00 28.27 144,500 5,110 Type6 6 3 02/27/2008 28 6.00 28.27 140,760 4,980 Type6 Average 5,040 6 4 03/26/2008 56 6.00 28.27 157,990 5,590 Type6 EJ~ ~Q] 5l] 5] DO D Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 L1MITA nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 8 of 11 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 71040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 312071 Project No.: 0713408 Date of Service: 01/30/2008 Report Date: 03/27/2008 Project: Point West VI Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Set No. Tested (days) (in) (in') (Ibs) (psi) 7 1 02/06/2008 7 6.00 28.27 121,680 4,300 7 2 02/27/2008 28 6.00 28.27 169,690 6,000 7 3 02/27/2008 28 6.00 28.27 173,960 6,150 Average 6,080 7 4 03/26/2008 56 6.00 28.27 174,210 6,160 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): 4% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 ~~ [g]0 [ill] ~ DO D Type 1 Type 2 Type 3 Type 4 Type 5 Measured Slump (inches) 5.75 Mix Design I.D.: 7753 Placement Date: 01/30/2008 Weather Conditions: Sunny, windy Time Sampled: 12: 15pm Batch time: 11 :27am Temperature - Air: 460F Concrete: 610F Truck No: 126 Ticket No: 18978 Air Content: 5.2% Unit Weight (pet): NA Overall Placement Location: (Paving) loading dock parking south side of building, parking spaces and driveway on northwest comer of building Sample Location: 40' south from grid line U21. 7 Fracture Type Type5 Type2 Type2 Type6 Type 6 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page10of11